Teacher Aids

Sort by:
{"id":4715978260569,"title":"(3 Ea) Large Print E-z Grader Royal Blue","handle":"3-ea-large-print-e-z-grader-royal-blue","description":"MPN: 005028\u003cbr\u003e\u003cbr\u003eUPC: 194629054107\u003cbr\u003eWe are proud to introduce the latest addition to our line of quality slide charts for the educator, the Large Print Royal Blue E-Z Grader. Scores up to 70 problems with up to 30 problems wrong. Actual size is 10\" x 5\". Sold as a pack of 3.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eLarge Print E-Z GraderThis enlarged chart has larger print and measures 10\" x 5\"Score any number of questions up to 71\u003cbr\u003eSKU: ERSEZ-7200-3","published_at":"2025-02-17T21:27:21-05:00","created_at":"2020-09-09T20:22:47-04:00","vendor":"Original E-z Grader","type":"Teacher Aids","tags":["Blue","Graders","Paperboard","Teacher Resource"],"price":3267,"price_min":3267,"price_max":3267,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156577693785,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSEZ-7200-3","requires_shipping":true,"taxable":true,"featured_image":{"id":14725309464665,"product_id":4715978260569,"position":1,"created_at":"2020-09-09T20:22:48-04:00","updated_at":"2020-09-09T20:22:48-04:00","alt":null,"width":2000,"height":2000,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEZ-7200-3.jpg?v=1599697368","variant_ids":[32156577693785]},"available":true,"name":"(3 Ea) Large Print E-z Grader Royal Blue","public_title":null,"options":["Default Title"],"price":3267,"weight":136,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629054107","featured_media":{"alt":null,"id":6896896147545,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2000,"width":2000,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEZ-7200-3.jpg?v=1599697368"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEZ-7200-3.jpg?v=1599697368"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEZ-7200-3.jpg?v=1599697368","options":["Title"],"media":[{"alt":null,"id":6896896147545,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2000,"width":2000,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEZ-7200-3.jpg?v=1599697368"},"aspect_ratio":1.0,"height":2000,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEZ-7200-3.jpg?v=1599697368","width":2000}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005028\u003cbr\u003e\u003cbr\u003eUPC: 194629054107\u003cbr\u003eWe are proud to introduce the latest addition to our line of quality slide charts for the educator, the Large Print Royal Blue E-Z Grader. Scores up to 70 problems with up to 30 problems wrong. Actual size is 10\" x 5\". Sold as a pack of 3.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eLarge Print E-Z GraderThis enlarged chart has larger print and measures 10\" x 5\"Score any number of questions up to 71\u003cbr\u003eSKU: ERSEZ-7200-3"}
(3 Ea) Large Print E-z Grader Royal Blue

(3 Ea) Large Print E-z Grader Royal Blue

$32.67

MPN: 005028UPC: 194629054107We are proud to introduce the latest addition to our line of quality slide charts for the educator, the Large Print Royal Blue E-Z Grader. Scores up to 70 problems with up to 30 problems wrong. Actual size is 10" x 5". Sold as a pack of 3.Key Features : Large Print E-Z GraderThis enlarged chart has larger print and me...


More Info
{"id":4715976130649,"title":"Nameplates Modern Cursive 36-pk 18 X 4 Upper Gr","handle":"nameplates-modern-cursive-36-pk-18-x-4-upper-gr","description":"MPN: 005019\u003cbr\u003e\u003cbr\u003eUPC: 044222145774\u003cbr\u003eThese Modern Cursive nameplates include a name line; modern cursive alphabet (uppercase and lowercase) with stroke lines; 0-12 multiplication table; place value chart with words, fractions, and numerals; fraction and decimal equivalents; and standard and metric rulers. Each nameplate is 18\" x 4\" and each pack includes 36 nameplates.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eEach pack includes 36 nameplatesNameplates measure 18” x 4”Modern cursive alphabet (uppercase and lowercase) with stroke linesCan be used for desk or cubby assignments, labels, work recognitionBold, uncluttered design ensures easy, at-a-glance use\u003cbr\u003eSKU: ERSCD-2072","published_at":"2025-04-10T19:22:56-04:00","created_at":"2020-09-09T20:21:14-04:00","vendor":"Carson Dellosa Education","type":"Teacher Aids","tags":["7-11 years","Multi","Name Plates","Paper"],"price":1136,"price_min":1136,"price_max":1136,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156574056537,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCD-2072","requires_shipping":true,"taxable":true,"featured_image":{"id":14725305729113,"product_id":4715976130649,"position":1,"created_at":"2020-09-09T20:21:15-04:00","updated_at":"2020-09-09T20:21:15-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-2072.jpg?v=1599697275","variant_ids":[32156574056537]},"available":true,"name":"Nameplates Modern Cursive 36-pk 18 X 4 Upper Gr","public_title":null,"options":["Default Title"],"price":1136,"weight":281,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"044222145774","featured_media":{"alt":null,"id":6896892411993,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-2072.jpg?v=1599697275"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-2072.jpg?v=1599697275"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-2072.jpg?v=1599697275","options":["Title"],"media":[{"alt":null,"id":6896892411993,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-2072.jpg?v=1599697275"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-2072.jpg?v=1599697275","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005019\u003cbr\u003e\u003cbr\u003eUPC: 044222145774\u003cbr\u003eThese Modern Cursive nameplates include a name line; modern cursive alphabet (uppercase and lowercase) with stroke lines; 0-12 multiplication table; place value chart with words, fractions, and numerals; fraction and decimal equivalents; and standard and metric rulers. Each nameplate is 18\" x 4\" and each pack includes 36 nameplates.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eEach pack includes 36 nameplatesNameplates measure 18” x 4”Modern cursive alphabet (uppercase and lowercase) with stroke linesCan be used for desk or cubby assignments, labels, work recognitionBold, uncluttered design ensures easy, at-a-glance use\u003cbr\u003eSKU: ERSCD-2072"}
Nameplates Modern Cursive 36-pk 18 X 4 Upper Gr

Nameplates Modern Cursive 36-pk 18 X 4 Upper Gr

$11.36

MPN: 005019UPC: 044222145774These Modern Cursive nameplates include a name line; modern cursive alphabet (uppercase and lowercase) with stroke lines; 0-12 multiplication table; place value chart with words, fractions, and numerals; fraction and decimal equivalents; and standard and metric rulers. Each nameplate is 18" x 4" and each pack includes...


More Info
{"id":4715971444825,"title":"Nameplates Traditional 36-pk 18 X 4 Cursive Upper Gr","handle":"nameplates-traditional-36-pk-18-x-4-cursive-upper-gr","description":"MPN: 005019\u003cbr\u003e\u003cbr\u003eUPC: 044222145781\u003cbr\u003eThese Traditional Cursive nameplates include a name line; traditional cursive alphabet (upper- and lowercase) with stroke lines; 0-12 multiplication table; place value chart with words, fractions, and numerals; fraction and decimal equivalents; and standard and metric rulers. Each nameplate is 18\" x 4\" and each pack includes 36 nameplates.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eCursive alphabet (upper- and lower-case) with stroke lines0-12 multiplication tablePlace value chart with words, fractions and numeralsFraction and decimal equivalents\u003cbr\u003eSKU: ERSCD-2073","published_at":"2025-04-10T19:51:46-04:00","created_at":"2020-09-09T20:16:27-04:00","vendor":"Carson Dellosa Education","type":"Teacher Aids","tags":["7-11 years","Multi","Name Plates","Paper"],"price":1136,"price_min":1136,"price_max":1136,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156565766233,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCD-2073","requires_shipping":true,"taxable":true,"featured_image":{"id":14725293736025,"product_id":4715971444825,"position":1,"created_at":"2020-09-09T20:16:27-04:00","updated_at":"2020-09-09T20:16:27-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-2073.jpg?v=1599696987","variant_ids":[32156565766233]},"available":true,"name":"Nameplates Traditional 36-pk 18 X 4 Cursive Upper Gr","public_title":null,"options":["Default Title"],"price":1136,"weight":281,"compare_at_price":null,"inventory_quantity":24,"inventory_management":"shopify","inventory_policy":"deny","barcode":"044222145781","featured_media":{"alt":null,"id":6896880418905,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-2073.jpg?v=1599696987"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-2073.jpg?v=1599696987"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-2073.jpg?v=1599696987","options":["Title"],"media":[{"alt":null,"id":6896880418905,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-2073.jpg?v=1599696987"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-2073.jpg?v=1599696987","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005019\u003cbr\u003e\u003cbr\u003eUPC: 044222145781\u003cbr\u003eThese Traditional Cursive nameplates include a name line; traditional cursive alphabet (upper- and lowercase) with stroke lines; 0-12 multiplication table; place value chart with words, fractions, and numerals; fraction and decimal equivalents; and standard and metric rulers. Each nameplate is 18\" x 4\" and each pack includes 36 nameplates.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eCursive alphabet (upper- and lower-case) with stroke lines0-12 multiplication tablePlace value chart with words, fractions and numeralsFraction and decimal equivalents\u003cbr\u003eSKU: ERSCD-2073"}
Nameplates Traditional 36-pk 18 X 4 Cursive Upper Gr

Nameplates Traditional 36-pk 18 X 4 Cursive Upper Gr

$11.36

MPN: 005019UPC: 044222145781These Traditional Cursive nameplates include a name line; traditional cursive alphabet (upper- and lowercase) with stroke lines; 0-12 multiplication table; place value chart with words, fractions, and numerals; fraction and decimal equivalents; and standard and metric rulers. Each nameplate is 18" x 4" and each pack i...


More Info
{"id":4715970199641,"title":"(24 Ea) C Line Red Std Lanyard With Swivel Hook","handle":"24-ea-c-line-red-std-lanyard-with-swivel-hook","description":"MPN: 000757\u003cbr\u003e\u003cbr\u003eUPC: 194629053902\u003cbr\u003eThis classic style features round woven, nylon material, which proves to be comfortable when worn around the neck. The metal hook securely attaches the ID badge to the lanyard, allowing the badge to be displayed. Durable lanyards allow for the prominent display of badges and ID cards without damaging clothing. Round woven, nylon material with swivel hook attachment. Measures 36\" long. Red. Pack of 24.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eDisplay badges and ID cards without damaging clothingRound woven, nylon material with swivel hook attachmentMeasures 36\" longRedPack of 24\u003cbr\u003eSKU: ERSCLI89314-24","published_at":"2024-09-04T01:22:48-04:00","created_at":"2020-09-09T20:15:16-04:00","vendor":"C-line Products Inc","type":"Teacher Aids","tags":["4+ years","Accessories","Metal","Nylon","Red"],"price":2269,"price_min":2269,"price_max":2269,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156563374169,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCLI89314-24","requires_shipping":true,"taxable":true,"featured_image":{"id":14725289082969,"product_id":4715970199641,"position":1,"created_at":"2020-09-09T20:15:17-04:00","updated_at":"2020-09-09T20:15:17-04:00","alt":null,"width":1800,"height":1800,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCLI89314-24.jpg?v=1599696917","variant_ids":[32156563374169]},"available":true,"name":"(24 Ea) C Line Red Std Lanyard With Swivel Hook","public_title":null,"options":["Default Title"],"price":2269,"weight":272,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629053902","featured_media":{"alt":null,"id":6896875765849,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1800,"width":1800,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCLI89314-24.jpg?v=1599696917"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCLI89314-24.jpg?v=1599696917"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCLI89314-24.jpg?v=1599696917","options":["Title"],"media":[{"alt":null,"id":6896875765849,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1800,"width":1800,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCLI89314-24.jpg?v=1599696917"},"aspect_ratio":1.0,"height":1800,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCLI89314-24.jpg?v=1599696917","width":1800}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 000757\u003cbr\u003e\u003cbr\u003eUPC: 194629053902\u003cbr\u003eThis classic style features round woven, nylon material, which proves to be comfortable when worn around the neck. The metal hook securely attaches the ID badge to the lanyard, allowing the badge to be displayed. Durable lanyards allow for the prominent display of badges and ID cards without damaging clothing. Round woven, nylon material with swivel hook attachment. Measures 36\" long. Red. Pack of 24.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eDisplay badges and ID cards without damaging clothingRound woven, nylon material with swivel hook attachmentMeasures 36\" longRedPack of 24\u003cbr\u003eSKU: ERSCLI89314-24"}
(24 Ea) C Line Red Std Lanyard With Swivel Hook

(24 Ea) C Line Red Std Lanyard With Swivel Hook

$22.69

MPN: 000757UPC: 194629053902This classic style features round woven, nylon material, which proves to be comfortable when worn around the neck. The metal hook securely attaches the ID badge to the lanyard, allowing the badge to be displayed. Durable lanyards allow for the prominent display of badges and ID cards without damaging clothing. Round w...


More Info
{"id":4715965513817,"title":"Differentiated Instruction Cubes 3 Pk","handle":"differentiated-instruction-cubes-3-pk","description":"MPN: 005019\u003cbr\u003e\u003cbr\u003eUPC: 044222205935\u003cbr\u003eDifferentiated Instruction Cubes are an excellent hands-on learning resource for centers or for small group instruction.\n\nThis set includes:\n• Three (3) 4\" x 4\" durable fabric cubes with clear plastic pockets\n• a comprehensive resource guide with cross-curricular activities\n• templates for create-your-own cards\n\nEach cube can provide a group of students with up to six different problems, prompts, tasks, or questions to discuss. Different groups can work with different cubes, allowing you to adjust the questions or tasks on each cube to best match your students' needs.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eIncluded are 3 durable fabric cubes with clear plastic pockets plus a comprehensive resource guide with cross-curricular activitiesThere are also templates provided for create-your-own cards\u003cbr\u003eSKU: ERSCD-146006","published_at":"2022-05-02T09:38:24-04:00","created_at":"2020-09-09T20:10:20-04:00","vendor":"Carson Dellosa Education","type":"Teacher Aids","tags":["4-11 years","Pocket Charts"],"price":2739,"price_min":2739,"price_max":2739,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156554788953,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCD-146006","requires_shipping":true,"taxable":true,"featured_image":{"id":14725280301145,"product_id":4715965513817,"position":1,"created_at":"2020-09-09T20:10:20-04:00","updated_at":"2020-09-09T20:10:20-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-146006.jpg?v=1599696620","variant_ids":[32156554788953]},"available":true,"name":"Differentiated Instruction Cubes 3 Pk","public_title":null,"options":["Default Title"],"price":2739,"weight":249,"compare_at_price":null,"inventory_quantity":25,"inventory_management":"shopify","inventory_policy":"deny","barcode":"044222205935","featured_media":{"alt":null,"id":6896866951257,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-146006.jpg?v=1599696620"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-146006.jpg?v=1599696620","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-146006_4.jpg?v=1599696622","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-146006_3.jpg?v=1599696624","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-146006_2.jpg?v=1599696625","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-146006_1.jpg?v=1599696626"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-146006.jpg?v=1599696620","options":["Title"],"media":[{"alt":null,"id":6896866951257,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-146006.jpg?v=1599696620"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-146006.jpg?v=1599696620","width":1500},{"alt":null,"id":6896866984025,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-146006_4.jpg?v=1599696622"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-146006_4.jpg?v=1599696622","width":1600},{"alt":null,"id":6896867016793,"position":3,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-146006_3.jpg?v=1599696624"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-146006_3.jpg?v=1599696624","width":2100},{"alt":null,"id":6896867049561,"position":4,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-146006_2.jpg?v=1599696625"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-146006_2.jpg?v=1599696625","width":1600},{"alt":null,"id":6896867082329,"position":5,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-146006_1.jpg?v=1599696626"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-146006_1.jpg?v=1599696626","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005019\u003cbr\u003e\u003cbr\u003eUPC: 044222205935\u003cbr\u003eDifferentiated Instruction Cubes are an excellent hands-on learning resource for centers or for small group instruction.\n\nThis set includes:\n• Three (3) 4\" x 4\" durable fabric cubes with clear plastic pockets\n• a comprehensive resource guide with cross-curricular activities\n• templates for create-your-own cards\n\nEach cube can provide a group of students with up to six different problems, prompts, tasks, or questions to discuss. Different groups can work with different cubes, allowing you to adjust the questions or tasks on each cube to best match your students' needs.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eIncluded are 3 durable fabric cubes with clear plastic pockets plus a comprehensive resource guide with cross-curricular activitiesThere are also templates provided for create-your-own cards\u003cbr\u003eSKU: ERSCD-146006"}
Differentiated Instruction Cubes 3 Pk

Differentiated Instruction Cubes 3 Pk

$27.39

MPN: 005019UPC: 044222205935Differentiated Instruction Cubes are an excellent hands-on learning resource for centers or for small group instruction. This set includes: • Three (3) 4" x 4" durable fabric cubes with clear plastic pockets • a comprehensive resource guide with cross-curricular activities • templates for create-your-own cards Each ...


More Info
{"id":4715962335321,"title":"Buzz-worthy Bees Nameplates","handle":"buzz-worthy-bees-nameplates","description":"MPN: 005019\u003cbr\u003e\u003cbr\u003eUPC: 9781483816067\u003cbr\u003eMake every student feel a part of the hive with personalized nameplates from the bright Buzz–Worthy Bees collection. These convenient nameplates are ideal for desk or cubby assignments or for labeling and organizing your classroom. They can easily be repositioned over and over again! Look for coordinating products in this character theme and an assortment of coordinating color palette designs to create an exciting, cohesive classroom theme! Pack includes 36 nameplates that measure 9.5\" x 2.875\" each.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eAdd a cheerful addition to students plain desks with Buzz-Worthy Bees desk nameplatesThese stylish nameplates are ideal for desk or cubby assignments or for labeling and organizing your classroomCoordinate these lovable characters with other Buzz-Worthy Bees productsMeasures 9.5\" x 2.875\"\u003cbr\u003eSKU: ERSCD-122033","published_at":"2025-04-10T19:51:31-04:00","created_at":"2020-09-09T20:07:29-04:00","vendor":"Carson Dellosa Education","type":"Teacher Aids","tags":["4-11 years","Card Stock","Multi","Name Plates"],"price":752,"price_min":752,"price_max":752,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156551020633,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCD-122033","requires_shipping":true,"taxable":true,"featured_image":{"id":14725276041305,"product_id":4715962335321,"position":1,"created_at":"2020-09-09T20:07:29-04:00","updated_at":"2020-09-09T20:07:29-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-122033.jpg?v=1599696449","variant_ids":[32156551020633]},"available":true,"name":"Buzz-worthy Bees Nameplates","public_title":null,"options":["Default Title"],"price":752,"weight":118,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"9781483816067","featured_media":{"alt":null,"id":6896862625881,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-122033.jpg?v=1599696449"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-122033.jpg?v=1599696449"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-122033.jpg?v=1599696449","options":["Title"],"media":[{"alt":null,"id":6896862625881,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-122033.jpg?v=1599696449"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-122033.jpg?v=1599696449","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005019\u003cbr\u003e\u003cbr\u003eUPC: 9781483816067\u003cbr\u003eMake every student feel a part of the hive with personalized nameplates from the bright Buzz–Worthy Bees collection. These convenient nameplates are ideal for desk or cubby assignments or for labeling and organizing your classroom. They can easily be repositioned over and over again! Look for coordinating products in this character theme and an assortment of coordinating color palette designs to create an exciting, cohesive classroom theme! Pack includes 36 nameplates that measure 9.5\" x 2.875\" each.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eAdd a cheerful addition to students plain desks with Buzz-Worthy Bees desk nameplatesThese stylish nameplates are ideal for desk or cubby assignments or for labeling and organizing your classroomCoordinate these lovable characters with other Buzz-Worthy Bees productsMeasures 9.5\" x 2.875\"\u003cbr\u003eSKU: ERSCD-122033"}
Buzz-worthy Bees Nameplates

Buzz-worthy Bees Nameplates

$7.52

MPN: 005019UPC: 9781483816067Make every student feel a part of the hive with personalized nameplates from the bright Buzz–Worthy Bees collection. These convenient nameplates are ideal for desk or cubby assignments or for labeling and organizing your classroom. They can easily be repositioned over and over again! Look for coordinating products in...


More Info
{"id":4715960959065,"title":"Eric Carle Dots Name Plates","handle":"eric-carle-dots-name-plates","description":"MPN: 005019\u003cbr\u003e\u003cbr\u003eUPC: 044222216856\u003cbr\u003eKeep your classroom seating organized with these colorful desk nameplates featuring the art of Eric Carle! Nameplates measure 9.5\" x 2.88\" and come 36 per pack. ™ \u0026amp; © 2012 Eric Carle LLC. Licensed by Chorion Rights Limited.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eIdeal for desk or cubby assignments, labels, work recognition, bookmarks and more36 nameplates per packMeasures 9.5\" x 2.88\"Available in a variety of prints and designsCoordinate products to create a stylish classroom theme\u003cbr\u003eSKU: ERSCD-122026","published_at":"2025-04-10T19:51:30-04:00","created_at":"2020-09-09T20:06:25-04:00","vendor":"Carson Dellosa Education","type":"Teacher Aids","tags":["4-11 years","Card Stock","Multi","Name Plates"],"price":752,"price_min":752,"price_max":752,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156548038745,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCD-122026","requires_shipping":true,"taxable":true,"featured_image":{"id":14725271814233,"product_id":4715960959065,"position":1,"created_at":"2020-09-09T20:06:25-04:00","updated_at":"2020-09-09T20:06:25-04:00","alt":null,"width":1600,"height":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-122026.jpg?v=1599696385","variant_ids":[32156548038745]},"available":true,"name":"Eric Carle Dots Name Plates","public_title":null,"options":["Default Title"],"price":752,"weight":249,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"044222216856","featured_media":{"alt":null,"id":6896858398809,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-122026.jpg?v=1599696385"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-122026.jpg?v=1599696385"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-122026.jpg?v=1599696385","options":["Title"],"media":[{"alt":null,"id":6896858398809,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-122026.jpg?v=1599696385"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-122026.jpg?v=1599696385","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005019\u003cbr\u003e\u003cbr\u003eUPC: 044222216856\u003cbr\u003eKeep your classroom seating organized with these colorful desk nameplates featuring the art of Eric Carle! Nameplates measure 9.5\" x 2.88\" and come 36 per pack. ™ \u0026amp; © 2012 Eric Carle LLC. Licensed by Chorion Rights Limited.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eIdeal for desk or cubby assignments, labels, work recognition, bookmarks and more36 nameplates per packMeasures 9.5\" x 2.88\"Available in a variety of prints and designsCoordinate products to create a stylish classroom theme\u003cbr\u003eSKU: ERSCD-122026"}
Eric Carle Dots Name Plates

Eric Carle Dots Name Plates

$7.52

MPN: 005019UPC: 044222216856Keep your classroom seating organized with these colorful desk nameplates featuring the art of Eric Carle! Nameplates measure 9.5" x 2.88" and come 36 per pack. ™ & © 2012 Eric Carle LLC. Licensed by Chorion Rights Limited.Key Features : Ideal for desk or cubby assignments, labels, work recognition, bookmarks and ...


More Info
{"id":4715960041561,"title":"Complete Calendar \u0026 Weather Pocket Chart","handle":"complete-calendar-weather-pocket-chart","description":"MPN: 005019\u003cbr\u003e\u003cbr\u003eUPC: 044222193416\u003cbr\u003eThe Complete Calendar and Weather Pocket Chart is great for implementing a dynamic classroom calendar and can also be used to reinforce patterning lessons and create \"Questions of the Day.\" It measures approximately 26\" x 37.25\" and features:\n\n• 2 clear pockets (26\" x 2\" each)\n• 49 clear pockets (approximately 3.75\" x 2\" each)\n• 208 cards (monthly, holiday, question of the day, season, and weather), many in Spanish and English\n• Flame retardant material and durable construction\n• Sturdy grommets for easy hanging\n• A teacher resource guide\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eResource guide26 inches x 37¼ inches(2) 26 inch x 2 inch clear pockets - 49 clear pockets, approx. 3.75 inches x 2 inches\u003cbr\u003eSKU: ERSCD-158003","published_at":"2021-09-28T21:58:59-04:00","created_at":"2020-09-09T20:05:11-04:00","vendor":"Carson Dellosa Education","type":"Teacher Aids","tags":["4-11 years","Dark Blue","Nylon\/Vinyl\/Paper","Pocket Charts"],"price":5068,"price_min":5068,"price_max":5068,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156546498649,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCD-158003","requires_shipping":true,"taxable":true,"featured_image":{"id":14725270208601,"product_id":4715960041561,"position":1,"created_at":"2020-09-09T20:05:11-04:00","updated_at":"2020-09-09T20:05:11-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158003.jpg?v=1599696311","variant_ids":[32156546498649]},"available":true,"name":"Complete Calendar \u0026 Weather Pocket Chart","public_title":null,"options":["Default Title"],"price":5068,"weight":340,"compare_at_price":null,"inventory_quantity":19,"inventory_management":"shopify","inventory_policy":"deny","barcode":"044222193416","featured_media":{"alt":null,"id":6896856760409,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158003.jpg?v=1599696311"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158003.jpg?v=1599696311","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158003_1.jpg?v=1599696314"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158003.jpg?v=1599696311","options":["Title"],"media":[{"alt":null,"id":6896856760409,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158003.jpg?v=1599696311"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158003.jpg?v=1599696311","width":2100},{"alt":null,"id":6896856793177,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158003_1.jpg?v=1599696314"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158003_1.jpg?v=1599696314","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005019\u003cbr\u003e\u003cbr\u003eUPC: 044222193416\u003cbr\u003eThe Complete Calendar and Weather Pocket Chart is great for implementing a dynamic classroom calendar and can also be used to reinforce patterning lessons and create \"Questions of the Day.\" It measures approximately 26\" x 37.25\" and features:\n\n• 2 clear pockets (26\" x 2\" each)\n• 49 clear pockets (approximately 3.75\" x 2\" each)\n• 208 cards (monthly, holiday, question of the day, season, and weather), many in Spanish and English\n• Flame retardant material and durable construction\n• Sturdy grommets for easy hanging\n• A teacher resource guide\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eResource guide26 inches x 37¼ inches(2) 26 inch x 2 inch clear pockets - 49 clear pockets, approx. 3.75 inches x 2 inches\u003cbr\u003eSKU: ERSCD-158003"}
Complete Calendar & Weather Pocket Chart

Complete Calendar & Weather Pocket Chart

$50.68

MPN: 005019UPC: 044222193416The Complete Calendar and Weather Pocket Chart is great for implementing a dynamic classroom calendar and can also be used to reinforce patterning lessons and create "Questions of the Day." It measures approximately 26" x 37.25" and features: • 2 clear pockets (26" x 2" each) • 49 clear pockets (approximately 3.75" x...


More Info
{"id":4715959386201,"title":"Deluxe Scheduling Pocket Chart","handle":"deluxe-scheduling-pocket-chart","description":"MPN: 005019\u003cbr\u003e\u003cbr\u003eUPC: 044222205430\u003cbr\u003eThe Deluxe Scheduling Pocket Chart is the easiest way to illustrate your classroom's daily schedule. You can also use it to reinforce time-telling lessons. Pocket chart measures approximately 13\" x 36\" and features: 12 clear pockets, a storage pocket with hook-and-loop tape closure, 15 write-on\/wipe-away cards, flame retardant material and durable construction, and turdy grommets for easy hanging.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eStorage pocket with hook-and-loop tape closure12 clear pocketsPocket chart measures approximately 13\" x 36\"\u003cbr\u003eSKU: ERSCD-158031","published_at":"2022-10-27T19:58:05-04:00","created_at":"2020-09-09T20:04:11-04:00","vendor":"Carson Dellosa Education","type":"Teacher Aids","tags":["Blue","Flame retardant fabric","Pocket Charts"],"price":2739,"price_min":2739,"price_max":2739,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156545744985,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCD-158031","requires_shipping":true,"taxable":true,"featured_image":{"id":14725269061721,"product_id":4715959386201,"position":1,"created_at":"2020-09-09T20:04:11-04:00","updated_at":"2020-09-09T20:04:11-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158031.jpg?v=1599696251","variant_ids":[32156545744985]},"available":true,"name":"Deluxe Scheduling Pocket Chart","public_title":null,"options":["Default Title"],"price":2739,"weight":213,"compare_at_price":null,"inventory_quantity":25,"inventory_management":"shopify","inventory_policy":"deny","barcode":"044222205430","featured_media":{"alt":null,"id":6896855613529,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158031.jpg?v=1599696251"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158031.jpg?v=1599696251","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158031_1.jpg?v=1599696254"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158031.jpg?v=1599696251","options":["Title"],"media":[{"alt":null,"id":6896855613529,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158031.jpg?v=1599696251"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158031.jpg?v=1599696251","width":1500},{"alt":null,"id":6896855646297,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158031_1.jpg?v=1599696254"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158031_1.jpg?v=1599696254","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005019\u003cbr\u003e\u003cbr\u003eUPC: 044222205430\u003cbr\u003eThe Deluxe Scheduling Pocket Chart is the easiest way to illustrate your classroom's daily schedule. You can also use it to reinforce time-telling lessons. Pocket chart measures approximately 13\" x 36\" and features: 12 clear pockets, a storage pocket with hook-and-loop tape closure, 15 write-on\/wipe-away cards, flame retardant material and durable construction, and turdy grommets for easy hanging.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eStorage pocket with hook-and-loop tape closure12 clear pocketsPocket chart measures approximately 13\" x 36\"\u003cbr\u003eSKU: ERSCD-158031"}
Deluxe Scheduling Pocket Chart

Deluxe Scheduling Pocket Chart

$27.39

MPN: 005019UPC: 044222205430The Deluxe Scheduling Pocket Chart is the easiest way to illustrate your classroom's daily schedule. You can also use it to reinforce time-telling lessons. Pocket chart measures approximately 13" x 36" and features: 12 clear pockets, a storage pocket with hook-and-loop tape closure, 15 write-on/wipe-away cards, flame ...


More Info
{"id":4715959320665,"title":"Chairback Buddy Blue-yellow","handle":"chairback-buddy-blue-yellow","description":"MPN: 005019\u003cbr\u003e\u003cbr\u003eUPC: 044222205522\u003cbr\u003eThe Chairback Buddy™ Pocket Chart is the perfect solution for your classroom organization needs and the easiest way to store supplies within reach! It slips over the back of most preschool and early elementary chairs, measures approximately 15\" wide x 19\" high x 2\" deep, and features: 6 storage pockets, a small clear pocket for name tag, a heavy-duty, washable canvas with PVC coating for added durability, and fits seat backs up to 30\" around, measuring 6\" from the top.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eA great way to keep supplies organized and within reach!Slips over the back of most preschool and early elementary chairs for extra storage and convenienceHeavy-duty, washable canvas has PVC coating for added durability\u003cbr\u003eSKU: ERSCD-158036","published_at":"2025-04-10T19:51:29-04:00","created_at":"2020-09-09T20:04:07-04:00","vendor":"Carson Dellosa Education","type":"Teacher Aids","tags":["4-13 years","Blue","Canvas with PVC coating","Storage","Yellow"],"price":1774,"price_min":1774,"price_max":1774,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156545548377,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCD-158036","requires_shipping":true,"taxable":true,"featured_image":{"id":14725268963417,"product_id":4715959320665,"position":1,"created_at":"2020-09-09T20:04:07-04:00","updated_at":"2020-09-09T20:04:07-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158036.jpg?v=1599696247","variant_ids":[32156545548377]},"available":true,"name":"Chairback Buddy Blue-yellow","public_title":null,"options":["Default Title"],"price":1774,"weight":172,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"044222205522","featured_media":{"alt":null,"id":6896855515225,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158036.jpg?v=1599696247"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158036.jpg?v=1599696247","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158036_1.jpg?v=1599696250"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158036.jpg?v=1599696247","options":["Title"],"media":[{"alt":null,"id":6896855515225,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158036.jpg?v=1599696247"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158036.jpg?v=1599696247","width":1500},{"alt":null,"id":6896855580761,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158036_1.jpg?v=1599696250"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158036_1.jpg?v=1599696250","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005019\u003cbr\u003e\u003cbr\u003eUPC: 044222205522\u003cbr\u003eThe Chairback Buddy™ Pocket Chart is the perfect solution for your classroom organization needs and the easiest way to store supplies within reach! It slips over the back of most preschool and early elementary chairs, measures approximately 15\" wide x 19\" high x 2\" deep, and features: 6 storage pockets, a small clear pocket for name tag, a heavy-duty, washable canvas with PVC coating for added durability, and fits seat backs up to 30\" around, measuring 6\" from the top.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eA great way to keep supplies organized and within reach!Slips over the back of most preschool and early elementary chairs for extra storage and convenienceHeavy-duty, washable canvas has PVC coating for added durability\u003cbr\u003eSKU: ERSCD-158036"}
Chairback Buddy Blue-yellow

Chairback Buddy Blue-yellow

$17.74

MPN: 005019UPC: 044222205522The Chairback Buddy™ Pocket Chart is the perfect solution for your classroom organization needs and the easiest way to store supplies within reach! It slips over the back of most preschool and early elementary chairs, measures approximately 15" wide x 19" high x 2" deep, and features: 6 storage pockets, a small clear ...


More Info
{"id":4715959222361,"title":"Chairback Buddy Blue-red","handle":"chairback-buddy-blue-red","description":"MPN: 005019\u003cbr\u003e\u003cbr\u003eUPC: 044222205515\u003cbr\u003eThe Chairback Buddy™ Pocket Chart is the ideal solution for your classroom storage needs and the easiest way to keep supplies organized and within reach! It slips over the back of most preschool and early elementary chairs, measures approximately 15\" wide x 19\" high x 2\" deep, and features 6 storage pockets, a small clear pocket for name tag, and a heavy-duty, washable canvas with PVC coating for added durability. Fits seat backs up to 30\" around, measuring 6\" from the top.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eA great way to keep supplies organized and within reachSlips over the back of most preschool and early elementary chairs for extra storage and convenienceHeavy-duty, washable canvas has PVC coating for added durabilityMeasures approximately 15\" wide x 19\" high x 2\" deep\u003cbr\u003eSKU: ERSCD-158035","published_at":"2025-04-10T19:22:50-04:00","created_at":"2020-09-09T20:04:01-04:00","vendor":"Carson Dellosa Education","type":"Teacher Aids","tags":["Blue","PVC coated canvas","Red","Storage"],"price":1774,"price_min":1774,"price_max":1774,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156545450073,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCD-158035","requires_shipping":true,"taxable":true,"featured_image":{"id":14725268766809,"product_id":4715959222361,"position":1,"created_at":"2020-09-09T20:04:01-04:00","updated_at":"2020-09-09T20:04:01-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158035.jpg?v=1599696241","variant_ids":[32156545450073]},"available":true,"name":"Chairback Buddy Blue-red","public_title":null,"options":["Default Title"],"price":1774,"weight":172,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"044222205515","featured_media":{"alt":null,"id":6896855318617,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158035.jpg?v=1599696241"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158035.jpg?v=1599696241","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158035_1.jpg?v=1599696244"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158035.jpg?v=1599696241","options":["Title"],"media":[{"alt":null,"id":6896855318617,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158035.jpg?v=1599696241"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158035.jpg?v=1599696241","width":2100},{"alt":null,"id":6896855351385,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158035_1.jpg?v=1599696244"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158035_1.jpg?v=1599696244","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005019\u003cbr\u003e\u003cbr\u003eUPC: 044222205515\u003cbr\u003eThe Chairback Buddy™ Pocket Chart is the ideal solution for your classroom storage needs and the easiest way to keep supplies organized and within reach! It slips over the back of most preschool and early elementary chairs, measures approximately 15\" wide x 19\" high x 2\" deep, and features 6 storage pockets, a small clear pocket for name tag, and a heavy-duty, washable canvas with PVC coating for added durability. Fits seat backs up to 30\" around, measuring 6\" from the top.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eA great way to keep supplies organized and within reachSlips over the back of most preschool and early elementary chairs for extra storage and convenienceHeavy-duty, washable canvas has PVC coating for added durabilityMeasures approximately 15\" wide x 19\" high x 2\" deep\u003cbr\u003eSKU: ERSCD-158035"}
Chairback Buddy Blue-red

Chairback Buddy Blue-red

$17.74

MPN: 005019UPC: 044222205515The Chairback Buddy™ Pocket Chart is the ideal solution for your classroom storage needs and the easiest way to keep supplies organized and within reach! It slips over the back of most preschool and early elementary chairs, measures approximately 15" wide x 19" high x 2" deep, and features 6 storage pockets, a small c...


More Info
{"id":4715957944409,"title":"Stoplight Pocket Chart","handle":"stoplight-pocket-chart","description":"MPN: 005019\u003cbr\u003e\u003cbr\u003eUPC: 044222198138\u003cbr\u003eThe Stoplight Pocket Chart is ideal for behavior, classroom, and center management as well as differentiating small group assignments! It measures approximately 19.75\" x 26\" and features: 6 nylon color pockets, 5 clear pockets, 30 write-on\/wipe away student sticks, flame retardant material and durable construction, sturdy grommets for easy hanging, and a teacher resource guide.\u003cbr\u003eSKU: ERSCD-158024","published_at":"2023-02-20T20:01:09-05:00","created_at":"2020-09-09T20:02:27-04:00","vendor":"Carson Dellosa Education","type":"Teacher Aids","tags":["4-9 years","Multi","Nylon\/Vinyl","Pocket Charts"],"price":3835,"price_min":3835,"price_max":3835,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156543811673,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCD-158024","requires_shipping":true,"taxable":true,"featured_image":{"id":14725265358937,"product_id":4715957944409,"position":1,"created_at":"2020-09-09T20:02:28-04:00","updated_at":"2020-09-09T20:02:28-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158024.jpg?v=1599696148","variant_ids":[32156543811673]},"available":true,"name":"Stoplight Pocket Chart","public_title":null,"options":["Default Title"],"price":3835,"weight":454,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"044222198138","featured_media":{"alt":null,"id":6896851976281,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158024.jpg?v=1599696148"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158024.jpg?v=1599696148","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158024_1.jpg?v=1599696150"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158024.jpg?v=1599696148","options":["Title"],"media":[{"alt":null,"id":6896851976281,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158024.jpg?v=1599696148"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158024.jpg?v=1599696148","width":1500},{"alt":null,"id":6896852041817,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158024_1.jpg?v=1599696150"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-158024_1.jpg?v=1599696150","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005019\u003cbr\u003e\u003cbr\u003eUPC: 044222198138\u003cbr\u003eThe Stoplight Pocket Chart is ideal for behavior, classroom, and center management as well as differentiating small group assignments! It measures approximately 19.75\" x 26\" and features: 6 nylon color pockets, 5 clear pockets, 30 write-on\/wipe away student sticks, flame retardant material and durable construction, sturdy grommets for easy hanging, and a teacher resource guide.\u003cbr\u003eSKU: ERSCD-158024"}
Stoplight Pocket Chart

Stoplight Pocket Chart

$38.35

MPN: 005019UPC: 044222198138The Stoplight Pocket Chart is ideal for behavior, classroom, and center management as well as differentiating small group assignments! It measures approximately 19.75" x 26" and features: 6 nylon color pockets, 5 clear pockets, 30 write-on/wipe away student sticks, flame retardant material and durable construction, st...


More Info
{"id":4715954438233,"title":"(12 Ea) C Line Retracting Id Card Reel","handle":"12-ea-c-line-retracting-id-card-reel-1","description":"MPN: 000757\u003cbr\u003e\u003cbr\u003eUPC: 194629053315\u003cbr\u003eSwiveling ID card reel allows for convenient scanning of ID badges and cards. Swivel clip design rotates 360° for easier attaching to belts, backpacks or bags. Snap-on ID strap attachment connects to any card or badge holder. Features automatic retractable 30-inch cord. Black reel with clear strap attachment. Pack of 12 badge holders.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eSwivel clip design rotates 360° for easier attaching to belts, backpacks or bagsSnap-on ID strap attachment connects to any card or badge holderFeatures automatic retractable 30-inch cordBlack reel with clear strap attachmentPack of 12\u003cbr\u003eSKU: ERSCLI89231-12","published_at":"2022-05-19T19:50:01-04:00","created_at":"2020-09-09T19:57:03-04:00","vendor":"C-line Products Inc","type":"Teacher Aids","tags":["10+ years","Accessories","Black","Metal","Plastic"],"price":5803,"price_min":5803,"price_max":5803,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156539093081,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCLI89231-12","requires_shipping":true,"taxable":true,"featured_image":{"id":14725254578265,"product_id":4715954438233,"position":1,"created_at":"2020-09-09T19:57:03-04:00","updated_at":"2020-09-09T19:57:03-04:00","alt":null,"width":1800,"height":1800,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCLI89231-12.jpg?v=1599695823","variant_ids":[32156539093081]},"available":true,"name":"(12 Ea) C Line Retracting Id Card Reel","public_title":null,"options":["Default Title"],"price":5803,"weight":172,"compare_at_price":null,"inventory_quantity":20,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629053315","featured_media":{"alt":null,"id":6896841130073,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1800,"width":1800,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCLI89231-12.jpg?v=1599695823"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCLI89231-12.jpg?v=1599695823"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCLI89231-12.jpg?v=1599695823","options":["Title"],"media":[{"alt":null,"id":6896841130073,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1800,"width":1800,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCLI89231-12.jpg?v=1599695823"},"aspect_ratio":1.0,"height":1800,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCLI89231-12.jpg?v=1599695823","width":1800}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 000757\u003cbr\u003e\u003cbr\u003eUPC: 194629053315\u003cbr\u003eSwiveling ID card reel allows for convenient scanning of ID badges and cards. Swivel clip design rotates 360° for easier attaching to belts, backpacks or bags. Snap-on ID strap attachment connects to any card or badge holder. Features automatic retractable 30-inch cord. Black reel with clear strap attachment. Pack of 12 badge holders.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eSwivel clip design rotates 360° for easier attaching to belts, backpacks or bagsSnap-on ID strap attachment connects to any card or badge holderFeatures automatic retractable 30-inch cordBlack reel with clear strap attachmentPack of 12\u003cbr\u003eSKU: ERSCLI89231-12"}
(12 Ea) C Line Retracting Id Card Reel

(12 Ea) C Line Retracting Id Card Reel

$58.03

MPN: 000757UPC: 194629053315Swiveling ID card reel allows for convenient scanning of ID badges and cards. Swivel clip design rotates 360° for easier attaching to belts, backpacks or bags. Snap-on ID strap attachment connects to any card or badge holder. Features automatic retractable 30-inch cord. Black reel with clear strap attachment. Pack of ...


More Info
{"id":4715954176089,"title":"Magnetic Confetti Classroom Subj","handle":"magnetic-confetti-classroom-subj","description":"MPN: 006273\u003cbr\u003e\u003cbr\u003eUPC: 703185190077\u003cbr\u003eOrganize your classroom or home with our magnetic column headers. These pre-printed timesavers feature Class Subjects for DIY headers on magnetic surfaces. Write names, goals, assignments, and more underneath each column header. Use blank frame to make your own title with liquid chalk markers for best results. Each pack includes 8 pieces that easily punch out from a die-cut sheet.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003ePre-labeled magnetic column header8 pieces per die-cut sheetUse to keep track of work, names, assignments, jobs, goals, birthdays, special dates, notes, and moreMulti-purpose, use on any magnetic surfaceWrite-on\/wipe-off surface\u003cbr\u003eSKU: ERSASH19007","published_at":"2025-04-10T19:22:48-04:00","created_at":"2020-09-09T19:56:40-04:00","vendor":"Ashley Productions","type":"Teacher Aids","tags":["5+ years","Foam","Magnet","Multi","Name Plates","Plastic"],"price":958,"price_min":958,"price_max":958,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156538830937,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSASH19007","requires_shipping":true,"taxable":true,"featured_image":{"id":14725252284505,"product_id":4715954176089,"position":1,"created_at":"2020-09-09T19:56:41-04:00","updated_at":"2020-09-09T19:56:41-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH19007.jpg?v=1599695801","variant_ids":[32156538830937]},"available":true,"name":"Magnetic Confetti Classroom Subj","public_title":null,"options":["Default Title"],"price":958,"weight":318,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"703185190077","featured_media":{"alt":null,"id":6896838836313,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH19007.jpg?v=1599695801"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH19007.jpg?v=1599695801"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH19007.jpg?v=1599695801","options":["Title"],"media":[{"alt":null,"id":6896838836313,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH19007.jpg?v=1599695801"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH19007.jpg?v=1599695801","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006273\u003cbr\u003e\u003cbr\u003eUPC: 703185190077\u003cbr\u003eOrganize your classroom or home with our magnetic column headers. These pre-printed timesavers feature Class Subjects for DIY headers on magnetic surfaces. Write names, goals, assignments, and more underneath each column header. Use blank frame to make your own title with liquid chalk markers for best results. Each pack includes 8 pieces that easily punch out from a die-cut sheet.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003ePre-labeled magnetic column header8 pieces per die-cut sheetUse to keep track of work, names, assignments, jobs, goals, birthdays, special dates, notes, and moreMulti-purpose, use on any magnetic surfaceWrite-on\/wipe-off surface\u003cbr\u003eSKU: ERSASH19007"}
Magnetic Confetti Classroom Subj

Magnetic Confetti Classroom Subj

$9.58

MPN: 006273UPC: 703185190077Organize your classroom or home with our magnetic column headers. These pre-printed timesavers feature Class Subjects for DIY headers on magnetic surfaces. Write names, goals, assignments, and more underneath each column header. Use blank frame to make your own title with liquid chalk markers for best results. Each pa...


More Info
{"id":4715954077785,"title":"Magnetic Confetti Days The Week","handle":"magnetic-confetti-days-the-week","description":"MPN: 006273\u003cbr\u003e\u003cbr\u003eUPC: 703185190060\u003cbr\u003eOrganize your classroom or home with our magnetic column headers. These pre-printed timesavers feature Days of the Week for DIY calendars on magnetic surfaces. Write names, goals, assignments, and more underneath each column header. Use blank frame to make your own title with liquid chalk markers for best results. Each pack includes 8 pieces that easily punch out from a die-cut sheet.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003ePre-labeled magnetic column header8 pieces per die-cut sheetUse to keep track of work, names, assignments, jobs, goals, birthdays, special dates, notes, and moreMulti-purpose, use on any magnetic surfaceWrite-on\/wipe-off surface\u003cbr\u003eSKU: ERSASH19006","published_at":"2025-04-10T19:51:27-04:00","created_at":"2020-09-09T19:56:34-04:00","vendor":"Ashley Productions","type":"Teacher Aids","tags":["5+ years","Foam","Magnet","Multi","Name Plates","Plastic"],"price":958,"price_min":958,"price_max":958,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156538765401,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSASH19006","requires_shipping":true,"taxable":true,"featured_image":{"id":14725251694681,"product_id":4715954077785,"position":1,"created_at":"2020-09-09T19:56:35-04:00","updated_at":"2020-09-09T19:56:35-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH19006.jpg?v=1599695795","variant_ids":[32156538765401]},"available":true,"name":"Magnetic Confetti Days The Week","public_title":null,"options":["Default Title"],"price":958,"weight":318,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"703185190060","featured_media":{"alt":null,"id":6896838246489,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH19006.jpg?v=1599695795"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH19006.jpg?v=1599695795"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH19006.jpg?v=1599695795","options":["Title"],"media":[{"alt":null,"id":6896838246489,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH19006.jpg?v=1599695795"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH19006.jpg?v=1599695795","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006273\u003cbr\u003e\u003cbr\u003eUPC: 703185190060\u003cbr\u003eOrganize your classroom or home with our magnetic column headers. These pre-printed timesavers feature Days of the Week for DIY calendars on magnetic surfaces. Write names, goals, assignments, and more underneath each column header. Use blank frame to make your own title with liquid chalk markers for best results. Each pack includes 8 pieces that easily punch out from a die-cut sheet.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003ePre-labeled magnetic column header8 pieces per die-cut sheetUse to keep track of work, names, assignments, jobs, goals, birthdays, special dates, notes, and moreMulti-purpose, use on any magnetic surfaceWrite-on\/wipe-off surface\u003cbr\u003eSKU: ERSASH19006"}
Magnetic Confetti Days The Week

Magnetic Confetti Days The Week

$9.58

MPN: 006273UPC: 703185190060Organize your classroom or home with our magnetic column headers. These pre-printed timesavers feature Days of the Week for DIY calendars on magnetic surfaces. Write names, goals, assignments, and more underneath each column header. Use blank frame to make your own title with liquid chalk markers for best results. Eac...


More Info
{"id":4715953684569,"title":"Deskplates Alphabet - Traditional","handle":"deskplates-alphabet-traditional","description":"MPN: 005019\u003cbr\u003e\u003cbr\u003eUPC: 044222200930\u003cbr\u003eThese convenient, nameplates are ideal for desk or cubby assignments, labels, work recognition, bookmarks and more! Available in a variety of prints, nameplates are great addition to any classroom! Each pack features 36 nameplates, measuring 9.5\" x 2.875\" each.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eIdeal for desk or cubby assignments, labels, work recognition, bookmarks and moreMeasures 9.5\" x 2.875\"Pack of 36\u003cbr\u003eSKU: ERSCD-122006","published_at":"2025-04-10T19:51:24-04:00","created_at":"2020-09-09T19:56:06-04:00","vendor":"Carson Dellosa Education","type":"Teacher Aids","tags":["4-6 years","Multi","Name Plates","Paper"],"price":752,"price_min":752,"price_max":752,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156538208345,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCD-122006","requires_shipping":true,"taxable":true,"featured_image":{"id":14725249171545,"product_id":4715953684569,"position":1,"created_at":"2020-09-09T19:56:06-04:00","updated_at":"2020-09-09T19:56:06-04:00","alt":null,"width":1600,"height":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-122006.jpg?v=1599695766","variant_ids":[32156538208345]},"available":true,"name":"Deskplates Alphabet - Traditional","public_title":null,"options":["Default Title"],"price":752,"weight":249,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"044222200930","featured_media":{"alt":null,"id":6896835723353,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-122006.jpg?v=1599695766"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-122006.jpg?v=1599695766"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-122006.jpg?v=1599695766","options":["Title"],"media":[{"alt":null,"id":6896835723353,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-122006.jpg?v=1599695766"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-122006.jpg?v=1599695766","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005019\u003cbr\u003e\u003cbr\u003eUPC: 044222200930\u003cbr\u003eThese convenient, nameplates are ideal for desk or cubby assignments, labels, work recognition, bookmarks and more! Available in a variety of prints, nameplates are great addition to any classroom! Each pack features 36 nameplates, measuring 9.5\" x 2.875\" each.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eIdeal for desk or cubby assignments, labels, work recognition, bookmarks and moreMeasures 9.5\" x 2.875\"Pack of 36\u003cbr\u003eSKU: ERSCD-122006"}
Deskplates Alphabet - Traditional

Deskplates Alphabet - Traditional

$7.52

MPN: 005019UPC: 044222200930These convenient, nameplates are ideal for desk or cubby assignments, labels, work recognition, bookmarks and more! Available in a variety of prints, nameplates are great addition to any classroom! Each pack features 36 nameplates, measuring 9.5" x 2.875" each.Key Features : Ideal for desk or cubby assignments, labels...


More Info
{"id":4715952472153,"title":"Magnetic Confetti Months Of The Yr","handle":"magnetic-confetti-months-of-the-yr","description":"MPN: 006273\u003cbr\u003e\u003cbr\u003eUPC: 703185190084\u003cbr\u003eOrganize your classroom or home with our magnetic column headers. Use these pre-printed timesavers for DIY calendars on magnetic surfaces. Write names, goals, assignments, and more underneath each column header. Each pack includes 12 pieces (1 per month) that easily punch out from a die-cut sheet.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003ePre-labeled magnetic column header12 pieces per die-cut sheetUse to keep track of work, names, assignments, jobs, goals, birthdays, special dates, notes, and moreMulti-purpose, use on any magnetic surfaceWrite-on\/wipe-off surface\u003cbr\u003eSKU: ERSASH19008","published_at":"2025-04-10T19:22:37-04:00","created_at":"2020-09-09T19:54:33-04:00","vendor":"Ashley Productions","type":"Teacher Aids","tags":["5+ years","Foam","Magnet","Multi","Name Plates","Plastic"],"price":958,"price_min":958,"price_max":958,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156536406105,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSASH19008","requires_shipping":true,"taxable":true,"featured_image":{"id":14725236785241,"product_id":4715952472153,"position":1,"created_at":"2020-09-09T19:54:33-04:00","updated_at":"2020-09-09T19:54:33-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH19008.jpg?v=1599695673","variant_ids":[32156536406105]},"available":true,"name":"Magnetic Confetti Months Of The Yr","public_title":null,"options":["Default Title"],"price":958,"weight":318,"compare_at_price":null,"inventory_quantity":49,"inventory_management":"shopify","inventory_policy":"deny","barcode":"703185190084","featured_media":{"alt":null,"id":6896823337049,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH19008.jpg?v=1599695673"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH19008.jpg?v=1599695673"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH19008.jpg?v=1599695673","options":["Title"],"media":[{"alt":null,"id":6896823337049,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH19008.jpg?v=1599695673"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH19008.jpg?v=1599695673","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006273\u003cbr\u003e\u003cbr\u003eUPC: 703185190084\u003cbr\u003eOrganize your classroom or home with our magnetic column headers. Use these pre-printed timesavers for DIY calendars on magnetic surfaces. Write names, goals, assignments, and more underneath each column header. Each pack includes 12 pieces (1 per month) that easily punch out from a die-cut sheet.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003ePre-labeled magnetic column header12 pieces per die-cut sheetUse to keep track of work, names, assignments, jobs, goals, birthdays, special dates, notes, and moreMulti-purpose, use on any magnetic surfaceWrite-on\/wipe-off surface\u003cbr\u003eSKU: ERSASH19008"}
Magnetic Confetti Months Of The Yr

Magnetic Confetti Months Of The Yr

$9.58

MPN: 006273UPC: 703185190084Organize your classroom or home with our magnetic column headers. Use these pre-printed timesavers for DIY calendars on magnetic surfaces. Write names, goals, assignments, and more underneath each column header. Each pack includes 12 pieces (1 per month) that easily punch out from a die-cut sheet.Key Features : Pre-la...


More Info
Megatimer
$94.53
{"id":4715950342233,"title":"Megatimer","handle":"megatimer","description":"MPN: 006344\u003cbr\u003e\u003cbr\u003eUPC: 644905001788\u003cbr\u003eHands down, the biggest, most powerful timer for teachers available. Mega means big. The MegaTimer measures in at a super-sized 9.5 by 6.5 inches. The jumbo LCD display with a brilliant blue backlight is so big and bright, you can read the display from the back seat of your classroom. Mega also means powerful. Powerful it is with all the standard timer features you would expect, plus many, many more. The MegaTimer's design is so unique and versatile, it is patent pending. Push the Student Selector button to randomly pick any student to share. Push the Team Selector button to randomly pick any team in the class to present. Use the Count Down timer to display how much time remains for students to complete their projects. Use the Stop Watch timer to challenge the class on how long it takes to clean up. Need dice, a spinner, or random numbers for math problems? The Random mode will generate random numbers for you. Set an Alarm to remind you and the class it's break time. Students seem a little sluggish? Press the Temperature button to check if the temperature is optimal for learning. And when you're not using the timer, display the Time and Date. Carry it around, hang it on the wall, or use the stand to place it on your desk. This is the timer you don't want to be without. Nowhere else will you find so many teaching tools packed into one digital timer. It's big. It's powerful. It's the MegaTimer! Requires 6 AA batteries, (not included).\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eStudents learn quickly that everyone has the potential to be selected for the timer.They are better able to manage their time while working and they learn to take turns.A Jumbo Timer Designed Just for Teachers!Large display so the whole class can see.Timer can be used in lots of group activities.\u003cbr\u003eSKU: ERSKA-JMT","published_at":"2024-03-20T05:16:40-04:00","created_at":"2020-09-09T19:51:51-04:00","vendor":"Kagan Publishing","type":"Teacher Aids","tags":["4+ years","Blue","Plastic","Timers"],"price":9453,"price_min":9453,"price_max":9453,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156530802777,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSKA-JMT","requires_shipping":true,"taxable":true,"featured_image":{"id":14725232164953,"product_id":4715950342233,"position":1,"created_at":"2020-09-09T19:51:51-04:00","updated_at":"2020-09-09T19:51:51-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSKA-JMT.jpg?v=1599695511","variant_ids":[32156530802777]},"available":true,"name":"Megatimer","public_title":null,"options":["Default Title"],"price":9453,"weight":635,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"644905001788","featured_media":{"alt":null,"id":6896818716761,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSKA-JMT.jpg?v=1599695511"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSKA-JMT.jpg?v=1599695511"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSKA-JMT.jpg?v=1599695511","options":["Title"],"media":[{"alt":null,"id":6896818716761,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSKA-JMT.jpg?v=1599695511"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSKA-JMT.jpg?v=1599695511","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006344\u003cbr\u003e\u003cbr\u003eUPC: 644905001788\u003cbr\u003eHands down, the biggest, most powerful timer for teachers available. Mega means big. The MegaTimer measures in at a super-sized 9.5 by 6.5 inches. The jumbo LCD display with a brilliant blue backlight is so big and bright, you can read the display from the back seat of your classroom. Mega also means powerful. Powerful it is with all the standard timer features you would expect, plus many, many more. The MegaTimer's design is so unique and versatile, it is patent pending. Push the Student Selector button to randomly pick any student to share. Push the Team Selector button to randomly pick any team in the class to present. Use the Count Down timer to display how much time remains for students to complete their projects. Use the Stop Watch timer to challenge the class on how long it takes to clean up. Need dice, a spinner, or random numbers for math problems? The Random mode will generate random numbers for you. Set an Alarm to remind you and the class it's break time. Students seem a little sluggish? Press the Temperature button to check if the temperature is optimal for learning. And when you're not using the timer, display the Time and Date. Carry it around, hang it on the wall, or use the stand to place it on your desk. This is the timer you don't want to be without. Nowhere else will you find so many teaching tools packed into one digital timer. It's big. It's powerful. It's the MegaTimer! Requires 6 AA batteries, (not included).\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eStudents learn quickly that everyone has the potential to be selected for the timer.They are better able to manage their time while working and they learn to take turns.A Jumbo Timer Designed Just for Teachers!Large display so the whole class can see.Timer can be used in lots of group activities.\u003cbr\u003eSKU: ERSKA-JMT"}
Megatimer

Megatimer

$94.53

MPN: 006344UPC: 644905001788Hands down, the biggest, most powerful timer for teachers available. Mega means big. The MegaTimer measures in at a super-sized 9.5 by 6.5 inches. The jumbo LCD display with a brilliant blue backlight is so big and bright, you can read the display from the back seat of your classroom. Mega also means powerful. Powerfu...


More Info
{"id":4715943952473,"title":"(6 Pk) Happy Birthday Name Tags","handle":"6-pk-happy-birthday-name-tags-1","description":"MPN: 005089\u003cbr\u003e\u003cbr\u003eUPC: 194629057184\u003cbr\u003eBright and welcoming labels are acid free and designed for no-smear writing with markers or pens. Perfect for name tags, labels stay put and won't leave residue on clothes! Also great for cubbies, lockers, storage boxes, envelopes, learning centers, and so much more. Self-adhesive. Labels measure 2.5\" x 3\". Each pack includes 36 labels. Sold as 6 packs for a total of 216 labels.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eBright and welcoming labels are acid-free and designed for no-smear writing with markers or pens.Ideal as labels for charts, folders, and storage boxes.Labels stay put and won't leave residue on clothes.Tags measure 2.5\" x 3\".36 self-adhesive tags per pack. Sold as 6 packs, 216 labels total.\u003cbr\u003eSKU: ERST-68031-6","published_at":"2025-01-16T21:02:33-05:00","created_at":"2020-09-09T19:43:00-04:00","vendor":"Trend Enterprises Inc.","type":"Teacher Aids","tags":["3+ years","Adhesive","Multi","Name Tags","Paper"],"price":4924,"price_min":4924,"price_max":4924,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156518416473,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERST-68031-6","requires_shipping":true,"taxable":true,"featured_image":{"id":14725217779801,"product_id":4715943952473,"position":1,"created_at":"2020-09-09T19:43:00-04:00","updated_at":"2020-09-09T19:43:00-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERST-68031-6.jpg?v=1599694980","variant_ids":[32156518416473]},"available":true,"name":"(6 Pk) Happy Birthday Name Tags","public_title":null,"options":["Default Title"],"price":4924,"weight":272,"compare_at_price":null,"inventory_quantity":36,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629057184","featured_media":{"alt":null,"id":6896804298841,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERST-68031-6.jpg?v=1599694980"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERST-68031-6.jpg?v=1599694980"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERST-68031-6.jpg?v=1599694980","options":["Title"],"media":[{"alt":null,"id":6896804298841,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERST-68031-6.jpg?v=1599694980"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERST-68031-6.jpg?v=1599694980","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005089\u003cbr\u003e\u003cbr\u003eUPC: 194629057184\u003cbr\u003eBright and welcoming labels are acid free and designed for no-smear writing with markers or pens. Perfect for name tags, labels stay put and won't leave residue on clothes! Also great for cubbies, lockers, storage boxes, envelopes, learning centers, and so much more. Self-adhesive. Labels measure 2.5\" x 3\". Each pack includes 36 labels. Sold as 6 packs for a total of 216 labels.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eBright and welcoming labels are acid-free and designed for no-smear writing with markers or pens.Ideal as labels for charts, folders, and storage boxes.Labels stay put and won't leave residue on clothes.Tags measure 2.5\" x 3\".36 self-adhesive tags per pack. Sold as 6 packs, 216 labels total.\u003cbr\u003eSKU: ERST-68031-6"}
(6 Pk) Happy Birthday Name Tags

(6 Pk) Happy Birthday Name Tags

$49.24

MPN: 005089UPC: 194629057184Bright and welcoming labels are acid free and designed for no-smear writing with markers or pens. Perfect for name tags, labels stay put and won't leave residue on clothes! Also great for cubbies, lockers, storage boxes, envelopes, learning centers, and so much more. Self-adhesive. Labels measure 2.5" x 3". Each pack ...


More Info
{"id":4715943460953,"title":"Name Plates Dog Man","handle":"name-plates-dog-man","description":"MPN: 005095\u003cbr\u003e\u003cbr\u003eUPC: 9781338626162\u003cbr\u003eBrighten up students’ desks with these delightful name plates featuring Dog Man, Li’l Petey (a.k.a. Cat Kid), Petey, Chief, and other favorite characters from Dav Pilkey’s blockbuster Dog Man series. Name plates measure 12\" x 4\". Each pack includes 36 name plates.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eBrighten up students' desks with these delightful name platesMeasures 12\" x 4\"Use as name plates on a desk or cubbie, or as labels in other areas of the classroomPack of 36\u003cbr\u003eSKU: ERSSC-862616","published_at":"2025-04-10T19:51:18-04:00","created_at":"2020-09-09T19:42:12-04:00","vendor":"Scholastic Teaching Resources","type":"Teacher Aids","tags":["7-11 years","Dog Man","Multi","Name Plates","Paper"],"price":889,"price_min":889,"price_max":889,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156517335129,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSSC-862616","requires_shipping":true,"taxable":true,"featured_image":{"id":14725216338009,"product_id":4715943460953,"position":1,"created_at":"2020-09-09T19:42:12-04:00","updated_at":"2020-09-09T19:42:12-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSSC-862616.jpg?v=1599694932","variant_ids":[32156517335129]},"available":true,"name":"Name Plates Dog Man","public_title":null,"options":["Default Title"],"price":889,"weight":245,"compare_at_price":null,"inventory_quantity":5,"inventory_management":"shopify","inventory_policy":"deny","barcode":"9781338626162","featured_media":{"alt":null,"id":6896802857049,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSSC-862616.jpg?v=1599694932"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSSC-862616.jpg?v=1599694932"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSSC-862616.jpg?v=1599694932","options":["Title"],"media":[{"alt":null,"id":6896802857049,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSSC-862616.jpg?v=1599694932"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSSC-862616.jpg?v=1599694932","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005095\u003cbr\u003e\u003cbr\u003eUPC: 9781338626162\u003cbr\u003eBrighten up students’ desks with these delightful name plates featuring Dog Man, Li’l Petey (a.k.a. Cat Kid), Petey, Chief, and other favorite characters from Dav Pilkey’s blockbuster Dog Man series. Name plates measure 12\" x 4\". Each pack includes 36 name plates.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eBrighten up students' desks with these delightful name platesMeasures 12\" x 4\"Use as name plates on a desk or cubbie, or as labels in other areas of the classroomPack of 36\u003cbr\u003eSKU: ERSSC-862616"}
Name Plates Dog Man

Name Plates Dog Man

$8.89

MPN: 005095UPC: 9781338626162Brighten up students’ desks with these delightful name plates featuring Dog Man, Li’l Petey (a.k.a. Cat Kid), Petey, Chief, and other favorite characters from Dav Pilkey’s blockbuster Dog Man series. Name plates measure 12" x 4". Each pack includes 36 name plates.Key Features : Brighten up students' desks with these ...


More Info
{"id":4715942674521,"title":"(6 Pk) Dots \u0026 Embossed Desk Name Plates Variety Pk I Love Metal","handle":"6-pk-dots-embossed-desk-name-plates-variety-pk-i-love-metal","description":"MPN: 005089\u003cbr\u003e\u003cbr\u003eUPC: 194629056637\u003cbr\u003eFour designs per pack makes it easy to group students, determine line order, and more. Invite students to select their favorites to label their desks and lockers. So many uses! Guidelines included for printing and writing practice. Measures 9 1\/2\" x 2 7\/8\". Each pack includes 32 name plates in 4 designs. Sold as 6 packs for a total of 216 name plates.\u003cbr\u003eSKU: ERST-69960-6","published_at":"2023-03-02T20:07:55-05:00","created_at":"2020-09-09T19:41:07-04:00","vendor":"Trend Enterprises Inc.","type":"Teacher Aids","tags":["4-12 years","Black","Copper","Gold","Name Plates","Paper","Silver","Teal"],"price":4924,"price_min":4924,"price_max":4924,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156516221017,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERST-69960-6","requires_shipping":true,"taxable":true,"featured_image":{"id":14725214404697,"product_id":4715942674521,"position":1,"created_at":"2020-09-09T19:41:07-04:00","updated_at":"2020-09-09T19:41:07-04:00","alt":null,"width":2000,"height":2000,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERST-69960-6.jpg?v=1599694867","variant_ids":[32156516221017]},"available":true,"name":"(6 Pk) Dots \u0026 Embossed Desk Name Plates Variety Pk I Love Metal","public_title":null,"options":["Default Title"],"price":4924,"weight":1034,"compare_at_price":null,"inventory_quantity":13,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629056637","featured_media":{"alt":null,"id":6896800923737,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2000,"width":2000,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERST-69960-6.jpg?v=1599694867"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERST-69960-6.jpg?v=1599694867"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERST-69960-6.jpg?v=1599694867","options":["Title"],"media":[{"alt":null,"id":6896800923737,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2000,"width":2000,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERST-69960-6.jpg?v=1599694867"},"aspect_ratio":1.0,"height":2000,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERST-69960-6.jpg?v=1599694867","width":2000}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005089\u003cbr\u003e\u003cbr\u003eUPC: 194629056637\u003cbr\u003eFour designs per pack makes it easy to group students, determine line order, and more. Invite students to select their favorites to label their desks and lockers. So many uses! Guidelines included for printing and writing practice. Measures 9 1\/2\" x 2 7\/8\". Each pack includes 32 name plates in 4 designs. Sold as 6 packs for a total of 216 name plates.\u003cbr\u003eSKU: ERST-69960-6"}
(6 Pk) Dots & Embossed Desk Name Plates Variety Pk I Love Metal

(6 Pk) Dots & Embossed Desk Name Plates Variety Pk I Love Metal

$49.24

MPN: 005089UPC: 194629056637Four designs per pack makes it easy to group students, determine line order, and more. Invite students to select their favorites to label their desks and lockers. So many uses! Guidelines included for printing and writing practice. Measures 9 1/2" x 2 7/8". Each pack includes 32 name plates in 4 designs. Sold as 6 pac...


More Info
{"id":4715939594329,"title":"(3 Pk) Nameplates Traditional 36 Per Pk 18x4 Cursive Upper Gr","handle":"3-pk-nameplates-traditional-36-per-pk-18x4-cursive-upper-gr-1","description":"MPN: 005019\u003cbr\u003e\u003cbr\u003eUPC: 194629080991\u003cbr\u003eThese Traditional Cursive nameplates include a name line; traditional cursive alphabet (upper- and lowercase) with stroke lines; 0-12 multiplication table; place value chart with words, fractions, and numerals; fraction and decimal equivalents; and standard and metric rulers. Each nameplate is 18\" x 4\" and each pack includes 36 nameplates. Sold as 3 packs for a total of 108 nameplates.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eCursive alphabet (upper- and lower-case) with stroke lines0-12 multiplication tablePlace value chart with words, fractions and numeralsFraction and decimal equivalents\u003cbr\u003eSKU: ERSCD-2073-3","published_at":"2023-08-09T08:22:21-04:00","created_at":"2020-09-09T19:36:54-04:00","vendor":"Carson Dellosa Education","type":"Teacher Aids","tags":["7-11 Years","Multi","Name Plates","Paper"],"price":3407,"price_min":3407,"price_max":3407,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156509306969,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCD-2073-3","requires_shipping":true,"taxable":true,"featured_image":{"id":14725206114393,"product_id":4715939594329,"position":1,"created_at":"2020-09-09T19:36:54-04:00","updated_at":"2020-09-09T19:36:54-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-2073-3.jpg?v=1599694614","variant_ids":[32156509306969]},"available":true,"name":"(3 Pk) Nameplates Traditional 36 Per Pk 18x4 Cursive Upper Gr","public_title":null,"options":["Default Title"],"price":3407,"weight":844,"compare_at_price":null,"inventory_quantity":8,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629080991","featured_media":{"alt":null,"id":6896792633433,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-2073-3.jpg?v=1599694614"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-2073-3.jpg?v=1599694614"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-2073-3.jpg?v=1599694614","options":["Title"],"media":[{"alt":null,"id":6896792633433,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-2073-3.jpg?v=1599694614"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCD-2073-3.jpg?v=1599694614","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005019\u003cbr\u003e\u003cbr\u003eUPC: 194629080991\u003cbr\u003eThese Traditional Cursive nameplates include a name line; traditional cursive alphabet (upper- and lowercase) with stroke lines; 0-12 multiplication table; place value chart with words, fractions, and numerals; fraction and decimal equivalents; and standard and metric rulers. Each nameplate is 18\" x 4\" and each pack includes 36 nameplates. Sold as 3 packs for a total of 108 nameplates.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eCursive alphabet (upper- and lower-case) with stroke lines0-12 multiplication tablePlace value chart with words, fractions and numeralsFraction and decimal equivalents\u003cbr\u003eSKU: ERSCD-2073-3"}
(3 Pk) Nameplates Traditional 36 Per Pk 18x4 Cursive Upper Gr

(3 Pk) Nameplates Traditional 36 Per Pk 18x4 Cursive Upper Gr

$34.07

MPN: 005019UPC: 194629080991These Traditional Cursive nameplates include a name line; traditional cursive alphabet (upper- and lowercase) with stroke lines; 0-12 multiplication table; place value chart with words, fractions, and numerals; fraction and decimal equivalents; and standard and metric rulers. Each nameplate is 18" x 4" and each pack i...


More Info
{"id":4715930452057,"title":"Stamp Set 3 Clock 5-min-60-min-hour Numerals","handle":"stamp-set-3-clock-5-min-60-min-hour-numerals","description":"MPN: 005646\u003cbr\u003e\u003cbr\u003eUPC: 734653002899\u003cbr\u003eThis set includes 3 wooden stamps with handles and detailed rubber imprints of analog clock faces. Each stamp displays a different version of an analog clock face: 12 five-minute intervals, 12 five-minute intervals with numerals 1-12 and 60 one-minute intervals. The clock faces don't include hands so kids are able to draw them on to practice telling time with an analog clock. The stamps assist in games, worksheets, flashcards and group activities. With large plastic handles, these stamps are easy for children to manipulate. The stamps are also labelled, making them easy for children to locate. For ages 3+. Size of each stamped image: 2\" dia. Size of stamps: 2.25\"L x 2.25\"W x 2.75\"H.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eThis stamp set includes 3 detailed analog clocks, each with a different face: 12 five-minute intervals, 12 five-minute intervals with numerals 1-12 and 60 one-minute intervals.The clock faces don't have hands, which enables children to draw their own! Perfect for games, worksheets, flashcards and group activities.Analog Clock Stamps feature chunky handles for easy grip. Children can easily manipulate these wooden stamps, which means precise images every time.Arts and crafts activities encourage creative expression, imagination and storytelling. Use these stamps for DIY projects like cards, invitations, albums and scrapbooks.\u003cbr\u003eSKU: ERSCE-099","published_at":"2025-04-10T19:24:20-04:00","created_at":"2020-09-09T19:23:33-04:00","vendor":"Learning Advantage","type":"Teacher Aids","tags":["3+ years","Multi","Rubber","Stamps \u0026 Stamp Pads","Wood"],"price":1780,"price_min":1780,"price_max":1780,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156493316185,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCE-099","requires_shipping":true,"taxable":true,"featured_image":{"id":14725188976729,"product_id":4715930452057,"position":1,"created_at":"2020-09-09T19:23:33-04:00","updated_at":"2020-09-09T19:23:33-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-099.jpg?v=1599693813","variant_ids":[32156493316185]},"available":true,"name":"Stamp Set 3 Clock 5-min-60-min-hour Numerals","public_title":null,"options":["Default Title"],"price":1780,"weight":172,"compare_at_price":null,"inventory_quantity":18,"inventory_management":"shopify","inventory_policy":"deny","barcode":"734653002899","featured_media":{"alt":null,"id":6896775495769,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-099.jpg?v=1599693813"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-099.jpg?v=1599693813","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-099_1.jpg?v=1599693815"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-099.jpg?v=1599693813","options":["Title"],"media":[{"alt":null,"id":6896775495769,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-099.jpg?v=1599693813"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-099.jpg?v=1599693813","width":2100},{"alt":null,"id":6896775528537,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-099_1.jpg?v=1599693815"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-099_1.jpg?v=1599693815","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005646\u003cbr\u003e\u003cbr\u003eUPC: 734653002899\u003cbr\u003eThis set includes 3 wooden stamps with handles and detailed rubber imprints of analog clock faces. Each stamp displays a different version of an analog clock face: 12 five-minute intervals, 12 five-minute intervals with numerals 1-12 and 60 one-minute intervals. The clock faces don't include hands so kids are able to draw them on to practice telling time with an analog clock. The stamps assist in games, worksheets, flashcards and group activities. With large plastic handles, these stamps are easy for children to manipulate. The stamps are also labelled, making them easy for children to locate. For ages 3+. Size of each stamped image: 2\" dia. Size of stamps: 2.25\"L x 2.25\"W x 2.75\"H.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eThis stamp set includes 3 detailed analog clocks, each with a different face: 12 five-minute intervals, 12 five-minute intervals with numerals 1-12 and 60 one-minute intervals.The clock faces don't have hands, which enables children to draw their own! Perfect for games, worksheets, flashcards and group activities.Analog Clock Stamps feature chunky handles for easy grip. Children can easily manipulate these wooden stamps, which means precise images every time.Arts and crafts activities encourage creative expression, imagination and storytelling. Use these stamps for DIY projects like cards, invitations, albums and scrapbooks.\u003cbr\u003eSKU: ERSCE-099"}
Stamp Set 3 Clock 5-min-60-min-hour Numerals

Stamp Set 3 Clock 5-min-60-min-hour Numerals

$17.80

MPN: 005646UPC: 734653002899This set includes 3 wooden stamps with handles and detailed rubber imprints of analog clock faces. Each stamp displays a different version of an analog clock face: 12 five-minute intervals, 12 five-minute intervals with numerals 1-12 and 60 one-minute intervals. The clock faces don't include hands so kids are able to ...


More Info
{"id":4715927404633,"title":"(2 St) Super Dino","handle":"2-st-super-dino","description":"MPN: 006588\u003cbr\u003e\u003cbr\u003eUPC: 194629105793\u003cbr\u003eA set of wood block stamps with encouraging messages that are great for teachers and students. Each set includes 3 stamps and 1 ink cube. Sold as 2 sets for a total of 6 stamps and 2 ink cubes.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eWood Block Stamp with Red RubberCrisp ImpressionHigh QualityIncludes two 1\" ink cubes\u003cbr\u003eSKU: ERSHOALP487-2","published_at":"2023-05-22T16:31:05-04:00","created_at":"2020-09-09T19:19:42-04:00","vendor":"Hero Arts","type":"Teacher Aids","tags":["3+ years","ink","Multi","red rubber","Stamps \u0026 Stamp Pads","wood"],"price":3833,"price_min":3833,"price_max":3833,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156489711705,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSHOALP487-2","requires_shipping":true,"taxable":true,"featured_image":{"id":14725183209561,"product_id":4715927404633,"position":1,"created_at":"2020-09-09T19:19:43-04:00","updated_at":"2020-09-09T19:19:43-04:00","alt":null,"width":1600,"height":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOALP487-2.jpg?v=1599693583","variant_ids":[32156489711705]},"available":true,"name":"(2 St) Super Dino","public_title":null,"options":["Default Title"],"price":3833,"weight":1996,"compare_at_price":null,"inventory_quantity":13,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629105793","featured_media":{"alt":null,"id":6896769728601,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOALP487-2.jpg?v=1599693583"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOALP487-2.jpg?v=1599693583"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOALP487-2.jpg?v=1599693583","options":["Title"],"media":[{"alt":null,"id":6896769728601,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOALP487-2.jpg?v=1599693583"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOALP487-2.jpg?v=1599693583","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006588\u003cbr\u003e\u003cbr\u003eUPC: 194629105793\u003cbr\u003eA set of wood block stamps with encouraging messages that are great for teachers and students. Each set includes 3 stamps and 1 ink cube. Sold as 2 sets for a total of 6 stamps and 2 ink cubes.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eWood Block Stamp with Red RubberCrisp ImpressionHigh QualityIncludes two 1\" ink cubes\u003cbr\u003eSKU: ERSHOALP487-2"}
(2 St) Super Dino

(2 St) Super Dino

$38.33

MPN: 006588UPC: 194629105793A set of wood block stamps with encouraging messages that are great for teachers and students. Each set includes 3 stamps and 1 ink cube. Sold as 2 sets for a total of 6 stamps and 2 ink cubes.Key Features : Wood Block Stamp with Red RubberCrisp ImpressionHigh QualityIncludes two 1" ink cubesSKU: ERSHOALP487-2


More Info
{"id":4715922423897,"title":"Name Badges Hello Red Charles Leonard Self Adhesive","handle":"name-badges-hello-red-charles-leonard-self-adhesive","description":"MPN: 006092\u003cbr\u003e\u003cbr\u003eUPC: 026487935352\u003cbr\u003eA quick and easy way to identify people, objects and a job well done. Self-adhesive labels, are ideal for dances, school outings and functions. 3-3\/8\" x 2-1\/4\"\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eA quick and easy way to identify people, objects and a job well done.Self-adhesive3-3\/8\" x 2-1\/4\"Great for labels, are ideal for dances, school outings and functions.\u003cbr\u003eSKU: ERSCHL93535","published_at":"2025-04-10T19:53:12-04:00","created_at":"2020-09-09T19:14:37-04:00","vendor":"Charles Leonard","type":"Teacher Aids","tags":["Adhesive","Name Tags","Paper","Red"],"price":419,"price_min":419,"price_max":419,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156482371673,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCHL93535","requires_shipping":true,"taxable":true,"featured_image":{"id":14725174558809,"product_id":4715922423897,"position":1,"created_at":"2020-09-09T19:14:37-04:00","updated_at":"2020-09-09T19:14:37-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL93535.jpg?v=1599693277","variant_ids":[32156482371673]},"available":true,"name":"Name Badges Hello Red Charles Leonard Self Adhesive","public_title":null,"options":["Default Title"],"price":419,"weight":113,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"026487935352","featured_media":{"alt":null,"id":6896761077849,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL93535.jpg?v=1599693277"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL93535.jpg?v=1599693277"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL93535.jpg?v=1599693277","options":["Title"],"media":[{"alt":null,"id":6896761077849,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL93535.jpg?v=1599693277"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL93535.jpg?v=1599693277","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006092\u003cbr\u003e\u003cbr\u003eUPC: 026487935352\u003cbr\u003eA quick and easy way to identify people, objects and a job well done. Self-adhesive labels, are ideal for dances, school outings and functions. 3-3\/8\" x 2-1\/4\"\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eA quick and easy way to identify people, objects and a job well done.Self-adhesive3-3\/8\" x 2-1\/4\"Great for labels, are ideal for dances, school outings and functions.\u003cbr\u003eSKU: ERSCHL93535"}
Name Badges Hello Red Charles Leonard Self Adhesive

Name Badges Hello Red Charles Leonard Self Adhesive

$4.19

MPN: 006092UPC: 026487935352A quick and easy way to identify people, objects and a job well done. Self-adhesive labels, are ideal for dances, school outings and functions. 3-3/8" x 2-1/4"Key Features : A quick and easy way to identify people, objects and a job well done.Self-adhesive3-3/8" x 2-1/4"Great for labels, are ideal for dances, school o...


More Info
{"id":4715921375321,"title":"(6 Pk) Progress Reports Pk Age 3 10 Per Pk","handle":"6-pk-progress-reports-pk-age-3-10-per-pk-1","description":"MPN: 005473\u003cbr\u003e\u003cbr\u003eUPC: 194629059300\u003cbr\u003ePreschool Progress Reports designed for 3 year olds provide a detailed listing of achievements in various curriculum areas. Colorful, easy-to-read Hayes reports help parents appreciate the progress their children have made. Areas include social and emotional skills, work habits, fine motor skills, gross motor skills, reading and math readiness, body parts, listening and speaking skills, self-reliance skills, music skills, and art skills. Reports are 2 sided, full-color tri-fold sheets. Closed report measures 5\" x 8\". Each pack includes 10 reports. Sold as 6 packs for a total of 60 reports.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eReports are 2 sided, full-color tri-fold sheetsClosed report measures 5\" x 8\"Colorful and easy to readFor three year olds\u003cbr\u003eSKU: ERSH-PRC1-6","published_at":"2023-01-25T15:08:31-05:00","created_at":"2020-09-09T19:13:20-04:00","vendor":"Flipside","type":"Teacher Aids","tags":["3-4 years","Multi","Paper","Progress Notices"],"price":4537,"price_min":4537,"price_max":4537,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156479684697,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSH-PRC1-6","requires_shipping":true,"taxable":true,"featured_image":{"id":14725172756569,"product_id":4715921375321,"position":1,"created_at":"2020-09-09T19:13:20-04:00","updated_at":"2020-09-09T19:13:20-04:00","alt":null,"width":1600,"height":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSH-PRC1-6.jpg?v=1599693200","variant_ids":[32156479684697]},"available":true,"name":"(6 Pk) Progress Reports Pk Age 3 10 Per Pk","public_title":null,"options":["Default Title"],"price":4537,"weight":1225,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629059300","featured_media":{"alt":null,"id":6896759275609,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSH-PRC1-6.jpg?v=1599693200"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSH-PRC1-6.jpg?v=1599693200"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSH-PRC1-6.jpg?v=1599693200","options":["Title"],"media":[{"alt":null,"id":6896759275609,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSH-PRC1-6.jpg?v=1599693200"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSH-PRC1-6.jpg?v=1599693200","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005473\u003cbr\u003e\u003cbr\u003eUPC: 194629059300\u003cbr\u003ePreschool Progress Reports designed for 3 year olds provide a detailed listing of achievements in various curriculum areas. Colorful, easy-to-read Hayes reports help parents appreciate the progress their children have made. Areas include social and emotional skills, work habits, fine motor skills, gross motor skills, reading and math readiness, body parts, listening and speaking skills, self-reliance skills, music skills, and art skills. Reports are 2 sided, full-color tri-fold sheets. Closed report measures 5\" x 8\". Each pack includes 10 reports. Sold as 6 packs for a total of 60 reports.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eReports are 2 sided, full-color tri-fold sheetsClosed report measures 5\" x 8\"Colorful and easy to readFor three year olds\u003cbr\u003eSKU: ERSH-PRC1-6"}
(6 Pk) Progress Reports Pk Age 3 10 Per Pk

(6 Pk) Progress Reports Pk Age 3 10 Per Pk

$45.37

MPN: 005473UPC: 194629059300Preschool Progress Reports designed for 3 year olds provide a detailed listing of achievements in various curriculum areas. Colorful, easy-to-read Hayes reports help parents appreciate the progress their children have made. Areas include social and emotional skills, work habits, fine motor skills, gross motor skills, ...


More Info
{"id":4715918688345,"title":"(6 Ea) Die Cut Magnets Polka Dot Nameplates","handle":"6-ea-die-cut-magnets-polka-dot-nameplates","description":"MPN: 006273\u003cbr\u003e\u003cbr\u003eUPC: 194629056064\u003cbr\u003eDie-cut easy punch out from 8.5\" x 11\" sheet. Use with dry erase markers or liquid chalk markers! Sticks to magnetic whiteboards, steel lockers, refrigerators, or any magnetic surface! Each pack includes 10 pieces. Sold as 6 packs for a total of 60 pieces.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eFeatures a write on wipe off surface for a variety of classroom usesGreat for games, nameplates, and lockersReusable magnets for fun learning\u003cbr\u003eSKU: ERSASH10118-6","published_at":"2021-12-08T00:50:07-05:00","created_at":"2020-09-09T19:10:11-04:00","vendor":"Ashley Productions","type":"Teacher Aids","tags":["5+ years","Assorted","Magnet","Name Plates","Plastic"],"price":5746,"price_min":5746,"price_max":5746,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156473557081,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSASH10118-6","requires_shipping":true,"taxable":true,"featured_image":{"id":14725163515993,"product_id":4715918688345,"position":1,"created_at":"2020-09-09T19:10:11-04:00","updated_at":"2020-09-09T19:10:11-04:00","alt":null,"width":1600,"height":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH10118-6.jpg?v=1599693011","variant_ids":[32156473557081]},"available":true,"name":"(6 Ea) Die Cut Magnets Polka Dot Nameplates","public_title":null,"options":["Default Title"],"price":5746,"weight":1905,"compare_at_price":null,"inventory_quantity":10,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629056064","featured_media":{"alt":null,"id":6896750002265,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH10118-6.jpg?v=1599693011"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH10118-6.jpg?v=1599693011","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH10118-6_1.jpg?v=1599693013"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH10118-6.jpg?v=1599693011","options":["Title"],"media":[{"alt":null,"id":6896750002265,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH10118-6.jpg?v=1599693011"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH10118-6.jpg?v=1599693011","width":1600},{"alt":null,"id":6896750035033,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH10118-6_1.jpg?v=1599693013"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH10118-6_1.jpg?v=1599693013","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006273\u003cbr\u003e\u003cbr\u003eUPC: 194629056064\u003cbr\u003eDie-cut easy punch out from 8.5\" x 11\" sheet. Use with dry erase markers or liquid chalk markers! Sticks to magnetic whiteboards, steel lockers, refrigerators, or any magnetic surface! Each pack includes 10 pieces. Sold as 6 packs for a total of 60 pieces.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eFeatures a write on wipe off surface for a variety of classroom usesGreat for games, nameplates, and lockersReusable magnets for fun learning\u003cbr\u003eSKU: ERSASH10118-6"}
(6 Ea) Die Cut Magnets Polka Dot Nameplates

(6 Ea) Die Cut Magnets Polka Dot Nameplates

$57.46

MPN: 006273UPC: 194629056064Die-cut easy punch out from 8.5" x 11" sheet. Use with dry erase markers or liquid chalk markers! Sticks to magnetic whiteboards, steel lockers, refrigerators, or any magnetic surface! Each pack includes 10 pieces. Sold as 6 packs for a total of 60 pieces.Key Features : Features a write on wipe off surface for a varie...


More Info
{"id":4715918229593,"title":"Eucalyptus Flat Name Plates","handle":"eucalyptus-flat-name-plates","description":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 088231986911\u003cbr\u003eChildren love to have a place especially for them. The soft greenery against the dark wood design is sure to be a favorite in any classroom. Label desks, learning centers, portfolios, materials, and more! Name plates measure 11-1\/2\" x 3-1\/2\". Each pack includes 36 nameplates.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eCan be used to label desks, learning centers, portfolios, materials, and moreName plates measure 11-1\/2\" x 3-1\/2\"36 nameplates per pack\u003cbr\u003eSKU: ERSTCR8691","published_at":"2025-04-10T19:53:10-04:00","created_at":"2020-09-09T19:09:28-04:00","vendor":"Teacher Created Resources","type":"Teacher Aids","tags":["5+ years","Cardstock","Eucalyptus Décor","Multi","Name Plates"],"price":821,"price_min":821,"price_max":821,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156473000025,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSTCR8691","requires_shipping":true,"taxable":true,"featured_image":{"id":14725162205273,"product_id":4715918229593,"position":1,"created_at":"2020-09-09T19:09:29-04:00","updated_at":"2020-09-09T19:09:29-04:00","alt":null,"width":1600,"height":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8691.jpg?v=1599692969","variant_ids":[32156473000025]},"available":true,"name":"Eucalyptus Flat Name Plates","public_title":null,"options":["Default Title"],"price":821,"weight":113,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"088231986911","featured_media":{"alt":null,"id":6896748691545,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8691.jpg?v=1599692969"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8691.jpg?v=1599692969"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8691.jpg?v=1599692969","options":["Title"],"media":[{"alt":null,"id":6896748691545,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8691.jpg?v=1599692969"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8691.jpg?v=1599692969","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 088231986911\u003cbr\u003eChildren love to have a place especially for them. The soft greenery against the dark wood design is sure to be a favorite in any classroom. Label desks, learning centers, portfolios, materials, and more! Name plates measure 11-1\/2\" x 3-1\/2\". Each pack includes 36 nameplates.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eCan be used to label desks, learning centers, portfolios, materials, and moreName plates measure 11-1\/2\" x 3-1\/2\"36 nameplates per pack\u003cbr\u003eSKU: ERSTCR8691"}
Eucalyptus Flat Name Plates

Eucalyptus Flat Name Plates

$8.21

MPN: 005003UPC: 088231986911Children love to have a place especially for them. The soft greenery against the dark wood design is sure to be a favorite in any classroom. Label desks, learning centers, portfolios, materials, and more! Name plates measure 11-1/2" x 3-1/2". Each pack includes 36 nameplates.Key Features : Can be used to label desks, ...


More Info
{"id":4715918098521,"title":"Eucalyptus Name Tags-labels Multipack","handle":"eucalyptus-name-tags-labels-multipack","description":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 088231986928\u003cbr\u003eThese nature and wood inspired designs are perfect for name tags, labels, award badges, parties, field trips, first days of school, parent visitation, student portfolios, cubbies, gift tags, and scrapbooking. Measures approximately 3-1\/2\" x 2-1\/2\". Each pack includes 36 pieces.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003ePerfect for name tags, labels, award badges, parties, field trips, and moreMeasures approximately 3-1\/2\" x 2-1\/2\"36 pieces per pack\u003cbr\u003eSKU: ERSTCR8692","published_at":"2025-04-10T19:53:08-04:00","created_at":"2020-09-09T19:09:19-04:00","vendor":"Teacher Created Resources","type":"Teacher Aids","tags":["5+ years","Adhesive","Eucalyptus Décor","Multi","Name Tags","Paper"],"price":684,"price_min":684,"price_max":684,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156472836185,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSTCR8692","requires_shipping":true,"taxable":true,"featured_image":{"id":14725161975897,"product_id":4715918098521,"position":1,"created_at":"2020-09-09T19:09:19-04:00","updated_at":"2020-09-09T19:09:19-04:00","alt":null,"width":1600,"height":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8692.jpg?v=1599692959","variant_ids":[32156472836185]},"available":true,"name":"Eucalyptus Name Tags-labels Multipack","public_title":null,"options":["Default Title"],"price":684,"weight":27,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"088231986928","featured_media":{"alt":null,"id":6896748494937,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8692.jpg?v=1599692959"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8692.jpg?v=1599692959"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8692.jpg?v=1599692959","options":["Title"],"media":[{"alt":null,"id":6896748494937,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8692.jpg?v=1599692959"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8692.jpg?v=1599692959","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 088231986928\u003cbr\u003eThese nature and wood inspired designs are perfect for name tags, labels, award badges, parties, field trips, first days of school, parent visitation, student portfolios, cubbies, gift tags, and scrapbooking. Measures approximately 3-1\/2\" x 2-1\/2\". Each pack includes 36 pieces.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003ePerfect for name tags, labels, award badges, parties, field trips, and moreMeasures approximately 3-1\/2\" x 2-1\/2\"36 pieces per pack\u003cbr\u003eSKU: ERSTCR8692"}
Eucalyptus Name Tags-labels Multipack

Eucalyptus Name Tags-labels Multipack

$6.84

MPN: 005003UPC: 088231986928These nature and wood inspired designs are perfect for name tags, labels, award badges, parties, field trips, first days of school, parent visitation, student portfolios, cubbies, gift tags, and scrapbooking. Measures approximately 3-1/2" x 2-1/2". Each pack includes 36 pieces.Key Features : Perfect for name tags, lab...


More Info
{"id":4715914362969,"title":"Name Badges Plain White Charles Leonard Self Adhesive","handle":"name-badges-plain-white-charles-leonard-self-adhesive","description":"MPN: 006092\u003cbr\u003e\u003cbr\u003eUPC: 026487935055\u003cbr\u003eA quick and easy way to identify people, objects and a job well done. Self-adhesive labels, are ideal for dances, school outings and functions. 3-3\/8\" x 2-1\/4\"\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eA quick and easy way to identify people, objects and a job well done.Self-adhesive3-3\/8\" x 2-1\/4\"labels, are ideal for dances, school outings and functions.\u003cbr\u003eSKU: ERSCHL93505","published_at":"2025-04-10T19:52:55-04:00","created_at":"2020-09-09T19:04:55-04:00","vendor":"Charles Leonard","type":"Teacher Aids","tags":["Adhesive","Name Tags","Paper","White"],"price":419,"price_min":419,"price_max":419,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156467724377,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCHL93505","requires_shipping":true,"taxable":true,"featured_image":{"id":14725155717209,"product_id":4715914362969,"position":1,"created_at":"2020-09-09T19:04:55-04:00","updated_at":"2020-09-09T19:04:55-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL93505.jpg?v=1599692695","variant_ids":[32156467724377]},"available":true,"name":"Name Badges Plain White Charles Leonard Self Adhesive","public_title":null,"options":["Default Title"],"price":419,"weight":113,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"026487935055","featured_media":{"alt":null,"id":6896742203481,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL93505.jpg?v=1599692695"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL93505.jpg?v=1599692695"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL93505.jpg?v=1599692695","options":["Title"],"media":[{"alt":null,"id":6896742203481,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL93505.jpg?v=1599692695"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL93505.jpg?v=1599692695","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006092\u003cbr\u003e\u003cbr\u003eUPC: 026487935055\u003cbr\u003eA quick and easy way to identify people, objects and a job well done. Self-adhesive labels, are ideal for dances, school outings and functions. 3-3\/8\" x 2-1\/4\"\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eA quick and easy way to identify people, objects and a job well done.Self-adhesive3-3\/8\" x 2-1\/4\"labels, are ideal for dances, school outings and functions.\u003cbr\u003eSKU: ERSCHL93505"}
Name Badges Plain White Charles Leonard Self Adhesive

Name Badges Plain White Charles Leonard Self Adhesive

$4.19

MPN: 006092UPC: 026487935055A quick and easy way to identify people, objects and a job well done. Self-adhesive labels, are ideal for dances, school outings and functions. 3-3/8" x 2-1/4"Key Features : A quick and easy way to identify people, objects and a job well done.Self-adhesive3-3/8" x 2-1/4"labels, are ideal for dances, school outings and...


More Info
{"id":4715913576537,"title":"Name Badges Hello Blue Charles Leonard Self Adhesive","handle":"name-badges-hello-blue-charles-leonard-self-adhesive","description":"MPN: 006092\u003cbr\u003e\u003cbr\u003eUPC: 026487935154\u003cbr\u003eA quick and easy way to identify people, objects and a job well done. Self-adhesive labels, are ideal for dances, school outings and functions. 3-3\/8\" x 2-1\/4\"\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eA quick and easy way to identify people, objects and a job well done.Self-adhesive3-3\/8\" x 2-1\/4\"Great for labels, are ideal for dances, school outings and functions.\u003cbr\u003eSKU: ERSCHL93515","published_at":"2025-04-10T19:52:50-04:00","created_at":"2020-09-09T19:04:15-04:00","vendor":"Charles Leonard","type":"Teacher Aids","tags":["Adhesive","Blue","Name Tags","Paper"],"price":419,"price_min":419,"price_max":419,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156466610265,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCHL93515","requires_shipping":true,"taxable":true,"featured_image":{"id":14725154373721,"product_id":4715913576537,"position":1,"created_at":"2020-09-09T19:04:15-04:00","updated_at":"2020-09-09T19:04:15-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL93515.jpg?v=1599692655","variant_ids":[32156466610265]},"available":true,"name":"Name Badges Hello Blue Charles Leonard Self Adhesive","public_title":null,"options":["Default Title"],"price":419,"weight":113,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"026487935154","featured_media":{"alt":null,"id":6896740859993,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL93515.jpg?v=1599692655"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL93515.jpg?v=1599692655"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL93515.jpg?v=1599692655","options":["Title"],"media":[{"alt":null,"id":6896740859993,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL93515.jpg?v=1599692655"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL93515.jpg?v=1599692655","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006092\u003cbr\u003e\u003cbr\u003eUPC: 026487935154\u003cbr\u003eA quick and easy way to identify people, objects and a job well done. Self-adhesive labels, are ideal for dances, school outings and functions. 3-3\/8\" x 2-1\/4\"\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eA quick and easy way to identify people, objects and a job well done.Self-adhesive3-3\/8\" x 2-1\/4\"Great for labels, are ideal for dances, school outings and functions.\u003cbr\u003eSKU: ERSCHL93515"}
Name Badges Hello Blue Charles Leonard Self Adhesive

Name Badges Hello Blue Charles Leonard Self Adhesive

$4.19

MPN: 006092UPC: 026487935154A quick and easy way to identify people, objects and a job well done. Self-adhesive labels, are ideal for dances, school outings and functions. 3-3/8" x 2-1/4"Key Features : A quick and easy way to identify people, objects and a job well done.Self-adhesive3-3/8" x 2-1/4"Great for labels, are ideal for dances, school o...


More Info
{"id":4715913183321,"title":"Lockable Drugs Cabinet","handle":"lockable-drugs-cabinet","description":"MPN: 006371\u003cbr\u003e\u003cbr\u003eUPC: 079252270509\u003cbr\u003eIdeal for home, office, and dorms, the Lockable Drug Cabinet keeps prescription drugs locked away from children and those for whom they are not prescribed. Heavy duty steel safe mounts easily to a wall or cabinet with included hardware in multiple positions! Durable, white powder coat finish easy to clean and doesn't draw extra attention to drugs stored inside. Safe includes 2 keys for lock, screws and anchors for mounting and a Red Cross applique. Not intended to act as an absolute fail-safe to entry. Dimensions: 11-1\/4\" x 4-3\/4\" x 4-1\/4\".\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eHeavy duty steel safe mounts easily to a wall or cabinet with included hardware in multiple positionsIdeal for home, office, and dormsDurable, white powder coat finishEasy to clean and doesn't draw extra attention to drugs stored inside\u003cbr\u003eSKU: ERSMAP27050","published_at":"2023-01-25T22:17:20-05:00","created_at":"2020-09-09T19:03:42-04:00","vendor":"Maped Helix Usa","type":"Teacher Aids","tags":["12+ years","First Aid\/safety","Steel","White"],"price":5177,"price_min":5177,"price_max":5177,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156466249817,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSMAP27050","requires_shipping":true,"taxable":true,"featured_image":{"id":14725152866393,"product_id":4715913183321,"position":1,"created_at":"2020-09-09T19:03:42-04:00","updated_at":"2020-09-09T19:03:42-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSMAP27050.jpg?v=1599692622","variant_ids":[32156466249817]},"available":true,"name":"Lockable Drugs Cabinet","public_title":null,"options":["Default Title"],"price":5177,"weight":866,"compare_at_price":null,"inventory_quantity":9,"inventory_management":"shopify","inventory_policy":"deny","barcode":"079252270509","featured_media":{"alt":null,"id":6896739352665,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSMAP27050.jpg?v=1599692622"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSMAP27050.jpg?v=1599692622"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSMAP27050.jpg?v=1599692622","options":["Title"],"media":[{"alt":null,"id":6896739352665,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSMAP27050.jpg?v=1599692622"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSMAP27050.jpg?v=1599692622","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006371\u003cbr\u003e\u003cbr\u003eUPC: 079252270509\u003cbr\u003eIdeal for home, office, and dorms, the Lockable Drug Cabinet keeps prescription drugs locked away from children and those for whom they are not prescribed. Heavy duty steel safe mounts easily to a wall or cabinet with included hardware in multiple positions! Durable, white powder coat finish easy to clean and doesn't draw extra attention to drugs stored inside. Safe includes 2 keys for lock, screws and anchors for mounting and a Red Cross applique. Not intended to act as an absolute fail-safe to entry. Dimensions: 11-1\/4\" x 4-3\/4\" x 4-1\/4\".\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eHeavy duty steel safe mounts easily to a wall or cabinet with included hardware in multiple positionsIdeal for home, office, and dormsDurable, white powder coat finishEasy to clean and doesn't draw extra attention to drugs stored inside\u003cbr\u003eSKU: ERSMAP27050"}
Lockable Drugs Cabinet

Lockable Drugs Cabinet

$51.77

MPN: 006371UPC: 079252270509Ideal for home, office, and dorms, the Lockable Drug Cabinet keeps prescription drugs locked away from children and those for whom they are not prescribed. Heavy duty steel safe mounts easily to a wall or cabinet with included hardware in multiple positions! Durable, white powder coat finish easy to clean and doesn't ...


More Info
{"id":4715912855641,"title":"Name Badges Hello Green Charles Leonard Self Adhesive","handle":"name-badges-hello-green-charles-leonard-self-adhesive","description":"MPN: 006092\u003cbr\u003e\u003cbr\u003eUPC: 026487935253\u003cbr\u003eA quick and easy way to identify people, objects and a job well done. Self-adhesive labels, are ideal for dances, school outings and functions. 3-3\/8\" x 2-1\/4\"\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eA quick and easy way to identify people, objects and a job well done.Self-adhesive3-3\/8\" x 2-1\/4\"Great for labels, are ideal for dances, school outings and functions.\u003cbr\u003eSKU: ERSCHL93525","published_at":"2025-04-10T19:52:51-04:00","created_at":"2020-09-09T19:03:11-04:00","vendor":"Charles Leonard","type":"Teacher Aids","tags":["Adhesive","Green","Name Tags","Paper"],"price":419,"price_min":419,"price_max":419,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156465889369,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCHL93525","requires_shipping":true,"taxable":true,"featured_image":{"id":14725150638169,"product_id":4715912855641,"position":1,"created_at":"2020-09-09T19:03:11-04:00","updated_at":"2020-09-09T19:03:11-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL93525.jpg?v=1599692591","variant_ids":[32156465889369]},"available":true,"name":"Name Badges Hello Green Charles Leonard Self Adhesive","public_title":null,"options":["Default Title"],"price":419,"weight":113,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"026487935253","featured_media":{"alt":null,"id":6896737124441,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL93525.jpg?v=1599692591"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL93525.jpg?v=1599692591"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL93525.jpg?v=1599692591","options":["Title"],"media":[{"alt":null,"id":6896737124441,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL93525.jpg?v=1599692591"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL93525.jpg?v=1599692591","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006092\u003cbr\u003e\u003cbr\u003eUPC: 026487935253\u003cbr\u003eA quick and easy way to identify people, objects and a job well done. Self-adhesive labels, are ideal for dances, school outings and functions. 3-3\/8\" x 2-1\/4\"\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eA quick and easy way to identify people, objects and a job well done.Self-adhesive3-3\/8\" x 2-1\/4\"Great for labels, are ideal for dances, school outings and functions.\u003cbr\u003eSKU: ERSCHL93525"}
Name Badges Hello Green Charles Leonard Self Adhesive

Name Badges Hello Green Charles Leonard Self Adhesive

$4.19

MPN: 006092UPC: 026487935253A quick and easy way to identify people, objects and a job well done. Self-adhesive labels, are ideal for dances, school outings and functions. 3-3/8" x 2-1/4"Key Features : A quick and easy way to identify people, objects and a job well done.Self-adhesive3-3/8" x 2-1/4"Great for labels, are ideal for dances, school o...


More Info
{"id":4715908628569,"title":"Magnetic Storage Pockets Set Of 4","handle":"magnetic-storage-pockets-set-of-4","description":"MPN: 005083\u003cbr\u003e\u003cbr\u003eUPC: 765023864472\u003cbr\u003eNow you can store your whiteboard magnets within easy reach! Hang these sturdy magnetic pockets around the room for organization. Each pocket holds about 0.75 lb. Set of 4 in 4 colors (green, blue, purple, red). Pocket measures 9.5L\" x 5.5H\".\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eClear window in each pocket clearly shows what's insideKeeps your classroom tidy and organizedGreat for whiteboard accessories like markers, erasers and other magnets\u003cbr\u003eSKU: ERSLER6447","published_at":"2024-09-25T05:29:32-04:00","created_at":"2020-09-09T18:58:17-04:00","vendor":"Learning Resources","type":"Teacher Aids","tags":["3+ years","Multi","Nylon","Storage"],"price":3424,"price_min":3424,"price_max":3424,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156460318809,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSLER6447","requires_shipping":true,"taxable":true,"featured_image":{"id":14725143855193,"product_id":4715908628569,"position":1,"created_at":"2020-09-09T18:58:18-04:00","updated_at":"2020-09-09T18:58:18-04:00","alt":null,"width":1800,"height":1800,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER6447.jpg?v=1599692298","variant_ids":[32156460318809]},"available":true,"name":"Magnetic Storage Pockets Set Of 4","public_title":null,"options":["Default Title"],"price":3424,"weight":113,"compare_at_price":null,"inventory_quantity":7,"inventory_management":"shopify","inventory_policy":"deny","barcode":"765023864472","featured_media":{"alt":null,"id":6896730341465,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1800,"width":1800,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER6447.jpg?v=1599692298"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER6447.jpg?v=1599692298","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER6447_2.jpg?v=1599692300","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER6447_1.jpg?v=1599692302"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER6447.jpg?v=1599692298","options":["Title"],"media":[{"alt":null,"id":6896730341465,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1800,"width":1800,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER6447.jpg?v=1599692298"},"aspect_ratio":1.0,"height":1800,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER6447.jpg?v=1599692298","width":1800},{"alt":null,"id":6896730374233,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1800,"width":1800,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER6447_2.jpg?v=1599692300"},"aspect_ratio":1.0,"height":1800,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER6447_2.jpg?v=1599692300","width":1800},{"alt":null,"id":6896730407001,"position":3,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER6447_1.jpg?v=1599692302"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER6447_1.jpg?v=1599692302","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005083\u003cbr\u003e\u003cbr\u003eUPC: 765023864472\u003cbr\u003eNow you can store your whiteboard magnets within easy reach! Hang these sturdy magnetic pockets around the room for organization. Each pocket holds about 0.75 lb. Set of 4 in 4 colors (green, blue, purple, red). Pocket measures 9.5L\" x 5.5H\".\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eClear window in each pocket clearly shows what's insideKeeps your classroom tidy and organizedGreat for whiteboard accessories like markers, erasers and other magnets\u003cbr\u003eSKU: ERSLER6447"}
Magnetic Storage Pockets Set Of 4

Magnetic Storage Pockets Set Of 4

$34.24

MPN: 005083UPC: 765023864472Now you can store your whiteboard magnets within easy reach! Hang these sturdy magnetic pockets around the room for organization. Each pocket holds about 0.75 lb. Set of 4 in 4 colors (green, blue, purple, red). Pocket measures 9.5L" x 5.5H".Key Features : Clear window in each pocket clearly shows what's insideKeeps y...


More Info
{"id":4715906334809,"title":"(6 Pk) Preschool Progress Reports 10 Per Pk For 1 Year Olds","handle":"6-pk-preschool-progress-reports-10-per-pk-for-1-year-olds","description":"MPN: 005473\u003cbr\u003e\u003cbr\u003eUPC: 194629059294\u003cbr\u003ePreschool Progress Reports designed for 1 year olds provide a detailed listing of achievements in various curriculum areas.\n\nColorful, easy-to-read Hayes reports help parents appreciate the progress their children have made. Areas include social and emotional skills, gross motor skills, fine motor skills, and language skills. Evaluation Reports are 2 sided, full-color tri-fold sheets. Closed reports measure 5\" x 8\". Each pack includes 10 reports. Sold as 6 packs for a total of 60 reports.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eThese progress reports provide a detailed listing of achievements for the school year in various curriculum areas.Help parents appreciate the progress their children have made.Stay Up To DateFor Age 1.\u003cbr\u003eSKU: ERSH-PRC09-6","published_at":"2024-05-14T09:45:40-04:00","created_at":"2020-09-09T18:55:18-04:00","vendor":"Flipside","type":"Teacher Aids","tags":["3+ years","Multi","Paper","Progress Notices"],"price":4537,"price_min":4537,"price_max":4537,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156456943705,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSH-PRC09-6","requires_shipping":true,"taxable":true,"featured_image":{"id":14725139791961,"product_id":4715906334809,"position":1,"created_at":"2020-09-09T18:55:18-04:00","updated_at":"2020-09-09T18:55:18-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSH-PRC09-6.jpg?v=1599692118","variant_ids":[32156456943705]},"available":true,"name":"(6 Pk) Preschool Progress Reports 10 Per Pk For 1 Year Olds","public_title":null,"options":["Default Title"],"price":4537,"weight":680,"compare_at_price":null,"inventory_quantity":10,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629059294","featured_media":{"alt":null,"id":6896726278233,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSH-PRC09-6.jpg?v=1599692118"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSH-PRC09-6.jpg?v=1599692118"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSH-PRC09-6.jpg?v=1599692118","options":["Title"],"media":[{"alt":null,"id":6896726278233,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSH-PRC09-6.jpg?v=1599692118"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSH-PRC09-6.jpg?v=1599692118","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005473\u003cbr\u003e\u003cbr\u003eUPC: 194629059294\u003cbr\u003ePreschool Progress Reports designed for 1 year olds provide a detailed listing of achievements in various curriculum areas.\n\nColorful, easy-to-read Hayes reports help parents appreciate the progress their children have made. Areas include social and emotional skills, gross motor skills, fine motor skills, and language skills. Evaluation Reports are 2 sided, full-color tri-fold sheets. Closed reports measure 5\" x 8\". Each pack includes 10 reports. Sold as 6 packs for a total of 60 reports.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eThese progress reports provide a detailed listing of achievements for the school year in various curriculum areas.Help parents appreciate the progress their children have made.Stay Up To DateFor Age 1.\u003cbr\u003eSKU: ERSH-PRC09-6"}
(6 Pk) Preschool Progress Reports 10 Per Pk For 1 Year Olds

(6 Pk) Preschool Progress Reports 10 Per Pk For 1 Year Olds

$45.37

MPN: 005473UPC: 194629059294Preschool Progress Reports designed for 1 year olds provide a detailed listing of achievements in various curriculum areas. Colorful, easy-to-read Hayes reports help parents appreciate the progress their children have made. Areas include social and emotional skills, gross motor skills, fine motor skills, and language...


More Info
{"id":4715905515609,"title":"(24 Ea) Sentence Reading Guide Strip Gray","handle":"24-ea-sentence-reading-guide-strip-gray","description":"MPN: 006273\u003cbr\u003e\u003cbr\u003eUPC: 194629101108\u003cbr\u003eReading Guide products are designed to aid students and adults with the following difficulties: skipping words, skipping lines, reversing letters, transposing letters, losing your place, re-reading lines, squinting, concentration, comprehension, red\/watery eyes and reading fatigue. Easily track print through transparent tinted window. Each strip measures 1.25\" x 7.25\". Pack of 24 reading guides.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eReading guide filters are ideal for overcoming reading difficultiesColored overlays are beneficial to readers of all agesMany reading problems can be aided by color filtersUsing frames and colored plastic allows the reader to easily see the contrast of words on the page therefore increasing the ability to concentrate without distraction\u003cbr\u003eSKU: ERSASH10869-24","published_at":"2020-10-08T20:30:34-04:00","created_at":"2020-09-09T18:54:03-04:00","vendor":"Ashley Productions","type":"Teacher Aids","tags":["5+ years","Accessories","Acetate","Gray"],"price":3255,"price_min":3255,"price_max":3255,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156455927897,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSASH10869-24","requires_shipping":true,"taxable":true,"featured_image":{"id":14725137924185,"product_id":4715905515609,"position":1,"created_at":"2020-09-09T18:54:03-04:00","updated_at":"2020-09-09T18:54:03-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH10869-24.jpg?v=1599692043","variant_ids":[32156455927897]},"available":true,"name":"(24 Ea) Sentence Reading Guide Strip Gray","public_title":null,"options":["Default Title"],"price":3255,"weight":1089,"compare_at_price":null,"inventory_quantity":8,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629101108","featured_media":{"alt":null,"id":6896724410457,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH10869-24.jpg?v=1599692043"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH10869-24.jpg?v=1599692043"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH10869-24.jpg?v=1599692043","options":["Title"],"media":[{"alt":null,"id":6896724410457,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH10869-24.jpg?v=1599692043"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH10869-24.jpg?v=1599692043","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006273\u003cbr\u003e\u003cbr\u003eUPC: 194629101108\u003cbr\u003eReading Guide products are designed to aid students and adults with the following difficulties: skipping words, skipping lines, reversing letters, transposing letters, losing your place, re-reading lines, squinting, concentration, comprehension, red\/watery eyes and reading fatigue. Easily track print through transparent tinted window. Each strip measures 1.25\" x 7.25\". Pack of 24 reading guides.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eReading guide filters are ideal for overcoming reading difficultiesColored overlays are beneficial to readers of all agesMany reading problems can be aided by color filtersUsing frames and colored plastic allows the reader to easily see the contrast of words on the page therefore increasing the ability to concentrate without distraction\u003cbr\u003eSKU: ERSASH10869-24"}
(24 Ea) Sentence Reading Guide Strip Gray

(24 Ea) Sentence Reading Guide Strip Gray

$32.55

MPN: 006273UPC: 194629101108Reading Guide products are designed to aid students and adults with the following difficulties: skipping words, skipping lines, reversing letters, transposing letters, losing your place, re-reading lines, squinting, concentration, comprehension, red/watery eyes and reading fatigue. Easily track print through transpare...


More Info
{"id":4715904041049,"title":"(6 Pk) Progress Reports Pk Age 2 10 Per Pk","handle":"6-pk-progress-reports-pk-age-2-10-per-pk","description":"MPN: 005473\u003cbr\u003e\u003cbr\u003eUPC: 194629059287\u003cbr\u003ePreschool Progress Reports designed for 2 year olds provide a detailed listing of achievements in various curriculum areas. Colorful, easy-to-read Hayes reports help parents appreciate the progress their children have made. Areas include social and emotional skills, work habits, fine motor skills, gross motor skills, reading and math readiness, body parts, listening and speaking skills, self-reliance skills, music skills, and art skills. Reports are 2 sided, full-color tri-fold sheets. Closed report measures 5\" x 8\". Each pack includes 10 progress reports. Sold as 6 packs for a total of 60 reports.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eReports are 2 sided, full-color tri-fold sheetsClosed report measures 5\" x 8\"Colorful and easy to readFor two year olds\u003cbr\u003eSKU: ERSH-PRC0-6","published_at":"2024-01-08T05:02:46-05:00","created_at":"2020-09-09T18:52:19-04:00","vendor":"Flipside","type":"Teacher Aids","tags":["2-3 years","Multi","Paper","Progress Notices"],"price":4537,"price_min":4537,"price_max":4537,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156453863513,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSH-PRC0-6","requires_shipping":true,"taxable":true,"featured_image":{"id":14725135663193,"product_id":4715904041049,"position":1,"created_at":"2020-09-09T18:52:19-04:00","updated_at":"2020-09-09T18:52:19-04:00","alt":null,"width":1600,"height":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSH-PRC0-6.jpg?v=1599691939","variant_ids":[32156453863513]},"available":true,"name":"(6 Pk) Progress Reports Pk Age 2 10 Per Pk","public_title":null,"options":["Default Title"],"price":4537,"weight":544,"compare_at_price":null,"inventory_quantity":16,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629059287","featured_media":{"alt":null,"id":6896722149465,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSH-PRC0-6.jpg?v=1599691939"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSH-PRC0-6.jpg?v=1599691939"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSH-PRC0-6.jpg?v=1599691939","options":["Title"],"media":[{"alt":null,"id":6896722149465,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSH-PRC0-6.jpg?v=1599691939"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSH-PRC0-6.jpg?v=1599691939","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005473\u003cbr\u003e\u003cbr\u003eUPC: 194629059287\u003cbr\u003ePreschool Progress Reports designed for 2 year olds provide a detailed listing of achievements in various curriculum areas. Colorful, easy-to-read Hayes reports help parents appreciate the progress their children have made. Areas include social and emotional skills, work habits, fine motor skills, gross motor skills, reading and math readiness, body parts, listening and speaking skills, self-reliance skills, music skills, and art skills. Reports are 2 sided, full-color tri-fold sheets. Closed report measures 5\" x 8\". Each pack includes 10 progress reports. Sold as 6 packs for a total of 60 reports.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eReports are 2 sided, full-color tri-fold sheetsClosed report measures 5\" x 8\"Colorful and easy to readFor two year olds\u003cbr\u003eSKU: ERSH-PRC0-6"}
(6 Pk) Progress Reports Pk Age 2 10 Per Pk

(6 Pk) Progress Reports Pk Age 2 10 Per Pk

$45.37

MPN: 005473UPC: 194629059287Preschool Progress Reports designed for 2 year olds provide a detailed listing of achievements in various curriculum areas. Colorful, easy-to-read Hayes reports help parents appreciate the progress their children have made. Areas include social and emotional skills, work habits, fine motor skills, gross motor skills, ...


More Info
{"id":4715900305497,"title":"Officemate Vertical Upright Sign Holder","handle":"officemate-vertical-upright-sign-holder","description":"MPN: 006492\u003cbr\u003e\u003cbr\u003eUPC: 042491230054\u003cbr\u003eDisplays your signs upright on desk or flat surface. For signs 8 1\/2\" W x 11\" H. Self-Standing. Literature slides in from bottom. Made from clear plastic.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eDisplays your signs upright on desk or flat surfaceFor signs 8.5\"W x 11\"HSelf-standingLiterature slides in from bottomMade from clear plastic\u003cbr\u003eSKU: ERSOIC23005","published_at":"2025-02-28T21:23:58-05:00","created_at":"2020-09-09T18:47:26-04:00","vendor":"Officemate Llc","type":"Teacher Aids","tags":["5+ years","Clear","Organizer Pockets","Plastic"],"price":2169,"price_min":2169,"price_max":2169,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156448620633,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSOIC23005","requires_shipping":true,"taxable":true,"featured_image":{"id":14725130125401,"product_id":4715900305497,"position":1,"created_at":"2020-09-09T18:47:26-04:00","updated_at":"2020-09-09T18:47:26-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSOIC23005.jpg?v=1599691646","variant_ids":[32156448620633]},"available":true,"name":"Officemate Vertical Upright Sign Holder","public_title":null,"options":["Default Title"],"price":2169,"weight":340,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"042491230054","featured_media":{"alt":null,"id":6896716611673,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSOIC23005.jpg?v=1599691646"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSOIC23005.jpg?v=1599691646"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSOIC23005.jpg?v=1599691646","options":["Title"],"media":[{"alt":null,"id":6896716611673,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSOIC23005.jpg?v=1599691646"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSOIC23005.jpg?v=1599691646","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006492\u003cbr\u003e\u003cbr\u003eUPC: 042491230054\u003cbr\u003eDisplays your signs upright on desk or flat surface. For signs 8 1\/2\" W x 11\" H. Self-Standing. Literature slides in from bottom. Made from clear plastic.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eDisplays your signs upright on desk or flat surfaceFor signs 8.5\"W x 11\"HSelf-standingLiterature slides in from bottomMade from clear plastic\u003cbr\u003eSKU: ERSOIC23005"}
Officemate Vertical Upright Sign Holder

Officemate Vertical Upright Sign Holder

$21.69

MPN: 006492UPC: 042491230054Displays your signs upright on desk or flat surface. For signs 8 1/2" W x 11" H. Self-Standing. Literature slides in from bottom. Made from clear plastic.Key Features : Displays your signs upright on desk or flat surfaceFor signs 8.5"W x 11"HSelf-standingLiterature slides in from bottomMade from clear plasticSKU: ERSO...


More Info
{"id":4715900272729,"title":"Officemate Horizontal Upright Sign Holder","handle":"officemate-horizontal-upright-sign-holder","description":"MPN: 006492\u003cbr\u003e\u003cbr\u003eUPC: 042491230061\u003cbr\u003eDisplays your signs upright on desk or flat surface. For signs 11\" W x 8 1\/2\" H. Self-Standing. Literature slides in from bottom. Made from clear plastic.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eDisplays your signs upright on desk or flat surface.For signs 11\" W x 8.5\" H.Self-Standing.Literature slides in from bottom.Made from clear plastic.\u003cbr\u003eSKU: ERSOIC23006","published_at":"2025-04-17T07:39:25-04:00","created_at":"2020-09-09T18:47:23-04:00","vendor":"Officemate Llc","type":"Teacher Aids","tags":["3+ years","Clear","Organizer Pockets","Plastic"],"price":2169,"price_min":2169,"price_max":2169,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156448587865,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSOIC23006","requires_shipping":true,"taxable":true,"featured_image":{"id":14725130059865,"product_id":4715900272729,"position":1,"created_at":"2020-09-09T18:47:23-04:00","updated_at":"2020-09-09T18:47:23-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSOIC23006.jpg?v=1599691643","variant_ids":[32156448587865]},"available":true,"name":"Officemate Horizontal Upright Sign Holder","public_title":null,"options":["Default Title"],"price":2169,"weight":340,"compare_at_price":null,"inventory_quantity":24,"inventory_management":"shopify","inventory_policy":"deny","barcode":"042491230061","featured_media":{"alt":null,"id":6896716578905,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSOIC23006.jpg?v=1599691643"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSOIC23006.jpg?v=1599691643"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSOIC23006.jpg?v=1599691643","options":["Title"],"media":[{"alt":null,"id":6896716578905,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSOIC23006.jpg?v=1599691643"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSOIC23006.jpg?v=1599691643","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006492\u003cbr\u003e\u003cbr\u003eUPC: 042491230061\u003cbr\u003eDisplays your signs upright on desk or flat surface. For signs 11\" W x 8 1\/2\" H. Self-Standing. Literature slides in from bottom. Made from clear plastic.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eDisplays your signs upright on desk or flat surface.For signs 11\" W x 8.5\" H.Self-Standing.Literature slides in from bottom.Made from clear plastic.\u003cbr\u003eSKU: ERSOIC23006"}
Officemate Horizontal Upright Sign Holder

Officemate Horizontal Upright Sign Holder

$21.69

MPN: 006492UPC: 042491230061Displays your signs upright on desk or flat surface. For signs 11" W x 8 1/2" H. Self-Standing. Literature slides in from bottom. Made from clear plastic.Key Features : Displays your signs upright on desk or flat surface.For signs 11" W x 8.5" H.Self-Standing.Literature slides in from bottom.Made from clear plastic.SK...


More Info
{"id":4715892736089,"title":"School Memory Album","handle":"school-memory-album","description":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 088231987697\u003cbr\u003eKeep your child's most treasured school memories in one beautiful book! Record your child's class information, add photos of friends, and jot down some of his or her favorite things. The spiral bound album has four pages and one double-sided pocket per grade. It has a total of 30 pages plus 14 pockets. Measures 10 3\/8\" x 11 3\/4\". Makes a great gift!\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eKeep your child's most treasured school memories in one beautiful book!The album has four pages and one two-sided pocket per grade for Grades K-6.Makes a great gift!Record your child's class information, add photos of friends, and jot down some of his or her favorite things.\u003cbr\u003eSKU: ERSTCR8769","published_at":"2022-06-28T22:08:39-04:00","created_at":"2020-09-09T18:37:54-04:00","vendor":"Teacher Created Resources","type":"Teacher Aids","tags":["5-11 years","Gifts","Paper\/Cardboard"],"price":4109,"price_min":4109,"price_max":4109,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156434235481,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSTCR8769","requires_shipping":true,"taxable":true,"featured_image":{"id":14725116657753,"product_id":4715892736089,"position":1,"created_at":"2020-09-09T18:37:54-04:00","updated_at":"2020-09-09T18:37:54-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8769.jpg?v=1599691074","variant_ids":[32156434235481]},"available":true,"name":"School Memory Album","public_title":null,"options":["Default Title"],"price":4109,"weight":907,"compare_at_price":null,"inventory_quantity":3,"inventory_management":"shopify","inventory_policy":"deny","barcode":"088231987697","featured_media":{"alt":null,"id":6896703144025,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8769.jpg?v=1599691074"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8769.jpg?v=1599691074","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8769_4.jpg?v=1599691077","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8769_3.jpg?v=1599691078","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8769_2.jpg?v=1599691080","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8769_1.jpg?v=1599691081"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8769.jpg?v=1599691074","options":["Title"],"media":[{"alt":null,"id":6896703144025,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8769.jpg?v=1599691074"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8769.jpg?v=1599691074","width":1500},{"alt":null,"id":6896703209561,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8769_4.jpg?v=1599691077"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8769_4.jpg?v=1599691077","width":1500},{"alt":null,"id":6896703275097,"position":3,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8769_3.jpg?v=1599691078"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8769_3.jpg?v=1599691078","width":1500},{"alt":null,"id":6896703307865,"position":4,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8769_2.jpg?v=1599691080"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8769_2.jpg?v=1599691080","width":1500},{"alt":null,"id":6896703373401,"position":5,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8769_1.jpg?v=1599691081"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8769_1.jpg?v=1599691081","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 088231987697\u003cbr\u003eKeep your child's most treasured school memories in one beautiful book! Record your child's class information, add photos of friends, and jot down some of his or her favorite things. The spiral bound album has four pages and one double-sided pocket per grade. It has a total of 30 pages plus 14 pockets. Measures 10 3\/8\" x 11 3\/4\". Makes a great gift!\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eKeep your child's most treasured school memories in one beautiful book!The album has four pages and one two-sided pocket per grade for Grades K-6.Makes a great gift!Record your child's class information, add photos of friends, and jot down some of his or her favorite things.\u003cbr\u003eSKU: ERSTCR8769"}
School Memory Album

School Memory Album

$41.09

MPN: 005003UPC: 088231987697Keep your child's most treasured school memories in one beautiful book! Record your child's class information, add photos of friends, and jot down some of his or her favorite things. The spiral bound album has four pages and one double-sided pocket per grade. It has a total of 30 pages plus 14 pockets. Measures 10 3/8...


More Info
{"id":4715890475097,"title":"Home Sweet Classroom Name Plates","handle":"home-sweet-classroom-name-plates","description":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 088231988281\u003cbr\u003eUse these Home Sweet Classroom name plates to help teachers and substitute teachers learn students' names. Use them to label learning centers, storage areas, and portfolio collections. Laminate them for use as vocabulary flash cards, or work bank labels. Measures approximately 3.5\" x 11.5\". Each pack includes 36 name plates.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eUse them to help teachers and substitute teachers learn students’ names.Use them to label learning centers, storage areas, and portfolio collections.Laminate them for use as vocabulary flash cards, or work bank labels.Name Plates measure approx. 3½\" x 11½\". 36 name plates per pack.\u003cbr\u003eSKU: ERSTCR8828","published_at":"2025-04-10T19:23:37-04:00","created_at":"2020-09-09T18:35:10-04:00","vendor":"Teacher Created Resources","type":"Teacher Aids","tags":["4+ years","Multi","Name Plates","Paper"],"price":821,"price_min":821,"price_max":821,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156430794841,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSTCR8828","requires_shipping":true,"taxable":true,"featured_image":{"id":14725112594521,"product_id":4715890475097,"position":1,"created_at":"2020-09-09T18:35:11-04:00","updated_at":"2020-09-09T18:35:11-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8828.jpg?v=1599690911","variant_ids":[32156430794841]},"available":true,"name":"Home Sweet Classroom Name Plates","public_title":null,"options":["Default Title"],"price":821,"weight":200,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"088231988281","featured_media":{"alt":null,"id":6896699080793,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8828.jpg?v=1599690911"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8828.jpg?v=1599690911"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8828.jpg?v=1599690911","options":["Title"],"media":[{"alt":null,"id":6896699080793,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8828.jpg?v=1599690911"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8828.jpg?v=1599690911","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 088231988281\u003cbr\u003eUse these Home Sweet Classroom name plates to help teachers and substitute teachers learn students' names. Use them to label learning centers, storage areas, and portfolio collections. Laminate them for use as vocabulary flash cards, or work bank labels. Measures approximately 3.5\" x 11.5\". Each pack includes 36 name plates.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eUse them to help teachers and substitute teachers learn students’ names.Use them to label learning centers, storage areas, and portfolio collections.Laminate them for use as vocabulary flash cards, or work bank labels.Name Plates measure approx. 3½\" x 11½\". 36 name plates per pack.\u003cbr\u003eSKU: ERSTCR8828"}
Home Sweet Classroom Name Plates

Home Sweet Classroom Name Plates

$8.21

MPN: 005003UPC: 088231988281Use these Home Sweet Classroom name plates to help teachers and substitute teachers learn students' names. Use them to label learning centers, storage areas, and portfolio collections. Laminate them for use as vocabulary flash cards, or work bank labels. Measures approximately 3.5" x 11.5". Each pack includes 36 name ...


More Info
{"id":4715890409561,"title":"Home Sweet Classroom Library Pocket","handle":"home-sweet-classroom-library-pocket","description":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 088231988274\u003cbr\u003eHome Sweet Classroom Library Pockets are handy little holders that have a multitude of uses inside the classroom and elsewhere! Put them on a bulletin board for an instant job chart! Add them to a classroom center to manage the work that students do there. Use them to hold craft sticks, game pieces, and 3x5 index cards. Of course, you can put them inside the books in your classroom library, too! Measures 3.5\" x 5\". Each pack includes 35 pieces in 5 designs.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eThese handy little holders have a multitude of uses inside the classroom and elsewhere!Add them to a classroom center to manage the work that students do there.Use them to hold craft sticks, game pieces, and 3x5 index cards.Your can put these Library Pockets inside the books in your classroom library, too!\u003cbr\u003eSKU: ERSTCR8827","published_at":"2025-04-10T19:23:37-04:00","created_at":"2020-09-09T18:35:01-04:00","vendor":"Teacher Created Resources","type":"Teacher Aids","tags":["4+ years","Library Cards","Multi","Paper"],"price":821,"price_min":821,"price_max":821,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156430729305,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSTCR8827","requires_shipping":true,"taxable":true,"featured_image":{"id":14725112266841,"product_id":4715890409561,"position":1,"created_at":"2020-09-09T18:35:02-04:00","updated_at":"2020-09-09T18:35:02-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8827.jpg?v=1599690902","variant_ids":[32156430729305]},"available":true,"name":"Home Sweet Classroom Library Pocket","public_title":null,"options":["Default Title"],"price":821,"weight":113,"compare_at_price":null,"inventory_quantity":26,"inventory_management":"shopify","inventory_policy":"deny","barcode":"088231988274","featured_media":{"alt":null,"id":6896698753113,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8827.jpg?v=1599690902"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8827.jpg?v=1599690902","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8827_5.jpg?v=1599690904","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8827_3.jpg?v=1599690905","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8827_2.jpg?v=1599690907","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8827_1.jpg?v=1599690908","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8827_4.jpg?v=1599690909"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8827.jpg?v=1599690902","options":["Title"],"media":[{"alt":null,"id":6896698753113,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8827.jpg?v=1599690902"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8827.jpg?v=1599690902","width":2100},{"alt":null,"id":6896698916953,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1590,"width":1590,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8827_5.jpg?v=1599690904"},"aspect_ratio":1.0,"height":1590,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8827_5.jpg?v=1599690904","width":1590},{"alt":null,"id":6896698949721,"position":3,"preview_image":{"aspect_ratio":1.0,"height":1590,"width":1590,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8827_3.jpg?v=1599690905"},"aspect_ratio":1.0,"height":1590,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8827_3.jpg?v=1599690905","width":1590},{"alt":null,"id":6896698982489,"position":4,"preview_image":{"aspect_ratio":1.0,"height":1590,"width":1590,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8827_2.jpg?v=1599690907"},"aspect_ratio":1.0,"height":1590,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8827_2.jpg?v=1599690907","width":1590},{"alt":null,"id":6896699015257,"position":5,"preview_image":{"aspect_ratio":1.0,"height":1590,"width":1590,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8827_1.jpg?v=1599690908"},"aspect_ratio":1.0,"height":1590,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8827_1.jpg?v=1599690908","width":1590},{"alt":null,"id":6896699048025,"position":6,"preview_image":{"aspect_ratio":1.0,"height":1590,"width":1590,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8827_4.jpg?v=1599690909"},"aspect_ratio":1.0,"height":1590,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8827_4.jpg?v=1599690909","width":1590}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 088231988274\u003cbr\u003eHome Sweet Classroom Library Pockets are handy little holders that have a multitude of uses inside the classroom and elsewhere! Put them on a bulletin board for an instant job chart! Add them to a classroom center to manage the work that students do there. Use them to hold craft sticks, game pieces, and 3x5 index cards. Of course, you can put them inside the books in your classroom library, too! Measures 3.5\" x 5\". Each pack includes 35 pieces in 5 designs.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eThese handy little holders have a multitude of uses inside the classroom and elsewhere!Add them to a classroom center to manage the work that students do there.Use them to hold craft sticks, game pieces, and 3x5 index cards.Your can put these Library Pockets inside the books in your classroom library, too!\u003cbr\u003eSKU: ERSTCR8827"}
Home Sweet Classroom Library Pocket

Home Sweet Classroom Library Pocket

$8.21

MPN: 005003UPC: 088231988274Home Sweet Classroom Library Pockets are handy little holders that have a multitude of uses inside the classroom and elsewhere! Put them on a bulletin board for an instant job chart! Add them to a classroom center to manage the work that students do there. Use them to hold craft sticks, game pieces, and 3x5 index card...


More Info
{"id":4715890344025,"title":"Home Sweet Classroom Name Tag-label","handle":"home-sweet-classroom-name-tag-label","description":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 088231988298\u003cbr\u003ePerfect for name tags, labels, award badges, parties, field trips, first days of school, parent visitation, student portfolios, cubbies, gift tags, and scrapbooking. Measures approximately 3.5\" x 2.5\". Each pack includes 36 pieces.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003ePerfect for name tags, labels, award badges, parties, field trips, first days of school, parent visitation, student portfolios, cubbies, gift tags, and scrapbooking.Measures approx. 3½\" x 2½\".36 pieces per pack.Home Sweet Classroom Name Tags\u003cbr\u003eSKU: ERSTCR8829","published_at":"2025-04-10T19:23:38-04:00","created_at":"2020-09-09T18:34:54-04:00","vendor":"Teacher Created Resources","type":"Teacher Aids","tags":["4+ years","Multi","Name Tags","Paper"],"price":684,"price_min":684,"price_max":684,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156430532697,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSTCR8829","requires_shipping":true,"taxable":true,"featured_image":{"id":14725112103001,"product_id":4715890344025,"position":1,"created_at":"2020-09-09T18:34:54-04:00","updated_at":"2020-09-09T18:34:54-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8829.jpg?v=1599690894","variant_ids":[32156430532697]},"available":true,"name":"Home Sweet Classroom Name Tag-label","public_title":null,"options":["Default Title"],"price":684,"weight":59,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"088231988298","featured_media":{"alt":null,"id":6896698589273,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8829.jpg?v=1599690894"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8829.jpg?v=1599690894","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8829_3.jpg?v=1599690897","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8829_1.jpg?v=1599690898","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8829_2.jpg?v=1599690899","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8829_4.jpg?v=1599690900"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8829.jpg?v=1599690894","options":["Title"],"media":[{"alt":null,"id":6896698589273,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8829.jpg?v=1599690894"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8829.jpg?v=1599690894","width":2100},{"alt":null,"id":6896698622041,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8829_3.jpg?v=1599690897"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8829_3.jpg?v=1599690897","width":1600},{"alt":null,"id":6896698654809,"position":3,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8829_1.jpg?v=1599690898"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8829_1.jpg?v=1599690898","width":1600},{"alt":null,"id":6896698687577,"position":4,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8829_2.jpg?v=1599690899"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8829_2.jpg?v=1599690899","width":1600},{"alt":null,"id":6896698720345,"position":5,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8829_4.jpg?v=1599690900"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8829_4.jpg?v=1599690900","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 088231988298\u003cbr\u003ePerfect for name tags, labels, award badges, parties, field trips, first days of school, parent visitation, student portfolios, cubbies, gift tags, and scrapbooking. Measures approximately 3.5\" x 2.5\". Each pack includes 36 pieces.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003ePerfect for name tags, labels, award badges, parties, field trips, first days of school, parent visitation, student portfolios, cubbies, gift tags, and scrapbooking.Measures approx. 3½\" x 2½\".36 pieces per pack.Home Sweet Classroom Name Tags\u003cbr\u003eSKU: ERSTCR8829"}
Home Sweet Classroom Name Tag-label

Home Sweet Classroom Name Tag-label

$6.84

MPN: 005003UPC: 088231988298Perfect for name tags, labels, award badges, parties, field trips, first days of school, parent visitation, student portfolios, cubbies, gift tags, and scrapbooking. Measures approximately 3.5" x 2.5". Each pack includes 36 pieces.Key Features : Perfect for name tags, labels, award badges, parties, field trips, first ...


More Info
{"id":4715890245721,"title":"Home Sweet Classroom Notepad","handle":"home-sweet-classroom-notepad","description":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 088231988335\u003cbr\u003eUse the Home Sweet Classroom Notepad for thank you notes, parent letters, invitations, notes to students, scrapbooking, creative writing, and more. Measures 5.25\" x 8.25\". Contains 50 sheets.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eHome Sweet Classroom ThemeMeasures 5¼\" x 8¼\".Contains 50 sheets.\u003cbr\u003eSKU: ERSTCR8833","published_at":"2025-04-10T19:52:36-04:00","created_at":"2020-09-09T18:34:45-04:00","vendor":"Teacher Created Resources","type":"Teacher Aids","tags":["5+ years","Home Sweet Classroom","Note Pads","Sweet"],"price":547,"price_min":547,"price_max":547,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156430434393,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSTCR8833","requires_shipping":true,"taxable":true,"featured_image":{"id":14725112004697,"product_id":4715890245721,"position":1,"created_at":"2020-09-09T18:34:45-04:00","updated_at":"2020-09-09T18:34:45-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8833.jpg?v=1599690885","variant_ids":[32156430434393]},"available":true,"name":"Home Sweet Classroom Notepad","public_title":null,"options":["Default Title"],"price":547,"weight":141,"compare_at_price":null,"inventory_quantity":17,"inventory_management":"shopify","inventory_policy":"deny","barcode":"088231988335","featured_media":{"alt":null,"id":6896698490969,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8833.jpg?v=1599690885"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8833.jpg?v=1599690885"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8833.jpg?v=1599690885","options":["Title"],"media":[{"alt":null,"id":6896698490969,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8833.jpg?v=1599690885"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR8833.jpg?v=1599690885","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 088231988335\u003cbr\u003eUse the Home Sweet Classroom Notepad for thank you notes, parent letters, invitations, notes to students, scrapbooking, creative writing, and more. Measures 5.25\" x 8.25\". Contains 50 sheets.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eHome Sweet Classroom ThemeMeasures 5¼\" x 8¼\".Contains 50 sheets.\u003cbr\u003eSKU: ERSTCR8833"}
Home Sweet Classroom Notepad

Home Sweet Classroom Notepad

$5.47

MPN: 005003UPC: 088231988335Use the Home Sweet Classroom Notepad for thank you notes, parent letters, invitations, notes to students, scrapbooking, creative writing, and more. Measures 5.25" x 8.25". Contains 50 sheets.Key Features : Home Sweet Classroom ThemeMeasures 5¼" x 8¼".Contains 50 sheets.SKU: ERSTCR8833


More Info
{"id":4715882840153,"title":"Multipurpose Zipper Bags 3 Pk Honeywell","handle":"multipurpose-zipper-bags-3-pk-honeywell","description":"MPN: 006568\u003cbr\u003e\u003cbr\u003eUPC: 814113015734\u003cbr\u003eThe Honeywell 6503 multipurpose zipper bag 3 pack is a great way to keep small objects secure when on the go. Keep your belongings organized in this set of three sturdy zipping polyester bags. The Honeywell 6503 is backed by a 1 year limited warranty.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003e3 Zipper Bags IncludedCash \u0026amp; Coin OrganizationStores Checks \u0026amp; Currency\u003cbr\u003eSKU: ERSLHL6503","published_at":"2020-10-08T20:28:22-04:00","created_at":"2020-09-09T18:27:20-04:00","vendor":"Lh Licensed Products Inc","type":"Teacher Aids","tags":["10+ years","Blue","Storage","Vinyl \u0026 Plastic"],"price":4513,"price_min":4513,"price_max":4513,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156419457113,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSLHL6503","requires_shipping":true,"taxable":true,"featured_image":{"id":14725100535897,"product_id":4715882840153,"position":1,"created_at":"2020-09-09T18:27:21-04:00","updated_at":"2020-09-09T18:27:21-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLHL6503.jpg?v=1599690441","variant_ids":[32156419457113]},"available":true,"name":"Multipurpose Zipper Bags 3 Pk Honeywell","public_title":null,"options":["Default Title"],"price":4513,"weight":150,"compare_at_price":null,"inventory_quantity":4,"inventory_management":"shopify","inventory_policy":"deny","barcode":"814113015734","featured_media":{"alt":null,"id":6896687054937,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLHL6503.jpg?v=1599690441"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLHL6503.jpg?v=1599690441"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLHL6503.jpg?v=1599690441","options":["Title"],"media":[{"alt":null,"id":6896687054937,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLHL6503.jpg?v=1599690441"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLHL6503.jpg?v=1599690441","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006568\u003cbr\u003e\u003cbr\u003eUPC: 814113015734\u003cbr\u003eThe Honeywell 6503 multipurpose zipper bag 3 pack is a great way to keep small objects secure when on the go. Keep your belongings organized in this set of three sturdy zipping polyester bags. The Honeywell 6503 is backed by a 1 year limited warranty.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003e3 Zipper Bags IncludedCash \u0026amp; Coin OrganizationStores Checks \u0026amp; Currency\u003cbr\u003eSKU: ERSLHL6503"}
Multipurpose Zipper Bags 3 Pk Honeywell

Multipurpose Zipper Bags 3 Pk Honeywell

$45.13

MPN: 006568UPC: 814113015734The Honeywell 6503 multipurpose zipper bag 3 pack is a great way to keep small objects secure when on the go. Keep your belongings organized in this set of three sturdy zipping polyester bags. The Honeywell 6503 is backed by a 1 year limited warranty.Key Features : 3 Zipper Bags IncludedCash & Coin OrganizationSto...


More Info
{"id":4715880874073,"title":"(2 Ea) Superhero Chest","handle":"2-ea-superhero-chest","description":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 194629053087\u003cbr\u003eUse Classroom Chests to hold: rewards for achievements, readers, manipulatives for learning centers, special surprises, wristbands, stickers, and more! Assembled chest measures 9.5\" x 8\" x 8.5\" high. Directions for assembly included. Rewards sold separately. Sold as a pack of 2 chests.\u003cbr\u003eSKU: ERSTCR5160-2","published_at":"2023-03-15T21:29:18-04:00","created_at":"2020-09-09T18:25:10-04:00","vendor":"Teacher Created Resources","type":"Teacher Aids","tags":["3+ years","Accessories","Cardboard","Multi"],"price":3559,"price_min":3559,"price_max":3559,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156416213081,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSTCR5160-2","requires_shipping":true,"taxable":true,"featured_image":{"id":14725096603737,"product_id":4715880874073,"position":1,"created_at":"2020-09-09T18:25:10-04:00","updated_at":"2020-09-09T18:25:10-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR5160-2.jpg?v=1599690310","variant_ids":[32156416213081]},"available":true,"name":"(2 Ea) Superhero Chest","public_title":null,"options":["Default Title"],"price":3559,"weight":535,"compare_at_price":null,"inventory_quantity":22,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629053087","featured_media":{"alt":null,"id":6896683090009,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR5160-2.jpg?v=1599690310"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR5160-2.jpg?v=1599690310"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR5160-2.jpg?v=1599690310","options":["Title"],"media":[{"alt":null,"id":6896683090009,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR5160-2.jpg?v=1599690310"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR5160-2.jpg?v=1599690310","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 194629053087\u003cbr\u003eUse Classroom Chests to hold: rewards for achievements, readers, manipulatives for learning centers, special surprises, wristbands, stickers, and more! Assembled chest measures 9.5\" x 8\" x 8.5\" high. Directions for assembly included. Rewards sold separately. Sold as a pack of 2 chests.\u003cbr\u003eSKU: ERSTCR5160-2"}
(2 Ea) Superhero Chest

(2 Ea) Superhero Chest

$35.59

MPN: 005003UPC: 194629053087Use Classroom Chests to hold: rewards for achievements, readers, manipulatives for learning centers, special surprises, wristbands, stickers, and more! Assembled chest measures 9.5" x 8" x 8.5" high. Directions for assembly included. Rewards sold separately. Sold as a pack of 2 chests.SKU: ERSTCR5160-2


More Info
{"id":4715878547545,"title":"Pendaflex Poly File Jackets 10 Ct Letter Size","handle":"pendaflex-poly-file-jackets-10-ct-letter-size","description":"MPN: 006517\u003cbr\u003e\u003cbr\u003eUPC: 078787509900\u003cbr\u003ePerfect for storing or carrying all your projects. Expands to 1\". Durable translucent poly construction is wear, tear and moisture resistant. Assorted includes Blue, Green Yellow, Magenta, Purple. Letter.\u003cbr\u003eSKU: ERSESS50990","published_at":"2022-11-16T21:09:20-05:00","created_at":"2020-09-09T18:22:28-04:00","vendor":"Tops Products","type":"Teacher Aids","tags":["Storage"],"price":4392,"price_min":4392,"price_max":4392,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156412346457,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSESS50990","requires_shipping":true,"taxable":true,"featured_image":{"id":14729198993497,"product_id":4715878547545,"position":1,"created_at":"2020-09-10T16:20:14-04:00","updated_at":"2020-09-10T16:20:14-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSESS50990.jpg?v=1599769214","variant_ids":[32156412346457]},"available":true,"name":"Pendaflex Poly File Jackets 10 Ct Letter Size","public_title":null,"options":["Default Title"],"price":4392,"weight":445,"compare_at_price":null,"inventory_quantity":18,"inventory_management":"shopify","inventory_policy":"deny","barcode":"078787509900","featured_media":{"alt":null,"id":6900788133977,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSESS50990.jpg?v=1599769214"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSESS50990.jpg?v=1599769214"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSESS50990.jpg?v=1599769214","options":["Title"],"media":[{"alt":null,"id":6900788133977,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSESS50990.jpg?v=1599769214"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSESS50990.jpg?v=1599769214","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006517\u003cbr\u003e\u003cbr\u003eUPC: 078787509900\u003cbr\u003ePerfect for storing or carrying all your projects. Expands to 1\". Durable translucent poly construction is wear, tear and moisture resistant. Assorted includes Blue, Green Yellow, Magenta, Purple. Letter.\u003cbr\u003eSKU: ERSESS50990"}
Pendaflex Poly File Jackets 10 Ct Letter Size

Pendaflex Poly File Jackets 10 Ct Letter Size

$43.92

MPN: 006517UPC: 078787509900Perfect for storing or carrying all your projects. Expands to 1". Durable translucent poly construction is wear, tear and moisture resistant. Assorted includes Blue, Green Yellow, Magenta, Purple. Letter.SKU: ERSESS50990


More Info
{"id":4715877367897,"title":"Honeywell Key Box 24 Slot","handle":"honeywell-key-box-24-slot","description":"MPN: 006568\u003cbr\u003e\u003cbr\u003eUPC: 814113016052\u003cbr\u003eThis Honeywell model 6105 steel 24 key security box features 24 key hooks with 24 key rings and tags included. This security box is key locking with 2 entry keys included, has a durable, scratch resistant powder coat finish and pre drilled holes with all mounting hardware and instructions. This Honeywell security box is backed by a 1 year limited warranty.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003e24 Key Hooks (Tags \u0026amp; Rings Included)Key Lock w\/ 2 Entry KeysPredrilled Mounting HolesMounting Kit with Bolts IncludedScratch Resistant Powder Coat Finish1 Year Warranty\u003cbr\u003eSKU: ERSLHL6105","published_at":"2020-10-08T17:19:21-04:00","created_at":"2020-09-09T18:21:08-04:00","vendor":"Lh Licensed Products Inc","type":"Teacher Aids","tags":["10+ years","Black","Steel","Storage"],"price":5116,"price_min":5116,"price_max":5116,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32156410249305,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSLHL6105","requires_shipping":true,"taxable":true,"featured_image":{"id":14725089820761,"product_id":4715877367897,"position":1,"created_at":"2020-09-09T18:21:09-04:00","updated_at":"2020-09-09T18:21:09-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLHL6105.jpg?v=1599690069","variant_ids":[32156410249305]},"available":true,"name":"Honeywell Key Box 24 Slot","public_title":null,"options":["Default Title"],"price":5116,"weight":680,"compare_at_price":null,"inventory_quantity":15,"inventory_management":"shopify","inventory_policy":"deny","barcode":"814113016052","featured_media":{"alt":null,"id":6896676307033,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLHL6105.jpg?v=1599690069"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLHL6105.jpg?v=1599690069","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLHL6105_1.jpg?v=1599690072"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLHL6105.jpg?v=1599690069","options":["Title"],"media":[{"alt":null,"id":6896676307033,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLHL6105.jpg?v=1599690069"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLHL6105.jpg?v=1599690069","width":2100},{"alt":null,"id":6896676372569,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLHL6105_1.jpg?v=1599690072"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLHL6105_1.jpg?v=1599690072","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006568\u003cbr\u003e\u003cbr\u003eUPC: 814113016052\u003cbr\u003eThis Honeywell model 6105 steel 24 key security box features 24 key hooks with 24 key rings and tags included. This security box is key locking with 2 entry keys included, has a durable, scratch resistant powder coat finish and pre drilled holes with all mounting hardware and instructions. This Honeywell security box is backed by a 1 year limited warranty.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003e24 Key Hooks (Tags \u0026amp; Rings Included)Key Lock w\/ 2 Entry KeysPredrilled Mounting HolesMounting Kit with Bolts IncludedScratch Resistant Powder Coat Finish1 Year Warranty\u003cbr\u003eSKU: ERSLHL6105"}
Honeywell Key Box 24 Slot

Honeywell Key Box 24 Slot

$51.16

MPN: 006568UPC: 814113016052This Honeywell model 6105 steel 24 key security box features 24 key hooks with 24 key rings and tags included. This security box is key locking with 2 entry keys included, has a durable, scratch resistant powder coat finish and pre drilled holes with all mounting hardware and instructions. This Honeywell security box ...


More Info