Teacher Aids

Sort by:
{"id":4716415713369,"title":"Notepad Large Star 50 Sheets 5 X 7","handle":"notepad-large-star-50-sheets-5-x-7","description":"MPN: 006459\u003cbr\u003e\u003cbr\u003eUPC: 098497001129\u003cbr\u003e50 sheets per package and is approx. 5\" x 7.\" It is great for making word cards, shaped books, game parts, scrapbooks and much more. ACID FREE!\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eGreat for making word cards, shaped books, game parts, scrapbooks and much moreApprox 5\" x 7\"50 sheets per package and is approx\u003cbr\u003eSKU: ERSSE-112","published_at":"2025-04-10T20:01:43-04:00","created_at":"2020-09-10T04:41:09-04:00","vendor":"Creative Shapes Etc. Llc","type":"Teacher Aids","tags":["Note Pads","Yellow"],"price":821,"price_min":821,"price_max":821,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157615685721,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSSE-112","requires_shipping":true,"taxable":true,"featured_image":{"id":14726715768921,"product_id":4716415713369,"position":1,"created_at":"2020-09-10T04:41:09-04:00","updated_at":"2020-09-10T04:41:09-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSSE-112.jpg?v=1599727269","variant_ids":[32157615685721]},"available":true,"name":"Notepad Large Star 50 Sheets 5 X 7","public_title":null,"options":["Default Title"],"price":821,"weight":59,"compare_at_price":null,"inventory_quantity":6,"inventory_management":"shopify","inventory_policy":"deny","barcode":"098497001129","featured_media":{"alt":null,"id":6898303467609,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSSE-112.jpg?v=1599727269"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSSE-112.jpg?v=1599727269"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSSE-112.jpg?v=1599727269","options":["Title"],"media":[{"alt":null,"id":6898303467609,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSSE-112.jpg?v=1599727269"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSSE-112.jpg?v=1599727269","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006459\u003cbr\u003e\u003cbr\u003eUPC: 098497001129\u003cbr\u003e50 sheets per package and is approx. 5\" x 7.\" It is great for making word cards, shaped books, game parts, scrapbooks and much more. ACID FREE!\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eGreat for making word cards, shaped books, game parts, scrapbooks and much moreApprox 5\" x 7\"50 sheets per package and is approx\u003cbr\u003eSKU: ERSSE-112"}
Notepad Large Star 50 Sheets 5 X 7

Notepad Large Star 50 Sheets 5 X 7

$8.21

MPN: 006459UPC: 09849700112950 sheets per package and is approx. 5" x 7." It is great for making word cards, shaped books, game parts, scrapbooks and much more. ACID FREE!Key Features : Great for making word cards, shaped books, game parts, scrapbooks and much moreApprox 5" x 7"50 sheets per package and is approxSKU: ERSSE-112


More Info
{"id":4716415287385,"title":"Small Sand Timers 10 Minute 4-pk","handle":"small-sand-timers-10-minute-4-pk","description":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 088231906827\u003cbr\u003eRace to see how much can be accomplished before time runs out. Great for games, timed tests, and time management.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eRace to see how much can be accomplished before time runs out.Great for games.Timed tests.Time management.\u003cbr\u003eSKU: ERSTCR20682","published_at":"2025-04-10T19:32:46-04:00","created_at":"2020-09-10T04:40:31-04:00","vendor":"Teacher Created Resources","type":"Teacher Aids","tags":["5+ years","Plastic","Purple","Sand","Sand Timers","Timers"],"price":821,"price_min":821,"price_max":821,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157615194201,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSTCR20682","requires_shipping":true,"taxable":true,"featured_image":{"id":14726714294361,"product_id":4716415287385,"position":1,"created_at":"2020-09-10T04:40:31-04:00","updated_at":"2020-09-10T04:40:31-04:00","alt":null,"width":1600,"height":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR20682.jpg?v=1599727231","variant_ids":[32157615194201]},"available":true,"name":"Small Sand Timers 10 Minute 4-pk","public_title":null,"options":["Default Title"],"price":821,"weight":86,"compare_at_price":null,"inventory_quantity":48,"inventory_management":"shopify","inventory_policy":"deny","barcode":"088231906827","featured_media":{"alt":null,"id":6898301993049,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR20682.jpg?v=1599727231"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR20682.jpg?v=1599727231"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR20682.jpg?v=1599727231","options":["Title"],"media":[{"alt":null,"id":6898301993049,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR20682.jpg?v=1599727231"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR20682.jpg?v=1599727231","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 088231906827\u003cbr\u003eRace to see how much can be accomplished before time runs out. Great for games, timed tests, and time management.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eRace to see how much can be accomplished before time runs out.Great for games.Timed tests.Time management.\u003cbr\u003eSKU: ERSTCR20682"}
Small Sand Timers 10 Minute 4-pk

Small Sand Timers 10 Minute 4-pk

$8.21

MPN: 005003UPC: 088231906827Race to see how much can be accomplished before time runs out. Great for games, timed tests, and time management.Key Features : Race to see how much can be accomplished before time runs out.Great for games.Timed tests.Time management.SKU: ERSTCR20682


More Info
{"id":4716415221849,"title":"Moroccan Magnetic Labels","handle":"moroccan-magnetic-labels","description":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 088231906841\u003cbr\u003eMulti-purpose labels have a write-on\/wipe-off surface and magnetic back. Use on dry erase boards and cabinets. Each pack has 3 each of 10 polka dot colors.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eMulti-purpose labels have a write-on\/wipe-off surface and magnetic back.Use on dry erase boards and cabinets.Each pack has 3 each of 10 polka dot colors.\u003cbr\u003eSKU: ERSTCR20684","published_at":"2025-04-10T19:32:46-04:00","created_at":"2020-09-10T04:40:18-04:00","vendor":"Teacher Created Resources","type":"Teacher Aids","tags":["3+ years","Assorted","Magnet","Moroccan Theme","Name Plates","Plastic"],"price":1369,"price_min":1369,"price_max":1369,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157615128665,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSTCR20684","requires_shipping":true,"taxable":true,"featured_image":{"id":14726713442393,"product_id":4716415221849,"position":1,"created_at":"2020-09-10T04:40:19-04:00","updated_at":"2020-09-10T04:40:19-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR20684.jpg?v=1599727219","variant_ids":[32157615128665]},"available":true,"name":"Moroccan Magnetic Labels","public_title":null,"options":["Default Title"],"price":1369,"weight":141,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"088231906841","featured_media":{"alt":null,"id":6898301141081,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR20684.jpg?v=1599727219"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR20684.jpg?v=1599727219"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR20684.jpg?v=1599727219","options":["Title"],"media":[{"alt":null,"id":6898301141081,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR20684.jpg?v=1599727219"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR20684.jpg?v=1599727219","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 088231906841\u003cbr\u003eMulti-purpose labels have a write-on\/wipe-off surface and magnetic back. Use on dry erase boards and cabinets. Each pack has 3 each of 10 polka dot colors.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eMulti-purpose labels have a write-on\/wipe-off surface and magnetic back.Use on dry erase boards and cabinets.Each pack has 3 each of 10 polka dot colors.\u003cbr\u003eSKU: ERSTCR20684"}
Moroccan Magnetic Labels

Moroccan Magnetic Labels

$13.69

MPN: 005003UPC: 088231906841Multi-purpose labels have a write-on/wipe-off surface and magnetic back. Use on dry erase boards and cabinets. Each pack has 3 each of 10 polka dot colors.Key Features : Multi-purpose labels have a write-on/wipe-off surface and magnetic back.Use on dry erase boards and cabinets.Each pack has 3 each of 10 polka dot col...


More Info
{"id":4716413124697,"title":"Notepad Mini Star","handle":"notepad-mini-star","description":"MPN: 006459\u003cbr\u003e\u003cbr\u003eUPC: 098497007145\u003cbr\u003e35 sheets per package and is approx. 3\" x 3\". They're great for making word cards, mini-books, and game parts, as well as scrapbooking. Acid Free!\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eThey're great for making word cards, mini-books, and game parts, as well as scrapbookingApprox. 3\" x 3\"35 sheets per package\u003cbr\u003eSKU: ERSSE-714","published_at":"2025-04-10T19:32:41-04:00","created_at":"2020-09-10T04:37:15-04:00","vendor":"Creative Shapes Etc. Llc","type":"Teacher Aids","tags":["Note Pads","Yellow"],"price":643,"price_min":643,"price_max":643,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157612769369,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSSE-714","requires_shipping":true,"taxable":true,"featured_image":{"id":14726702628953,"product_id":4716413124697,"position":1,"created_at":"2020-09-10T04:37:15-04:00","updated_at":"2020-09-10T04:37:15-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSSE-714.jpg?v=1599727035","variant_ids":[32157612769369]},"available":true,"name":"Notepad Mini Star","public_title":null,"options":["Default Title"],"price":643,"weight":18,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"098497007145","featured_media":{"alt":null,"id":6898290327641,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSSE-714.jpg?v=1599727035"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSSE-714.jpg?v=1599727035"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSSE-714.jpg?v=1599727035","options":["Title"],"media":[{"alt":null,"id":6898290327641,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSSE-714.jpg?v=1599727035"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSSE-714.jpg?v=1599727035","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006459\u003cbr\u003e\u003cbr\u003eUPC: 098497007145\u003cbr\u003e35 sheets per package and is approx. 3\" x 3\". They're great for making word cards, mini-books, and game parts, as well as scrapbooking. Acid Free!\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eThey're great for making word cards, mini-books, and game parts, as well as scrapbookingApprox. 3\" x 3\"35 sheets per package\u003cbr\u003eSKU: ERSSE-714"}
Notepad Mini Star

Notepad Mini Star

$6.43

MPN: 006459UPC: 09849700714535 sheets per package and is approx. 3" x 3". They're great for making word cards, mini-books, and game parts, as well as scrapbooking. Acid Free!Key Features : They're great for making word cards, mini-books, and game parts, as well as scrapbookingApprox. 3" x 3"35 sheets per packageSKU: ERSSE-714


More Info
{"id":4716410470489,"title":"Jumbo Washable 4in1 Stamp Pad","handle":"jumbo-washable-4in1-stamp-pad","description":"MPN: 005646\u003cbr\u003e\u003cbr\u003eUPC: 734653032643\u003cbr\u003eStamp and create with this Jumbo 4-in-1 Washable Stamp Pad! This stamp pad includes 4 separate ink pads of red, yellow, green and blue ink. Made of non-toxic ink, this stamp pad is safe for ages 3+. The ink is acid-free and fade resistant for archival quality, which means you can store your little artist's creations forever! An open-ended tool to decorate scrapbooks, notebooks or cards, this stamp pad inspires creative expression and imagination. As children stamp, they will develop fine motor skills and hand-eye coordination. The ink will wash off skin with soap and water. Size of each color: 2.9\"L x 2.9\"W.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eThis large stamp pad includes 4 different ink pads: red, yellow, green and blue. The ink pads measure 2.9\"L x 2.9\"W.The ink in this stamp pad washes off skin with soap and water, which makes clean-up quick and easy.This kid-friendly, non-toxic stamp pad is a safe craft resource for little artists. Children love to use it with stamps or create fingerprint art.The high-quality ink provides sharp images when stamped. Use it to decorate posters, signs, notebooks and so much more!Conforms to ASTM D-4236\u003cbr\u003eSKU: ERSCE-6645","published_at":"2025-04-10T19:59:10-04:00","created_at":"2020-09-10T04:34:00-04:00","vendor":"Learning Advantage","type":"Teacher Aids","tags":["3+ years","Blue","Green","non-toxic","Plastic","Red","Stamps \u0026 Stamp Pads","washable Ink","Yellow"],"price":1232,"price_min":1232,"price_max":1232,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157603790937,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCE-6645","requires_shipping":true,"taxable":true,"featured_image":{"id":14726692307033,"product_id":4716410470489,"position":1,"created_at":"2020-09-10T04:34:00-04:00","updated_at":"2020-09-10T04:34:00-04:00","alt":null,"width":1800,"height":1800,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6645.jpg?v=1599726840","variant_ids":[32157603790937]},"available":true,"name":"Jumbo Washable 4in1 Stamp Pad","public_title":null,"options":["Default Title"],"price":1232,"weight":86,"compare_at_price":null,"inventory_quantity":24,"inventory_management":"shopify","inventory_policy":"deny","barcode":"734653032643","featured_media":{"alt":null,"id":6898280005721,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1800,"width":1800,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6645.jpg?v=1599726840"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6645.jpg?v=1599726840"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6645.jpg?v=1599726840","options":["Title"],"media":[{"alt":null,"id":6898280005721,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1800,"width":1800,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6645.jpg?v=1599726840"},"aspect_ratio":1.0,"height":1800,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6645.jpg?v=1599726840","width":1800}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005646\u003cbr\u003e\u003cbr\u003eUPC: 734653032643\u003cbr\u003eStamp and create with this Jumbo 4-in-1 Washable Stamp Pad! This stamp pad includes 4 separate ink pads of red, yellow, green and blue ink. Made of non-toxic ink, this stamp pad is safe for ages 3+. The ink is acid-free and fade resistant for archival quality, which means you can store your little artist's creations forever! An open-ended tool to decorate scrapbooks, notebooks or cards, this stamp pad inspires creative expression and imagination. As children stamp, they will develop fine motor skills and hand-eye coordination. The ink will wash off skin with soap and water. Size of each color: 2.9\"L x 2.9\"W.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eThis large stamp pad includes 4 different ink pads: red, yellow, green and blue. The ink pads measure 2.9\"L x 2.9\"W.The ink in this stamp pad washes off skin with soap and water, which makes clean-up quick and easy.This kid-friendly, non-toxic stamp pad is a safe craft resource for little artists. Children love to use it with stamps or create fingerprint art.The high-quality ink provides sharp images when stamped. Use it to decorate posters, signs, notebooks and so much more!Conforms to ASTM D-4236\u003cbr\u003eSKU: ERSCE-6645"}
Jumbo Washable 4in1 Stamp Pad

Jumbo Washable 4in1 Stamp Pad

$12.32

MPN: 005646UPC: 734653032643Stamp and create with this Jumbo 4-in-1 Washable Stamp Pad! This stamp pad includes 4 separate ink pads of red, yellow, green and blue ink. Made of non-toxic ink, this stamp pad is safe for ages 3+. The ink is acid-free and fade resistant for archival quality, which means you can store your little artist's creations f...


More Info
{"id":4716410372185,"title":"Visitor Badges With Registry Log 150 Badges \u0026 Log Book","handle":"visitor-badges-with-registry-log-150-badges-log-book","description":"MPN: 000757\u003cbr\u003e\u003cbr\u003eUPC: 038944970301\u003cbr\u003eVisitor Badges with Registry Log. Keep track of visitors in your facility with one convenient book. When the badge is filled out, the visitor names are entered in registry book, providing a written record of their visit to your facility. Each book contains 150 self-adhesive visitor badges. Carbonless copy of each badge is kept in registry book for reference. Store completed registry book when all badges are used. Badges measure 3-5\/8\" x 1-7\/8\".\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eWhen the badge is filled out, the visitor names are entered in registry book, providing a written record of their visit to your facilityEach book contains 150 self-adhesive visitor badgesCarbonless copy of each badge is kept in registry book for referenceStore completed registry book when all badges are used\u003cbr\u003eSKU: ERSCLI97030","published_at":"2020-10-08T18:04:08-04:00","created_at":"2020-09-10T04:33:52-04:00","vendor":"C-line Products Inc","type":"Teacher Aids","tags":["7+ years","Accessories","Paper","White"],"price":8680,"price_min":8680,"price_max":8680,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157603692633,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCLI97030","requires_shipping":true,"taxable":true,"featured_image":{"id":14726691717209,"product_id":4716410372185,"position":1,"created_at":"2020-09-10T04:33:52-04:00","updated_at":"2020-09-10T04:33:52-04:00","alt":null,"width":1800,"height":1800,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCLI97030.jpg?v=1599726832","variant_ids":[32157603692633]},"available":true,"name":"Visitor Badges With Registry Log 150 Badges \u0026 Log Book","public_title":null,"options":["Default Title"],"price":8680,"weight":454,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"038944970301","featured_media":{"alt":null,"id":6898279415897,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1800,"width":1800,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCLI97030.jpg?v=1599726832"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCLI97030.jpg?v=1599726832"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCLI97030.jpg?v=1599726832","options":["Title"],"media":[{"alt":null,"id":6898279415897,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1800,"width":1800,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCLI97030.jpg?v=1599726832"},"aspect_ratio":1.0,"height":1800,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCLI97030.jpg?v=1599726832","width":1800}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 000757\u003cbr\u003e\u003cbr\u003eUPC: 038944970301\u003cbr\u003eVisitor Badges with Registry Log. Keep track of visitors in your facility with one convenient book. When the badge is filled out, the visitor names are entered in registry book, providing a written record of their visit to your facility. Each book contains 150 self-adhesive visitor badges. Carbonless copy of each badge is kept in registry book for reference. Store completed registry book when all badges are used. Badges measure 3-5\/8\" x 1-7\/8\".\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eWhen the badge is filled out, the visitor names are entered in registry book, providing a written record of their visit to your facilityEach book contains 150 self-adhesive visitor badgesCarbonless copy of each badge is kept in registry book for referenceStore completed registry book when all badges are used\u003cbr\u003eSKU: ERSCLI97030"}
Visitor Badges With Registry Log 150 Badges & Log Book

Visitor Badges With Registry Log 150 Badges & Log Book

$86.80

MPN: 000757UPC: 038944970301Visitor Badges with Registry Log. Keep track of visitors in your facility with one convenient book. When the badge is filled out, the visitor names are entered in registry book, providing a written record of their visit to your facility. Each book contains 150 self-adhesive visitor badges. Carbonless copy of each badg...


More Info
{"id":4716407291993,"title":"Counting \u0026 Place Value Pocket Chart","handle":"counting-place-value-pocket-chart","description":"MPN: 005083\u003cbr\u003e\u003cbr\u003eUPC: 765023024166\u003cbr\u003eTeach counting, sorting, place value and grouping with this heavy-duty chart. Includes a set of 20 double-sided number cards, three double-sided title cards, 200 blue plastic counting straws, pockets to store everything and activity guide. Chart measures 13\"W x 18\"H.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eInvite students to gain hands-on experience with numbers and place value!Compact size plus 2 grommets allow you to hang this handy chart anywhere in your classroomExcellent for ages 6 and up\u003cbr\u003eSKU: ERSLER2416","published_at":"2021-10-14T22:06:34-04:00","created_at":"2020-09-10T04:29:59-04:00","vendor":"Learning Resources","type":"Teacher Aids","tags":["6+ years","Pocket Charts"],"price":2054,"price_min":2054,"price_max":2054,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157597106265,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSLER2416","requires_shipping":true,"taxable":true,"featured_image":{"id":14726677528665,"product_id":4716407291993,"position":1,"created_at":"2020-09-10T04:29:59-04:00","updated_at":"2020-09-10T04:29:59-04:00","alt":null,"width":1972,"height":1972,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2416.jpg?v=1599726599","variant_ids":[32157597106265]},"available":true,"name":"Counting \u0026 Place Value Pocket Chart","public_title":null,"options":["Default Title"],"price":2054,"weight":295,"compare_at_price":null,"inventory_quantity":8,"inventory_management":"shopify","inventory_policy":"deny","barcode":"765023024166","featured_media":{"alt":null,"id":6898265227353,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1972,"width":1972,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2416.jpg?v=1599726599"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2416.jpg?v=1599726599","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2416_1.jpg?v=1599726602"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2416.jpg?v=1599726599","options":["Title"],"media":[{"alt":null,"id":6898265227353,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1972,"width":1972,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2416.jpg?v=1599726599"},"aspect_ratio":1.0,"height":1972,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2416.jpg?v=1599726599","width":1972},{"alt":null,"id":6898265292889,"position":2,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2416_1.jpg?v=1599726602"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2416_1.jpg?v=1599726602","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005083\u003cbr\u003e\u003cbr\u003eUPC: 765023024166\u003cbr\u003eTeach counting, sorting, place value and grouping with this heavy-duty chart. Includes a set of 20 double-sided number cards, three double-sided title cards, 200 blue plastic counting straws, pockets to store everything and activity guide. Chart measures 13\"W x 18\"H.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eInvite students to gain hands-on experience with numbers and place value!Compact size plus 2 grommets allow you to hang this handy chart anywhere in your classroomExcellent for ages 6 and up\u003cbr\u003eSKU: ERSLER2416"}
Counting & Place Value Pocket Chart

Counting & Place Value Pocket Chart

$20.54

MPN: 005083UPC: 765023024166Teach counting, sorting, place value and grouping with this heavy-duty chart. Includes a set of 20 double-sided number cards, three double-sided title cards, 200 blue plastic counting straws, pockets to store everything and activity guide. Chart measures 13"W x 18"H.Key Features : Invite students to gain hands-on expe...


More Info
{"id":4716406145113,"title":"Ombre Ez Grader","handle":"ombre-ez-grader","description":"MPN: 005028\u003cbr\u003e\u003cbr\u003eUPC: 789328020173\u003cbr\u003eThis slidechart is the same size as our popular \"Original, Pink or Purple\", but is done in a beautiful graduated color. This Ombre chart starts with Byzantine, which is a rich tone of purple toned towards Magenta. Scores any number of questions up to 95, with up to 34 incorrect. Actual size is 8.5\" x 4.75\". Saves time and effort when grading homework, tests or quizzes.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eSaves time and effort when grading honework, tests or quizes.Rectangle shapedDurableAges 5+\u003cbr\u003eSKU: ERSEZ-2017","published_at":"2025-04-10T19:59:01-04:00","created_at":"2020-09-10T04:28:31-04:00","vendor":"Original E-z Grader","type":"Teacher Aids","tags":["5+ years","E-Z Grader slidecharts","Graders","Paper","Pink","Purple"],"price":1089,"price_min":1089,"price_max":1089,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157595238489,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSEZ-2017","requires_shipping":true,"taxable":true,"featured_image":{"id":14726673563737,"product_id":4716406145113,"position":1,"created_at":"2020-09-10T04:28:31-04:00","updated_at":"2020-09-10T04:28:31-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEZ-2017.jpg?v=1599726511","variant_ids":[32157595238489]},"available":true,"name":"Ombre Ez Grader","public_title":null,"options":["Default Title"],"price":1089,"weight":590,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"789328020173","featured_media":{"alt":null,"id":6898261262425,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEZ-2017.jpg?v=1599726511"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEZ-2017.jpg?v=1599726511"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEZ-2017.jpg?v=1599726511","options":["Title"],"media":[{"alt":null,"id":6898261262425,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEZ-2017.jpg?v=1599726511"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEZ-2017.jpg?v=1599726511","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005028\u003cbr\u003e\u003cbr\u003eUPC: 789328020173\u003cbr\u003eThis slidechart is the same size as our popular \"Original, Pink or Purple\", but is done in a beautiful graduated color. This Ombre chart starts with Byzantine, which is a rich tone of purple toned towards Magenta. Scores any number of questions up to 95, with up to 34 incorrect. Actual size is 8.5\" x 4.75\". Saves time and effort when grading homework, tests or quizzes.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eSaves time and effort when grading honework, tests or quizes.Rectangle shapedDurableAges 5+\u003cbr\u003eSKU: ERSEZ-2017"}
Ombre Ez Grader

Ombre Ez Grader

$10.89

MPN: 005028UPC: 789328020173This slidechart is the same size as our popular "Original, Pink or Purple", but is done in a beautiful graduated color. This Ombre chart starts with Byzantine, which is a rich tone of purple toned towards Magenta. Scores any number of questions up to 95, with up to 34 incorrect. Actual size is 8.5" x 4.75". Saves time...


More Info
{"id":4716401819737,"title":"(2 Ea) 16in Lime Green Collection Backpk","handle":"2-ea-16in-lime-green-collection-backpk","description":"MPN: 006569\u003cbr\u003e\u003cbr\u003eUPC: 194629074020\u003cbr\u003eThis school bag features 2 compartments: the large compartment is great for larger items such as text book, binders, laptops, etc., while smaller compartment located in front is perfect for cell phones, keys, hand sanitizer and more. There are 2 zipper pulls for the large compartment, and 1 zipper pull for the smaller compartment. The 2 adjustable shoulder straps are nicely padded for comfort while carrying the backpack. There is a nylon handle on top of the backpack, convenient for hanging the backpack on hook outside of classrooms, or any hanger. Sold as a pack of 2 bags.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eOne large main compartment and small front compartment with zipper closureLightly padded, adjustable shoulder straps and carrying handleIdeal for schools, stadiums and travel\u003cbr\u003eSKU: ERSBAZ1034-2","published_at":"2024-10-18T08:09:41-04:00","created_at":"2020-09-10T04:22:42-04:00","vendor":"Bazic Products","type":"Teacher Aids","tags":["4+ years","600 D POLYESTER","Accessories","Lime Green"],"price":3285,"price_min":3285,"price_max":3285,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157589569625,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSBAZ1034-2","requires_shipping":true,"taxable":true,"featured_image":{"id":14726655606873,"product_id":4716401819737,"position":1,"created_at":"2020-09-10T04:22:42-04:00","updated_at":"2020-09-10T04:22:42-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1034-2.jpg?v=1599726162","variant_ids":[32157589569625]},"available":true,"name":"(2 Ea) 16in Lime Green Collection Backpk","public_title":null,"options":["Default Title"],"price":3285,"weight":590,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629074020","featured_media":{"alt":null,"id":6898243272793,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1034-2.jpg?v=1599726162"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1034-2.jpg?v=1599726162"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1034-2.jpg?v=1599726162","options":["Title"],"media":[{"alt":null,"id":6898243272793,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1034-2.jpg?v=1599726162"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1034-2.jpg?v=1599726162","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006569\u003cbr\u003e\u003cbr\u003eUPC: 194629074020\u003cbr\u003eThis school bag features 2 compartments: the large compartment is great for larger items such as text book, binders, laptops, etc., while smaller compartment located in front is perfect for cell phones, keys, hand sanitizer and more. There are 2 zipper pulls for the large compartment, and 1 zipper pull for the smaller compartment. The 2 adjustable shoulder straps are nicely padded for comfort while carrying the backpack. There is a nylon handle on top of the backpack, convenient for hanging the backpack on hook outside of classrooms, or any hanger. Sold as a pack of 2 bags.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eOne large main compartment and small front compartment with zipper closureLightly padded, adjustable shoulder straps and carrying handleIdeal for schools, stadiums and travel\u003cbr\u003eSKU: ERSBAZ1034-2"}
(2 Ea) 16in Lime Green Collection Backpk

(2 Ea) 16in Lime Green Collection Backpk

$32.85

MPN: 006569UPC: 194629074020This school bag features 2 compartments: the large compartment is great for larger items such as text book, binders, laptops, etc., while smaller compartment located in front is perfect for cell phones, keys, hand sanitizer and more. There are 2 zipper pulls for the large compartment, and 1 zipper pull for the smaller...


More Info
{"id":4716394676313,"title":"Parent Signature With Apple","handle":"parent-signature-with-apple","description":"MPN: 006588\u003cbr\u003e\u003cbr\u003eUPC: 085700043236\u003cbr\u003eThis stamp features a stack of books with an apple on top and a line for parent signature.\n\nHero Arts woodblock stamps offer long-lasting quality and precision in stamping. Each stamp features original designs. Our blocks originate from sustainably managed forests, and each is crafted from 100% natural rubber and is hand cut and assembled by us in the USA.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eWood block stamp with red rubberCrisp impressionHigh qualityWorks great with any ink\u003cbr\u003eSKU: ERSHOAD323","published_at":"2025-04-10T19:58:47-04:00","created_at":"2020-09-10T04:13:28-04:00","vendor":"Hero Arts","type":"Teacher Aids","tags":["3+ years","Multi","Rubber","Stamps \u0026 Stamp Pads","Wood"],"price":889,"price_min":889,"price_max":889,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157580394585,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSHOAD323","requires_shipping":true,"taxable":true,"featured_image":{"id":14726623952985,"product_id":4716394676313,"position":1,"created_at":"2020-09-10T04:13:28-04:00","updated_at":"2020-09-10T04:13:28-04:00","alt":null,"width":1600,"height":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOAD323.jpg?v=1599725608","variant_ids":[32157580394585]},"available":true,"name":"Parent Signature With Apple","public_title":null,"options":["Default Title"],"price":889,"weight":408,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"085700043236","featured_media":{"alt":null,"id":6898211618905,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOAD323.jpg?v=1599725608"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOAD323.jpg?v=1599725608"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOAD323.jpg?v=1599725608","options":["Title"],"media":[{"alt":null,"id":6898211618905,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOAD323.jpg?v=1599725608"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOAD323.jpg?v=1599725608","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006588\u003cbr\u003e\u003cbr\u003eUPC: 085700043236\u003cbr\u003eThis stamp features a stack of books with an apple on top and a line for parent signature.\n\nHero Arts woodblock stamps offer long-lasting quality and precision in stamping. Each stamp features original designs. Our blocks originate from sustainably managed forests, and each is crafted from 100% natural rubber and is hand cut and assembled by us in the USA.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eWood block stamp with red rubberCrisp impressionHigh qualityWorks great with any ink\u003cbr\u003eSKU: ERSHOAD323"}
Parent Signature With Apple

Parent Signature With Apple

$8.89

MPN: 006588UPC: 085700043236This stamp features a stack of books with an apple on top and a line for parent signature. Hero Arts woodblock stamps offer long-lasting quality and precision in stamping. Each stamp features original designs. Our blocks originate from sustainably managed forests, and each is crafted from 100% natural rubber and is h...


More Info
{"id":4716394053721,"title":"(3 Pk) Name Tent Happy Stars","handle":"3-pk-name-tent-happy-stars","description":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 194629055975\u003cbr\u003eThese tented name plates help teachers and substitute teachers learn students' names. Use them to label learning centers, storage areas, and portfolio collections. Laminate them for use as vocabulary flash cards or word bank labels. Giant size! 7\" x 11-1\/2\" folds to 3-1\/2\" x 11-1\/2\". Each pack includes 36 name plates. Sold as 3 packs for a total of 108 name plates.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eName plates help teachers and substitute teachers learn students' namesAcid-free per industry standardsLaminate them for use as vocabulary flash cards or work bank labels\u003cbr\u003eSKU: ERSTCR1941-3","published_at":"2023-08-23T11:24:28-04:00","created_at":"2020-09-10T04:12:31-04:00","vendor":"Teacher Created Resources","type":"Teacher Aids","tags":["3-7 years","Multi","Name Plates","Paper"],"price":4106,"price_min":4106,"price_max":4106,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157579444313,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSTCR1941-3","requires_shipping":true,"taxable":true,"featured_image":{"id":14726620741721,"product_id":4716394053721,"position":1,"created_at":"2020-09-10T04:12:32-04:00","updated_at":"2020-09-10T04:12:32-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR1941-3.jpg?v=1599725552","variant_ids":[32157579444313]},"available":true,"name":"(3 Pk) Name Tent Happy Stars","public_title":null,"options":["Default Title"],"price":4106,"weight":1107,"compare_at_price":null,"inventory_quantity":36,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629055975","featured_media":{"alt":null,"id":6898208407641,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR1941-3.jpg?v=1599725552"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR1941-3.jpg?v=1599725552"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR1941-3.jpg?v=1599725552","options":["Title"],"media":[{"alt":null,"id":6898208407641,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR1941-3.jpg?v=1599725552"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR1941-3.jpg?v=1599725552","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 194629055975\u003cbr\u003eThese tented name plates help teachers and substitute teachers learn students' names. Use them to label learning centers, storage areas, and portfolio collections. Laminate them for use as vocabulary flash cards or word bank labels. Giant size! 7\" x 11-1\/2\" folds to 3-1\/2\" x 11-1\/2\". Each pack includes 36 name plates. Sold as 3 packs for a total of 108 name plates.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eName plates help teachers and substitute teachers learn students' namesAcid-free per industry standardsLaminate them for use as vocabulary flash cards or work bank labels\u003cbr\u003eSKU: ERSTCR1941-3"}
(3 Pk) Name Tent Happy Stars

(3 Pk) Name Tent Happy Stars

$41.06

MPN: 005003UPC: 194629055975These tented name plates help teachers and substitute teachers learn students' names. Use them to label learning centers, storage areas, and portfolio collections. Laminate them for use as vocabulary flash cards or word bank labels. Giant size! 7" x 11-1/2" folds to 3-1/2" x 11-1/2". Each pack includes 36 name plates....


More Info
{"id":4716393496665,"title":"Mickey Mouse Clubhouse Name Plates","handle":"mickey-mouse-clubhouse-name-plates","description":"MPN: 005098\u003cbr\u003e\u003cbr\u003eUPC: 073168281727\u003cbr\u003eEureka Self-Adhesive Name Plates showcase more than a name! They provide helpful visual references for students, appropriate to grade level and also provide plenty of space for first and last names. They stick to almost any surface and can be removed easily. Name plates measure 9-5\/8\" x 3-1\/4\". Each pack includes 36 name plates.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eGreat for desks, cubby holes and More!Each name plate measures 9 5\/8 x 3 1\/4Removeable adhesive on the back36 per package\u003cbr\u003eSKU: ERSEU-833003","published_at":"2025-04-10T19:58:46-04:00","created_at":"2020-09-10T04:11:49-04:00","vendor":"Eureka","type":"Teacher Aids","tags":["2-8 years","Assorted","Name Plates","Paper"],"price":1232,"price_min":1232,"price_max":1232,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157577347161,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSEU-833003","requires_shipping":true,"taxable":true,"featured_image":{"id":14726617956441,"product_id":4716393496665,"position":1,"created_at":"2020-09-10T04:11:49-04:00","updated_at":"2020-09-10T04:11:49-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEU-833003.jpg?v=1599725509","variant_ids":[32157577347161]},"available":true,"name":"Mickey Mouse Clubhouse Name Plates","public_title":null,"options":["Default Title"],"price":1232,"weight":227,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"073168281727","featured_media":{"alt":null,"id":6898206212185,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEU-833003.jpg?v=1599725509"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEU-833003.jpg?v=1599725509"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEU-833003.jpg?v=1599725509","options":["Title"],"media":[{"alt":null,"id":6898206212185,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEU-833003.jpg?v=1599725509"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEU-833003.jpg?v=1599725509","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005098\u003cbr\u003e\u003cbr\u003eUPC: 073168281727\u003cbr\u003eEureka Self-Adhesive Name Plates showcase more than a name! They provide helpful visual references for students, appropriate to grade level and also provide plenty of space for first and last names. They stick to almost any surface and can be removed easily. Name plates measure 9-5\/8\" x 3-1\/4\". Each pack includes 36 name plates.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eGreat for desks, cubby holes and More!Each name plate measures 9 5\/8 x 3 1\/4Removeable adhesive on the back36 per package\u003cbr\u003eSKU: ERSEU-833003"}
Mickey Mouse Clubhouse Name Plates

Mickey Mouse Clubhouse Name Plates

$12.32

MPN: 005098UPC: 073168281727Eureka Self-Adhesive Name Plates showcase more than a name! They provide helpful visual references for students, appropriate to grade level and also provide plenty of space for first and last names. They stick to almost any surface and can be removed easily. Name plates measure 9-5/8" x 3-1/4". Each pack includes 36 n...


More Info
{"id":4716392120409,"title":"(3 Ea) Clear View Self Adhesive Pockets Library Pocket 3 1-2 X 5","handle":"3-ea-clear-view-self-adhesive-pockets-library-pocket-3-1-2-x-5","description":"MPN: 006273\u003cbr\u003e\u003cbr\u003eUPC: 194629055135\u003cbr\u003eThese pockets seal at end and remove easily from desk. Self-adhesive and heavy duty. Open pocket, slip in card, remove backing, position pocket and stick! Each pocket measures 3.5\" tall by 5\" wide. Each pack includes 25 pockets. Sold as a set of 3 packs, 75 pockets total.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eClear layer displays entire nameplate without obstructing its visibilitySelf-adhesive\/heavy dutyOpen pocket, slip in nameplate, remove backing, position pocket and stickSeals on both endsRemoves easily from desk3.5\" tall by 5\" wide\u003cbr\u003eSKU: ERSASH10408-3","published_at":"2025-04-15T00:44:37-04:00","created_at":"2020-09-10T04:10:47-04:00","vendor":"Ashley Productions","type":"Teacher Aids","tags":["5+ years","adhesive","Clear","Library Cards","Plastic"],"price":2873,"price_min":2873,"price_max":2873,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157575381081,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSASH10408-3","requires_shipping":true,"taxable":true,"featured_image":{"id":14726614319193,"product_id":4716392120409,"position":1,"created_at":"2020-09-10T04:10:47-04:00","updated_at":"2020-09-10T04:10:47-04:00","alt":null,"width":2000,"height":2000,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH10408-3.jpg?v=1599725447","variant_ids":[32157575381081]},"available":true,"name":"(3 Ea) Clear View Self Adhesive Pockets Library Pocket 3 1-2 X 5","public_title":null,"options":["Default Title"],"price":2873,"weight":1361,"compare_at_price":null,"inventory_quantity":40,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629055135","featured_media":{"alt":null,"id":6898201985113,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2000,"width":2000,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH10408-3.jpg?v=1599725447"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH10408-3.jpg?v=1599725447"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH10408-3.jpg?v=1599725447","options":["Title"],"media":[{"alt":null,"id":6898201985113,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2000,"width":2000,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH10408-3.jpg?v=1599725447"},"aspect_ratio":1.0,"height":2000,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSASH10408-3.jpg?v=1599725447","width":2000}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006273\u003cbr\u003e\u003cbr\u003eUPC: 194629055135\u003cbr\u003eThese pockets seal at end and remove easily from desk. Self-adhesive and heavy duty. Open pocket, slip in card, remove backing, position pocket and stick! Each pocket measures 3.5\" tall by 5\" wide. Each pack includes 25 pockets. Sold as a set of 3 packs, 75 pockets total.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eClear layer displays entire nameplate without obstructing its visibilitySelf-adhesive\/heavy dutyOpen pocket, slip in nameplate, remove backing, position pocket and stickSeals on both endsRemoves easily from desk3.5\" tall by 5\" wide\u003cbr\u003eSKU: ERSASH10408-3"}
(3 Ea) Clear View Self Adhesive Pockets Library Pocket 3 1-2 X 5

(3 Ea) Clear View Self Adhesive Pockets Library Pocket 3 1-2 X 5

$28.73

MPN: 006273UPC: 194629055135These pockets seal at end and remove easily from desk. Self-adhesive and heavy duty. Open pocket, slip in card, remove backing, position pocket and stick! Each pocket measures 3.5" tall by 5" wide. Each pack includes 25 pockets. Sold as a set of 3 packs, 75 pockets total.Key Features : Clear layer displays entire name...


More Info
{"id":4716389105753,"title":"(6 Pk) Pete The Cat Lanyard","handle":"6-pk-pete-the-cat-lanyard","description":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 194629102174\u003cbr\u003eKeep your ID handy with these stylish and durable lanyards. These lanyards feature a strong plastic clip for easy removal as well as a metal ring and metal swivel clasp to securely hold your keys, ID badge, or anything you want to have close by. The soft fabric is comfortable to wear and comes in a variety of fun styles. Measures 21-3\/4\" long x 3\/4\" wide. Pack of 6 lanyards.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eLanyards feature a strong plastic clip for easy removalA metal ring and metal swivel clasp to securely hold your keys, ID badge, or anything you want to have close byThe soft fabric is comfortable to wear and comes in a variety of fun stylesMeasures 21-3\/4\" long x 3\/4\" widePack of 6 lanyards\u003cbr\u003eSKU: ERSEP-60257-6","published_at":"2022-05-05T22:21:57-04:00","created_at":"2020-09-10T04:08:07-04:00","vendor":"Teacher Created Resources","type":"Teacher Aids","tags":["5+ years","Accessories","Fabric","Metal","Multi","Plastic"],"price":4102,"price_min":4102,"price_max":4102,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157571612761,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSEP-60257-6","requires_shipping":true,"taxable":true,"featured_image":{"id":14726604357721,"product_id":4716389105753,"position":1,"created_at":"2020-09-10T04:08:07-04:00","updated_at":"2020-09-10T04:08:07-04:00","alt":null,"width":1600,"height":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEP-60257-6.jpg?v=1599725287","variant_ids":[32157571612761]},"available":true,"name":"(6 Pk) Pete The Cat Lanyard","public_title":null,"options":["Default Title"],"price":4102,"weight":163,"compare_at_price":null,"inventory_quantity":13,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629102174","featured_media":{"alt":null,"id":6898192023641,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEP-60257-6.jpg?v=1599725287"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEP-60257-6.jpg?v=1599725287"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEP-60257-6.jpg?v=1599725287","options":["Title"],"media":[{"alt":null,"id":6898192023641,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEP-60257-6.jpg?v=1599725287"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEP-60257-6.jpg?v=1599725287","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 194629102174\u003cbr\u003eKeep your ID handy with these stylish and durable lanyards. These lanyards feature a strong plastic clip for easy removal as well as a metal ring and metal swivel clasp to securely hold your keys, ID badge, or anything you want to have close by. The soft fabric is comfortable to wear and comes in a variety of fun styles. Measures 21-3\/4\" long x 3\/4\" wide. Pack of 6 lanyards.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eLanyards feature a strong plastic clip for easy removalA metal ring and metal swivel clasp to securely hold your keys, ID badge, or anything you want to have close byThe soft fabric is comfortable to wear and comes in a variety of fun stylesMeasures 21-3\/4\" long x 3\/4\" widePack of 6 lanyards\u003cbr\u003eSKU: ERSEP-60257-6"}
(6 Pk) Pete The Cat Lanyard

(6 Pk) Pete The Cat Lanyard

$41.02

MPN: 005003UPC: 194629102174Keep your ID handy with these stylish and durable lanyards. These lanyards feature a strong plastic clip for easy removal as well as a metal ring and metal swivel clasp to securely hold your keys, ID badge, or anything you want to have close by. The soft fabric is comfortable to wear and comes in a variety of fun styl...


More Info
{"id":4716387172441,"title":"(6 Pk) Pre Kindergarten Progress Report 10 Per Pk For 3 Year Olds","handle":"6-pk-pre-kindergarten-progress-report-10-per-pk-for-3-year-olds","description":"MPN: 005473\u003cbr\u003e\u003cbr\u003eUPC: 194629059317\u003cbr\u003ePre-Kindergarten Progress Reports designed for 3 year olds provide a detailed listing of achievements in various curriculum areas.\n\nColorful, easy-to-read reports help parents appreciate the progress their children have made. Areas include social and emotional skills, work habits, fine motor skills, gross motor skills, reading and math readiness, body parts, listening and speaking skills, self-reliance skills, music skills, and art skills. Reports are 2 sided, full-color tri-fold sheets. Closed reports measure 5\" x 8\". Each pack includes 10 reports. Sold as 6 packs for a total of 60 reports.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eThese progress reports provide a detailed listing of achievements for the pre-kindergarten year in various curriculum areas.Help parents appreciate the progress their children have made.Stay Up To DateFor Age 3.\u003cbr\u003eSKU: ERSH-PRC11-6","published_at":"2025-02-03T09:35:21-05:00","created_at":"2020-09-10T04:05:13-04:00","vendor":"Flipside","type":"Teacher Aids","tags":["3+ years","Multi","Paper","Progress Notices"],"price":4537,"price_min":4537,"price_max":4537,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157569777753,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSH-PRC11-6","requires_shipping":true,"taxable":true,"featured_image":{"id":14726596231257,"product_id":4716387172441,"position":1,"created_at":"2020-09-10T04:05:13-04:00","updated_at":"2020-09-10T04:05:13-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSH-PRC11-6.jpg?v=1599725113","variant_ids":[32157569777753]},"available":true,"name":"(6 Pk) Pre Kindergarten Progress Report 10 Per Pk For 3 Year Olds","public_title":null,"options":["Default Title"],"price":4537,"weight":680,"compare_at_price":null,"inventory_quantity":8,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629059317","featured_media":{"alt":null,"id":6898183897177,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSH-PRC11-6.jpg?v=1599725113"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSH-PRC11-6.jpg?v=1599725113"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSH-PRC11-6.jpg?v=1599725113","options":["Title"],"media":[{"alt":null,"id":6898183897177,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSH-PRC11-6.jpg?v=1599725113"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSH-PRC11-6.jpg?v=1599725113","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005473\u003cbr\u003e\u003cbr\u003eUPC: 194629059317\u003cbr\u003ePre-Kindergarten Progress Reports designed for 3 year olds provide a detailed listing of achievements in various curriculum areas.\n\nColorful, easy-to-read reports help parents appreciate the progress their children have made. Areas include social and emotional skills, work habits, fine motor skills, gross motor skills, reading and math readiness, body parts, listening and speaking skills, self-reliance skills, music skills, and art skills. Reports are 2 sided, full-color tri-fold sheets. Closed reports measure 5\" x 8\". Each pack includes 10 reports. Sold as 6 packs for a total of 60 reports.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eThese progress reports provide a detailed listing of achievements for the pre-kindergarten year in various curriculum areas.Help parents appreciate the progress their children have made.Stay Up To DateFor Age 3.\u003cbr\u003eSKU: ERSH-PRC11-6"}
(6 Pk) Pre Kindergarten Progress Report 10 Per Pk For 3 Year Olds

(6 Pk) Pre Kindergarten Progress Report 10 Per Pk For 3 Year Olds

$45.37

MPN: 005473UPC: 194629059317Pre-Kindergarten Progress Reports designed for 3 year olds provide a detailed listing of achievements in various curriculum areas. Colorful, easy-to-read reports help parents appreciate the progress their children have made. Areas include social and emotional skills, work habits, fine motor skills, gross motor skills...


More Info
{"id":4716385304665,"title":"Ready2learn Uppercase Alphabet Stampers","handle":"ready2learn-uppercase-alphabet-stampers","description":"MPN: 005646\u003cbr\u003e\u003cbr\u003eUPC: 734653030083\u003cbr\u003eCreate literacy lessons and decorate DIY projects with these Giant Uppercase Alphabet Stampers! This 28-piece set includes 28 different alphabet-themed stamps: uppercase letters A-Z, Ñ and question mark. Each stamp features a large foam shape mounted on a 3\" disc for stability. The chunky, rounded handles provide greater comfort and control. Ideal for DIY projects and art and craft time, these giant stampers assist in developing fine motor skills and creativity. Size: 1.9\"H x 3\" dia.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eLet's get learn the alphabet! This set includes 28 giant stampers with foam shapes of uppercase letters A-Z, Ñ and question mark.Giant Stampers have round, easy grip handles which nest comfortably in small hands. The foam imprints are mounted on a clear 3\" disc, which protects little hands from paint and ink.Each stamp has directional arrows on the transparent plastic discs for perfect image alignment every time! The stamps are also labeled for quick identification.Have an art project? There's a stamp for that! Use these stampers with ink or paint to decorate posters, signs and other DIY projects.Ideal for use with paint or ink pads\u003cbr\u003eSKU: ERSCE-6711","published_at":"2024-08-22T11:36:27-04:00","created_at":"2020-09-10T04:02:37-04:00","vendor":"Learning Advantage","type":"Teacher Aids","tags":["3+ years","Foam","Plastic","Red","Stamps \u0026 Stamp Pads"],"price":5205,"price_min":5205,"price_max":5205,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157566730329,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCE-6711","requires_shipping":true,"taxable":true,"featured_image":{"id":14726584860761,"product_id":4716385304665,"position":1,"created_at":"2020-09-10T04:02:37-04:00","updated_at":"2020-09-10T04:02:37-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6711.jpg?v=1599724957","variant_ids":[32157566730329]},"available":true,"name":"Ready2learn Uppercase Alphabet Stampers","public_title":null,"options":["Default Title"],"price":5205,"weight":1247,"compare_at_price":null,"inventory_quantity":21,"inventory_management":"shopify","inventory_policy":"deny","barcode":"734653030083","featured_media":{"alt":null,"id":6898172526681,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6711.jpg?v=1599724957"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6711.jpg?v=1599724957","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6711_1.jpg?v=1599724960"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6711.jpg?v=1599724957","options":["Title"],"media":[{"alt":null,"id":6898172526681,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6711.jpg?v=1599724957"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6711.jpg?v=1599724957","width":1500},{"alt":null,"id":6898173050969,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6711_1.jpg?v=1599724960"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6711_1.jpg?v=1599724960","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005646\u003cbr\u003e\u003cbr\u003eUPC: 734653030083\u003cbr\u003eCreate literacy lessons and decorate DIY projects with these Giant Uppercase Alphabet Stampers! This 28-piece set includes 28 different alphabet-themed stamps: uppercase letters A-Z, Ñ and question mark. Each stamp features a large foam shape mounted on a 3\" disc for stability. The chunky, rounded handles provide greater comfort and control. Ideal for DIY projects and art and craft time, these giant stampers assist in developing fine motor skills and creativity. Size: 1.9\"H x 3\" dia.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eLet's get learn the alphabet! This set includes 28 giant stampers with foam shapes of uppercase letters A-Z, Ñ and question mark.Giant Stampers have round, easy grip handles which nest comfortably in small hands. The foam imprints are mounted on a clear 3\" disc, which protects little hands from paint and ink.Each stamp has directional arrows on the transparent plastic discs for perfect image alignment every time! The stamps are also labeled for quick identification.Have an art project? There's a stamp for that! Use these stampers with ink or paint to decorate posters, signs and other DIY projects.Ideal for use with paint or ink pads\u003cbr\u003eSKU: ERSCE-6711"}
Ready2learn Uppercase Alphabet Stampers

Ready2learn Uppercase Alphabet Stampers

$52.05

MPN: 005646UPC: 734653030083Create literacy lessons and decorate DIY projects with these Giant Uppercase Alphabet Stampers! This 28-piece set includes 28 different alphabet-themed stamps: uppercase letters A-Z, Ñ and question mark. Each stamp features a large foam shape mounted on a 3" disc for stability. The chunky, rounded handles provide grea...


More Info
{"id":4716385271897,"title":"Ready2learn Lowercase Alphabet Stampers","handle":"ready2learn-lowercase-alphabet-stampers","description":"MPN: 005646\u003cbr\u003e\u003cbr\u003eUPC: 734653030090\u003cbr\u003eCreate literacy lessons and decorate DIY projects with these Giant Lowercase Alphabet Stampers! This 28-piece set includes 28 different alphabet-themed stamps: lowercase letters a-z, ñ and a question mark. Each stamp features a large foam shape mounted on a 3\" disc for stability. The chunky, rounded handles provide greater comfort and control. Ideal for DIY projects and art and craft time, these giant stampers assist in developing fine motor skills and creativity. Size: 1.9\"H x 3\" dia.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eLet's get learn the alphabet! This set includes 28 giant stampers with foam shapes of uppercase letters A-Z, Ñ and question mark.Giant Stampers have round, easy grip handles which nest comfortably in small hands. The foam imprints are mounted on a clear 3\" disc, which protects little hands from paint and ink.Each stamp has directional arrows on the transparent plastic discs for perfect image alignment every time! The stamps are also labeled for quick identification.Have an art project? There's a stamp for that! Use these stampers with ink or paint to decorate posters, signs and other DIY projects.Ideal for use with paint or ink pads\u003cbr\u003eSKU: ERSCE-6712","published_at":"2024-08-28T07:30:26-04:00","created_at":"2020-09-10T04:02:33-04:00","vendor":"Learning Advantage","type":"Teacher Aids","tags":["3+ years","Foam","Lime Green","Plastic","Stamps \u0026 Stamp Pads"],"price":5205,"price_min":5205,"price_max":5205,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157566697561,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCE-6712","requires_shipping":true,"taxable":true,"featured_image":{"id":14726584664153,"product_id":4716385271897,"position":1,"created_at":"2020-09-10T04:02:33-04:00","updated_at":"2020-09-10T04:02:33-04:00","alt":null,"width":1600,"height":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6712.jpg?v=1599724953","variant_ids":[32157566697561]},"available":true,"name":"Ready2learn Lowercase Alphabet Stampers","public_title":null,"options":["Default Title"],"price":5205,"weight":1270,"compare_at_price":null,"inventory_quantity":21,"inventory_management":"shopify","inventory_policy":"deny","barcode":"734653030090","featured_media":{"alt":null,"id":6898172330073,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6712.jpg?v=1599724953"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6712.jpg?v=1599724953","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6712_1.jpg?v=1599724956"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6712.jpg?v=1599724953","options":["Title"],"media":[{"alt":null,"id":6898172330073,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6712.jpg?v=1599724953"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6712.jpg?v=1599724953","width":1600},{"alt":null,"id":6898172493913,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6712_1.jpg?v=1599724956"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6712_1.jpg?v=1599724956","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005646\u003cbr\u003e\u003cbr\u003eUPC: 734653030090\u003cbr\u003eCreate literacy lessons and decorate DIY projects with these Giant Lowercase Alphabet Stampers! This 28-piece set includes 28 different alphabet-themed stamps: lowercase letters a-z, ñ and a question mark. Each stamp features a large foam shape mounted on a 3\" disc for stability. The chunky, rounded handles provide greater comfort and control. Ideal for DIY projects and art and craft time, these giant stampers assist in developing fine motor skills and creativity. Size: 1.9\"H x 3\" dia.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eLet's get learn the alphabet! This set includes 28 giant stampers with foam shapes of uppercase letters A-Z, Ñ and question mark.Giant Stampers have round, easy grip handles which nest comfortably in small hands. The foam imprints are mounted on a clear 3\" disc, which protects little hands from paint and ink.Each stamp has directional arrows on the transparent plastic discs for perfect image alignment every time! The stamps are also labeled for quick identification.Have an art project? There's a stamp for that! Use these stampers with ink or paint to decorate posters, signs and other DIY projects.Ideal for use with paint or ink pads\u003cbr\u003eSKU: ERSCE-6712"}
Ready2learn Lowercase Alphabet Stampers

Ready2learn Lowercase Alphabet Stampers

$52.05

MPN: 005646UPC: 734653030090Create literacy lessons and decorate DIY projects with these Giant Lowercase Alphabet Stampers! This 28-piece set includes 28 different alphabet-themed stamps: lowercase letters a-z, ñ and a question mark. Each stamp features a large foam shape mounted on a 3" disc for stability. The chunky, rounded handles provide gr...


More Info
{"id":4716385075289,"title":"Ready2learn Giant Alphabet Letters Stampers Set Includes Ce-6711\u00266712","handle":"ready2learn-giant-alphabet-letters-stampers-set-includes-ce-6711-6712","description":"MPN: 005646\u003cbr\u003e\u003cbr\u003eUPC: 734653030472\u003cbr\u003eCreate literacy lessons and decorate DIY projects with these Giant Uppercase \u0026amp; Lowercase Alphabet Stampers! This 56-piece set includes 56 different alphabet-themed stamps: lowercase letters a-z, uppercase letters A-Z, ñ, Ñ, question mark and exclamation mark. Each stamp features a large foam shape mounted on a 3\" disc for stability. The chunky, rounded handles provide greater comfort and control. Ideal for DIY projects and art and craft time, these giant stampers assist in developing fine motor skills and creativity. Size: 1.9\"H x 3\" dia.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eLet's get learn the alphabet! This set includes 28 giant stampers with foam shapes of uppercase letters A-Z, Ñ and question mark.Giant Stampers have round, easy grip handles which nest comfortably in small hands. The foam imprints are mounted on a clear 3\" disc, which protects little hands from paint and ink.Each stamp has directional arrows on the transparent plastic discs for perfect image alignment every time! The stamps are also labeled for quick identification.Have an art project? There's a stamp for that! Use these stampers with ink or paint to decorate posters, signs and other DIY projects.\u003cbr\u003eSKU: ERSCE-6713","published_at":"2023-08-07T18:59:17-04:00","created_at":"2020-09-10T04:02:15-04:00","vendor":"Learning Advantage","type":"Teacher Aids","tags":["3+ years","Foam","Green","Plastic","Red","Stamps \u0026 Stamp Pads"],"price":9041,"price_min":9041,"price_max":9041,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157566533721,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCE-6713","requires_shipping":true,"taxable":true,"featured_image":{"id":14726583091289,"product_id":4716385075289,"position":1,"created_at":"2020-09-10T04:02:15-04:00","updated_at":"2020-09-10T04:02:15-04:00","alt":null,"width":1700,"height":1700,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6713.jpg?v=1599724935","variant_ids":[32157566533721]},"available":true,"name":"Ready2learn Giant Alphabet Letters Stampers Set Includes Ce-6711\u00266712","public_title":null,"options":["Default Title"],"price":9041,"weight":2563,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"734653030472","featured_media":{"alt":null,"id":6898170757209,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1700,"width":1700,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6713.jpg?v=1599724935"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6713.jpg?v=1599724935","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6713_2.jpg?v=1599724937","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6713_1.jpg?v=1599724938"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6713.jpg?v=1599724935","options":["Title"],"media":[{"alt":null,"id":6898170757209,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1700,"width":1700,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6713.jpg?v=1599724935"},"aspect_ratio":1.0,"height":1700,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6713.jpg?v=1599724935","width":1700},{"alt":null,"id":6898171084889,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6713_2.jpg?v=1599724937"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6713_2.jpg?v=1599724937","width":1600},{"alt":null,"id":6898171248729,"position":3,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6713_1.jpg?v=1599724938"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6713_1.jpg?v=1599724938","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005646\u003cbr\u003e\u003cbr\u003eUPC: 734653030472\u003cbr\u003eCreate literacy lessons and decorate DIY projects with these Giant Uppercase \u0026amp; Lowercase Alphabet Stampers! This 56-piece set includes 56 different alphabet-themed stamps: lowercase letters a-z, uppercase letters A-Z, ñ, Ñ, question mark and exclamation mark. Each stamp features a large foam shape mounted on a 3\" disc for stability. The chunky, rounded handles provide greater comfort and control. Ideal for DIY projects and art and craft time, these giant stampers assist in developing fine motor skills and creativity. Size: 1.9\"H x 3\" dia.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eLet's get learn the alphabet! This set includes 28 giant stampers with foam shapes of uppercase letters A-Z, Ñ and question mark.Giant Stampers have round, easy grip handles which nest comfortably in small hands. The foam imprints are mounted on a clear 3\" disc, which protects little hands from paint and ink.Each stamp has directional arrows on the transparent plastic discs for perfect image alignment every time! The stamps are also labeled for quick identification.Have an art project? There's a stamp for that! Use these stampers with ink or paint to decorate posters, signs and other DIY projects.\u003cbr\u003eSKU: ERSCE-6713"}
Ready2learn Giant Alphabet Letters Stampers Set Includes Ce-6711&6712

Ready2learn Giant Alphabet Letters Stampers Set Includes Ce-6711&6712

$90.41

MPN: 005646UPC: 734653030472Create literacy lessons and decorate DIY projects with these Giant Uppercase & Lowercase Alphabet Stampers! This 56-piece set includes 56 different alphabet-themed stamps: lowercase letters a-z, uppercase letters A-Z, ñ, Ñ, question mark and exclamation mark. Each stamp features a large foam shape mounted on a 3" ...


More Info
{"id":4716383305817,"title":"Ready2learn Giant 10-pk Outline Geometric Shapes","handle":"ready2learn-giant-10-pk-outline-geometric-shapes","description":"MPN: 005646\u003cbr\u003e\u003cbr\u003eUPC: 734653030571\u003cbr\u003eCreate lessons and decorate DIY projects with these Giant Geometric Shape Stampers! This 10-piece set includes 10 different geometry-themed outlines: a hexagon, circle, rectangle, square, triangle, rhombus, octagon, trapezoid, pentagon and kite. Each stamp features a large foam shape mounted on a 3\" disc for stability. The chunky, rounded handles provide greater comfort and control. Ideal for DIY projects and art and craft time, these giant stampers assist in developing fine motor skills and creativity. Size: 1.9\"H x 3\" dia.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eLet's get learn the alphabet! This set includes 28 giant stampers with foam shapes of uppercase letters A-Z, Ñ and question mark.Giant Stampers have round, easy grip handles which nest comfortably in small hands. The foam imprints are mounted on a clear 3\" disc, which protects little hands from paint and ink.Each stamp has directional arrows on the transparent plastic discs for perfect image alignment every time! The stamps are also labeled for quick identification.Have an art project? There's a stamp for that! Use these stampers with ink or paint to decorate posters, signs and other DIY projects.Ideal for use with paint or ink pads\u003cbr\u003eSKU: ERSCE-6736","published_at":"2025-04-03T04:49:56-04:00","created_at":"2020-09-10T03:59:41-04:00","vendor":"Learning Advantage","type":"Teacher Aids","tags":["3+ years","Foam","Multi","Plastic","Stamps \u0026 Stamp Pads"],"price":2328,"price_min":2328,"price_max":2328,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157563420761,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCE-6736","requires_shipping":true,"taxable":true,"featured_image":{"id":14726572376153,"product_id":4716383305817,"position":1,"created_at":"2020-09-10T03:59:41-04:00","updated_at":"2020-09-10T03:59:41-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6736.jpg?v=1599724781","variant_ids":[32157563420761]},"available":true,"name":"Ready2learn Giant 10-pk Outline Geometric Shapes","public_title":null,"options":["Default Title"],"price":2328,"weight":408,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"734653030571","featured_media":{"alt":null,"id":6898160042073,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6736.jpg?v=1599724781"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6736.jpg?v=1599724781","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6736_1.jpg?v=1599724784"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6736.jpg?v=1599724781","options":["Title"],"media":[{"alt":null,"id":6898160042073,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6736.jpg?v=1599724781"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6736.jpg?v=1599724781","width":2100},{"alt":null,"id":6898160173145,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6736_1.jpg?v=1599724784"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6736_1.jpg?v=1599724784","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005646\u003cbr\u003e\u003cbr\u003eUPC: 734653030571\u003cbr\u003eCreate lessons and decorate DIY projects with these Giant Geometric Shape Stampers! This 10-piece set includes 10 different geometry-themed outlines: a hexagon, circle, rectangle, square, triangle, rhombus, octagon, trapezoid, pentagon and kite. Each stamp features a large foam shape mounted on a 3\" disc for stability. The chunky, rounded handles provide greater comfort and control. Ideal for DIY projects and art and craft time, these giant stampers assist in developing fine motor skills and creativity. Size: 1.9\"H x 3\" dia.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eLet's get learn the alphabet! This set includes 28 giant stampers with foam shapes of uppercase letters A-Z, Ñ and question mark.Giant Stampers have round, easy grip handles which nest comfortably in small hands. The foam imprints are mounted on a clear 3\" disc, which protects little hands from paint and ink.Each stamp has directional arrows on the transparent plastic discs for perfect image alignment every time! The stamps are also labeled for quick identification.Have an art project? There's a stamp for that! Use these stampers with ink or paint to decorate posters, signs and other DIY projects.Ideal for use with paint or ink pads\u003cbr\u003eSKU: ERSCE-6736"}
Ready2learn Giant 10-pk Outline Geometric Shapes

Ready2learn Giant 10-pk Outline Geometric Shapes

$23.28

MPN: 005646UPC: 734653030571Create lessons and decorate DIY projects with these Giant Geometric Shape Stampers! This 10-piece set includes 10 different geometry-themed outlines: a hexagon, circle, rectangle, square, triangle, rhombus, octagon, trapezoid, pentagon and kite. Each stamp features a large foam shape mounted on a 3" disc for stabilit...


More Info
{"id":4716381175897,"title":"(2 Ea) 16in Green Basic Collection Backpk","handle":"2-ea-16in-green-basic-collection-backpk","description":"MPN: 006569\u003cbr\u003e\u003cbr\u003eUPC: 194629074013\u003cbr\u003eThis school bag features 2 compartments: the large compartment is great for larger items such as text book, binders, laptops, etc., while smaller compartment located in front is perfect for cell phones, keys, hand sanitizer and more. There are 2 zipper pulls for the large compartment, and 1 zipper pull for the smaller compartment. The 2 adjustable shoulder straps are nicely padded for comfort while carrying the backpack. There is a nylon handle on top of the backpack, convenient for hanging the backpack on hook outside of classrooms, or any hanger. Sold as a pack of 2 bags.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eOne large main compartment and small front compartment with zipper closureLightly padded, adjustable shoulder straps and carrying handleIdeal for schools, stadiums and travel\u003cbr\u003eSKU: ERSBAZ1033-2","published_at":"2024-02-15T07:55:35-05:00","created_at":"2020-09-10T03:56:58-04:00","vendor":"Bazic Products","type":"Teacher Aids","tags":["4+ years","600 D POLYESTER","Accessories","Green"],"price":3285,"price_min":3285,"price_max":3285,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157560242265,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSBAZ1033-2","requires_shipping":true,"taxable":true,"featured_image":{"id":14726560677977,"product_id":4716381175897,"position":1,"created_at":"2020-09-10T03:56:58-04:00","updated_at":"2020-09-10T03:56:58-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1033-2.jpg?v=1599724618","variant_ids":[32157560242265]},"available":true,"name":"(2 Ea) 16in Green Basic Collection Backpk","public_title":null,"options":["Default Title"],"price":3285,"weight":590,"compare_at_price":null,"inventory_quantity":41,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629074013","featured_media":{"alt":null,"id":6898148343897,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1033-2.jpg?v=1599724618"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1033-2.jpg?v=1599724618"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1033-2.jpg?v=1599724618","options":["Title"],"media":[{"alt":null,"id":6898148343897,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1033-2.jpg?v=1599724618"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1033-2.jpg?v=1599724618","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006569\u003cbr\u003e\u003cbr\u003eUPC: 194629074013\u003cbr\u003eThis school bag features 2 compartments: the large compartment is great for larger items such as text book, binders, laptops, etc., while smaller compartment located in front is perfect for cell phones, keys, hand sanitizer and more. There are 2 zipper pulls for the large compartment, and 1 zipper pull for the smaller compartment. The 2 adjustable shoulder straps are nicely padded for comfort while carrying the backpack. There is a nylon handle on top of the backpack, convenient for hanging the backpack on hook outside of classrooms, or any hanger. Sold as a pack of 2 bags.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eOne large main compartment and small front compartment with zipper closureLightly padded, adjustable shoulder straps and carrying handleIdeal for schools, stadiums and travel\u003cbr\u003eSKU: ERSBAZ1033-2"}
(2 Ea) 16in Green Basic Collection Backpk

(2 Ea) 16in Green Basic Collection Backpk

$32.85

MPN: 006569UPC: 194629074013This school bag features 2 compartments: the large compartment is great for larger items such as text book, binders, laptops, etc., while smaller compartment located in front is perfect for cell phones, keys, hand sanitizer and more. There are 2 zipper pulls for the large compartment, and 1 zipper pull for the smaller...


More Info
{"id":4716377276505,"title":"(6 Pk) Owl Stars Desk Toppers Name Plates Variety Pk","handle":"6-pk-owl-stars-desk-toppers-name-plates-variety-pk-1","description":"MPN: 005089\u003cbr\u003e\u003cbr\u003eUPC: 194629056552\u003cbr\u003eWonderfully whimsical designs delight and provide a wide range of labeling options, everything from showcasing names to delivering fun messages. Perfect for labeling desks and lockers, plus four designs per pack make it easy to group students. Guidelines on name plates for printing and writing practice. 4 designs, 32 per pack, 2.875\" x 9.5\". Sold as 6 packs for a total of 192 name plates. Coordinates with Owl-Stars! Collection.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eRecognize each student with versatile name plates. Four designs per pack make grouping easy.Also great for use as labels, locker tags, and hall passes. Sized right for word walls.Guidelines included for printing and cursive practice. Designs coordinate with other TREND décor.Measures 2.875\" x 9.5\" each.4 designs, single-sided; 32 per pack. Sold as 6 packs, 192 names plates total.\u003cbr\u003eSKU: ERST-69910-6","published_at":"2023-08-04T08:15:20-04:00","created_at":"2020-09-10T03:51:52-04:00","vendor":"Trend Enterprises Inc.","type":"Teacher Aids","tags":["4-12 years","Multi","Name Plates","Paper"],"price":4924,"price_min":4924,"price_max":4924,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157556179033,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERST-69910-6","requires_shipping":true,"taxable":true,"featured_image":{"id":14726537740377,"product_id":4716377276505,"position":1,"created_at":"2020-09-10T03:51:52-04:00","updated_at":"2020-09-10T03:51:52-04:00","alt":null,"width":1600,"height":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERST-69910-6.jpg?v=1599724312","variant_ids":[32157556179033]},"available":true,"name":"(6 Pk) Owl Stars Desk Toppers Name Plates Variety Pk","public_title":null,"options":["Default Title"],"price":4924,"weight":762,"compare_at_price":null,"inventory_quantity":22,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629056552","featured_media":{"alt":null,"id":6898125406297,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERST-69910-6.jpg?v=1599724312"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERST-69910-6.jpg?v=1599724312"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERST-69910-6.jpg?v=1599724312","options":["Title"],"media":[{"alt":null,"id":6898125406297,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERST-69910-6.jpg?v=1599724312"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERST-69910-6.jpg?v=1599724312","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005089\u003cbr\u003e\u003cbr\u003eUPC: 194629056552\u003cbr\u003eWonderfully whimsical designs delight and provide a wide range of labeling options, everything from showcasing names to delivering fun messages. Perfect for labeling desks and lockers, plus four designs per pack make it easy to group students. Guidelines on name plates for printing and writing practice. 4 designs, 32 per pack, 2.875\" x 9.5\". Sold as 6 packs for a total of 192 name plates. Coordinates with Owl-Stars! Collection.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eRecognize each student with versatile name plates. Four designs per pack make grouping easy.Also great for use as labels, locker tags, and hall passes. Sized right for word walls.Guidelines included for printing and cursive practice. Designs coordinate with other TREND décor.Measures 2.875\" x 9.5\" each.4 designs, single-sided; 32 per pack. Sold as 6 packs, 192 names plates total.\u003cbr\u003eSKU: ERST-69910-6"}
(6 Pk) Owl Stars Desk Toppers Name Plates Variety Pk

(6 Pk) Owl Stars Desk Toppers Name Plates Variety Pk

$49.24

MPN: 005089UPC: 194629056552Wonderfully whimsical designs delight and provide a wide range of labeling options, everything from showcasing names to delivering fun messages. Perfect for labeling desks and lockers, plus four designs per pack make it easy to group students. Guidelines on name plates for printing and writing practice. 4 designs, 32 ...


More Info
{"id":4716374622297,"title":"(12 Ea) Stamp Pad Violet","handle":"12-ea-stamp-pad-violet","description":"MPN: 006092\u003cbr\u003e\u003cbr\u003eUPC: 194629082100\u003cbr\u003eThick foam pads provide clean, crisp impressions. Packed in hinged casings made of sturdy plastic. Each pad is individually shrink wrapped. Re-inkable. Non-toxic inks. Sold as a pack of 12 stamp pads.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eThese thick foam pads provide clean, crisp impressions every time!Thick foam pads provide clean, crisp impressions.Packed in hinged casings made of sturdy plastic.Each pad is individually shrink wrapped.\u003cbr\u003eSKU: ERSCHL92260-12","published_at":"2023-06-27T07:12:20-04:00","created_at":"2020-09-10T03:48:39-04:00","vendor":"Charles Leonard","type":"Teacher Aids","tags":["8+ years","Foam","Ink","Plastic","Purple","Stamps \u0026 Stamp Pads"],"price":4077,"price_min":4077,"price_max":4077,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157553197145,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCHL92260-12","requires_shipping":true,"taxable":true,"featured_image":{"id":14726523027545,"product_id":4716374622297,"position":1,"created_at":"2020-09-10T03:48:39-04:00","updated_at":"2020-09-10T03:48:39-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL92260-12.jpg?v=1599724119","variant_ids":[32157553197145]},"available":true,"name":"(12 Ea) Stamp Pad Violet","public_title":null,"options":["Default Title"],"price":4077,"weight":608,"compare_at_price":null,"inventory_quantity":11,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629082100","featured_media":{"alt":null,"id":6898110693465,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL92260-12.jpg?v=1599724119"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL92260-12.jpg?v=1599724119"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL92260-12.jpg?v=1599724119","options":["Title"],"media":[{"alt":null,"id":6898110693465,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL92260-12.jpg?v=1599724119"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHL92260-12.jpg?v=1599724119","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006092\u003cbr\u003e\u003cbr\u003eUPC: 194629082100\u003cbr\u003eThick foam pads provide clean, crisp impressions. Packed in hinged casings made of sturdy plastic. Each pad is individually shrink wrapped. Re-inkable. Non-toxic inks. Sold as a pack of 12 stamp pads.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eThese thick foam pads provide clean, crisp impressions every time!Thick foam pads provide clean, crisp impressions.Packed in hinged casings made of sturdy plastic.Each pad is individually shrink wrapped.\u003cbr\u003eSKU: ERSCHL92260-12"}
(12 Ea) Stamp Pad Violet

(12 Ea) Stamp Pad Violet

$40.77

MPN: 006092UPC: 194629082100Thick foam pads provide clean, crisp impressions. Packed in hinged casings made of sturdy plastic. Each pad is individually shrink wrapped. Re-inkable. Non-toxic inks. Sold as a pack of 12 stamp pads.Key Features : These thick foam pads provide clean, crisp impressions every time!Thick foam pads provide clean, crisp i...


More Info
{"id":4716373639257,"title":"(2 Ea) 16in Red Basic Collection Backpk","handle":"2-ea-16in-red-basic-collection-backpk","description":"MPN: 006569\u003cbr\u003e\u003cbr\u003eUPC: 194629074006\u003cbr\u003eThis school bag features 2 compartments: the large compartment is great for larger items such as text book, binders, laptops, etc., while smaller compartment located in front is perfect for cell phones, keys, hand sanitizer and more. There are 2 zipper pulls for the large compartment, and 1 zipper pull for the smaller compartment. The 2 adjustable shoulder straps are nicely padded for comfort while carrying the backpack. There is a nylon handle on top of the backpack, convenient for hanging the backpack on hook outside of classrooms, or any hanger. Sold as a pack of 2 bags.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eOne large main compartment and small front compartment with zipper closureLightly padded, adjustable shoulder straps and carrying handleIdeal for schools, stadiums and travel\u003cbr\u003eSKU: ERSBAZ1032-2","published_at":"2024-03-21T06:16:32-04:00","created_at":"2020-09-10T03:47:27-04:00","vendor":"Bazic Products","type":"Teacher Aids","tags":["4+ years","600 D POLYESTER","Accessories","Red"],"price":3285,"price_min":3285,"price_max":3285,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157552345177,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSBAZ1032-2","requires_shipping":true,"taxable":true,"featured_image":{"id":14726518308953,"product_id":4716373639257,"position":1,"created_at":"2020-09-10T03:47:27-04:00","updated_at":"2020-09-10T03:47:27-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1032-2.jpg?v=1599724047","variant_ids":[32157552345177]},"available":true,"name":"(2 Ea) 16in Red Basic Collection Backpk","public_title":null,"options":["Default Title"],"price":3285,"weight":590,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629074006","featured_media":{"alt":null,"id":6898105974873,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1032-2.jpg?v=1599724047"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1032-2.jpg?v=1599724047"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1032-2.jpg?v=1599724047","options":["Title"],"media":[{"alt":null,"id":6898105974873,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1032-2.jpg?v=1599724047"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1032-2.jpg?v=1599724047","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006569\u003cbr\u003e\u003cbr\u003eUPC: 194629074006\u003cbr\u003eThis school bag features 2 compartments: the large compartment is great for larger items such as text book, binders, laptops, etc., while smaller compartment located in front is perfect for cell phones, keys, hand sanitizer and more. There are 2 zipper pulls for the large compartment, and 1 zipper pull for the smaller compartment. The 2 adjustable shoulder straps are nicely padded for comfort while carrying the backpack. There is a nylon handle on top of the backpack, convenient for hanging the backpack on hook outside of classrooms, or any hanger. Sold as a pack of 2 bags.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eOne large main compartment and small front compartment with zipper closureLightly padded, adjustable shoulder straps and carrying handleIdeal for schools, stadiums and travel\u003cbr\u003eSKU: ERSBAZ1032-2"}
(2 Ea) 16in Red Basic Collection Backpk

(2 Ea) 16in Red Basic Collection Backpk

$32.85

MPN: 006569UPC: 194629074006This school bag features 2 compartments: the large compartment is great for larger items such as text book, binders, laptops, etc., while smaller compartment located in front is perfect for cell phones, keys, hand sanitizer and more. There are 2 zipper pulls for the large compartment, and 1 zipper pull for the smaller...


More Info
{"id":4716372787289,"title":"Please Sign \u0026 Return Pup","handle":"please-sign-return-pup","description":"MPN: 006588\u003cbr\u003e\u003cbr\u003eUPC: 085700044530\u003cbr\u003eCute stamp with a puppy holding a pencil in its mouth, asking the recipient to sign and return the stamped item.\n\nHero Arts woodblock stamps offer long-lasting quality and precision in stamping. Each stamp features original designs. Our blocks originate from sustainably managed forests, and each is crafted from 100% natural rubber and is hand cut and assembled by us in the USA.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eWood block stamp with red rubberCrisp impressionHigh qualityWorks great with any ink\u003cbr\u003eSKU: ERSHOAD453","published_at":"2025-04-10T19:58:21-04:00","created_at":"2020-09-10T03:46:10-04:00","vendor":"Hero Arts","type":"Teacher Aids","tags":["3+ years","Multi","Rubber","Stamps \u0026 Stamp Pads","Wood"],"price":889,"price_min":889,"price_max":889,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157551394905,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSHOAD453","requires_shipping":true,"taxable":true,"featured_image":{"id":14726513197145,"product_id":4716372787289,"position":1,"created_at":"2020-09-10T03:46:10-04:00","updated_at":"2020-09-10T03:46:10-04:00","alt":null,"width":1600,"height":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOAD453.jpg?v=1599723970","variant_ids":[32157551394905]},"available":true,"name":"Please Sign \u0026 Return Pup","public_title":null,"options":["Default Title"],"price":889,"weight":408,"compare_at_price":null,"inventory_quantity":29,"inventory_management":"shopify","inventory_policy":"deny","barcode":"085700044530","featured_media":{"alt":null,"id":6898100863065,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOAD453.jpg?v=1599723970"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOAD453.jpg?v=1599723970"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOAD453.jpg?v=1599723970","options":["Title"],"media":[{"alt":null,"id":6898100863065,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOAD453.jpg?v=1599723970"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOAD453.jpg?v=1599723970","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006588\u003cbr\u003e\u003cbr\u003eUPC: 085700044530\u003cbr\u003eCute stamp with a puppy holding a pencil in its mouth, asking the recipient to sign and return the stamped item.\n\nHero Arts woodblock stamps offer long-lasting quality and precision in stamping. Each stamp features original designs. Our blocks originate from sustainably managed forests, and each is crafted from 100% natural rubber and is hand cut and assembled by us in the USA.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eWood block stamp with red rubberCrisp impressionHigh qualityWorks great with any ink\u003cbr\u003eSKU: ERSHOAD453"}
Please Sign & Return Pup

Please Sign & Return Pup

$8.89

MPN: 006588UPC: 085700044530Cute stamp with a puppy holding a pencil in its mouth, asking the recipient to sign and return the stamped item. Hero Arts woodblock stamps offer long-lasting quality and precision in stamping. Each stamp features original designs. Our blocks originate from sustainably managed forests, and each is crafted from 100% n...


More Info
{"id":4716371345497,"title":"Notepad Mini Tooth","handle":"notepad-mini-tooth","description":"MPN: 006459\u003cbr\u003e\u003cbr\u003eUPC: 098497007787\u003cbr\u003eOur Tooth Notepad comes with 35 sheets per package and is approx. 3\" x 3\". They're great for making word cards, mini-books, and game parts, as well as scrapbooking. Acid Free!\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eOurTooth notepad is great for making word cards, mini-books, and game parts, as well as scrapbooking.35 sheets per packageApprox. 3\" x 3.\"ACID FREE!\u003cbr\u003eSKU: ERSSE-778","published_at":"2025-04-10T19:58:22-04:00","created_at":"2020-09-10T03:44:12-04:00","vendor":"Creative Shapes Etc. Llc","type":"Teacher Aids","tags":["Multi","Note Pads"],"price":643,"price_min":643,"price_max":643,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157550084185,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSSE-778","requires_shipping":true,"taxable":true,"featured_image":{"id":14726507462745,"product_id":4716371345497,"position":1,"created_at":"2020-09-10T03:44:12-04:00","updated_at":"2020-09-10T03:44:12-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSSE-778.jpg?v=1599723852","variant_ids":[32157550084185]},"available":true,"name":"Notepad Mini Tooth","public_title":null,"options":["Default Title"],"price":643,"weight":18,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"098497007787","featured_media":{"alt":null,"id":6898095128665,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSSE-778.jpg?v=1599723852"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSSE-778.jpg?v=1599723852"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSSE-778.jpg?v=1599723852","options":["Title"],"media":[{"alt":null,"id":6898095128665,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSSE-778.jpg?v=1599723852"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSSE-778.jpg?v=1599723852","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006459\u003cbr\u003e\u003cbr\u003eUPC: 098497007787\u003cbr\u003eOur Tooth Notepad comes with 35 sheets per package and is approx. 3\" x 3\". They're great for making word cards, mini-books, and game parts, as well as scrapbooking. Acid Free!\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eOurTooth notepad is great for making word cards, mini-books, and game parts, as well as scrapbooking.35 sheets per packageApprox. 3\" x 3.\"ACID FREE!\u003cbr\u003eSKU: ERSSE-778"}
Notepad Mini Tooth

Notepad Mini Tooth

$6.43

MPN: 006459UPC: 098497007787Our Tooth Notepad comes with 35 sheets per package and is approx. 3" x 3". They're great for making word cards, mini-books, and game parts, as well as scrapbooking. Acid Free!Key Features : OurTooth notepad is great for making word cards, mini-books, and game parts, as well as scrapbooking.35 sheets per packageApprox....


More Info
{"id":4716369805401,"title":"Paint \u0026 Clay Animal Rockers 4 Set","handle":"paint-clay-animal-rockers-4-set","description":"MPN: 005646\u003cbr\u003e\u003cbr\u003eUPC: 734653031813\u003cbr\u003eCreate wild patterns with paint, clay and DIY projects with Paint and Clay Animal Rockers! This 4-piece set includes 4 different stampers, each with a different pattern: leopard, zebra, fish scales and alligator skin. Children love to rock them back and forth! Create patterns on paintings, paper borders, posters, cards and more! As children craft, they develop imagination, creative expression, hand-eye coordination and fine motor skills. These paint and dough tools feature spherical, easy to hold handles. Ideal for those with special needs, the ergonomic handle design provides greater comfort and control. Made of thick rubber, these stampers will last for years of arts and crafts. For ages 2+. Size: 2\"L x 1.9\"W x 2\"H.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eThis set includes 4 semi-circular stampers, each with a different animal skin pattern: leopard, zebra, fish scales and alligator skin.These paint and dough stampers feature ball-shaped rubber handles which nest comfortably in small hands. Perfect for those with special needs!Children love to rock these rubber stamps back and forth to create animal patterns! Use them to add textures to paint, clay and dough creations.Made of thick rubber, these art tools are durable for endless stamping and creating.\u003cbr\u003eSKU: ERSCE-6681","published_at":"2025-01-01T11:47:58-05:00","created_at":"2020-09-10T03:42:35-04:00","vendor":"Learning Advantage","type":"Teacher Aids","tags":["2+ years","Multi","Plastic","Rubber","Stamps \u0026 Stamp Pads"],"price":2191,"price_min":2191,"price_max":2191,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157548380249,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCE-6681","requires_shipping":true,"taxable":true,"featured_image":{"id":14726495764569,"product_id":4716369805401,"position":1,"created_at":"2020-09-10T03:42:35-04:00","updated_at":"2020-09-10T03:42:35-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6681.jpg?v=1599723755","variant_ids":[32157548380249]},"available":true,"name":"Paint \u0026 Clay Animal Rockers 4 Set","public_title":null,"options":["Default Title"],"price":2191,"weight":272,"compare_at_price":null,"inventory_quantity":6,"inventory_management":"shopify","inventory_policy":"deny","barcode":"734653031813","featured_media":{"alt":null,"id":6898083430489,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6681.jpg?v=1599723755"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6681.jpg?v=1599723755","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6681_1.jpg?v=1599723757"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6681.jpg?v=1599723755","options":["Title"],"media":[{"alt":null,"id":6898083430489,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6681.jpg?v=1599723755"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6681.jpg?v=1599723755","width":1500},{"alt":null,"id":6898083725401,"position":2,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6681_1.jpg?v=1599723757"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6681_1.jpg?v=1599723757","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005646\u003cbr\u003e\u003cbr\u003eUPC: 734653031813\u003cbr\u003eCreate wild patterns with paint, clay and DIY projects with Paint and Clay Animal Rockers! This 4-piece set includes 4 different stampers, each with a different pattern: leopard, zebra, fish scales and alligator skin. Children love to rock them back and forth! Create patterns on paintings, paper borders, posters, cards and more! As children craft, they develop imagination, creative expression, hand-eye coordination and fine motor skills. These paint and dough tools feature spherical, easy to hold handles. Ideal for those with special needs, the ergonomic handle design provides greater comfort and control. Made of thick rubber, these stampers will last for years of arts and crafts. For ages 2+. Size: 2\"L x 1.9\"W x 2\"H.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eThis set includes 4 semi-circular stampers, each with a different animal skin pattern: leopard, zebra, fish scales and alligator skin.These paint and dough stampers feature ball-shaped rubber handles which nest comfortably in small hands. Perfect for those with special needs!Children love to rock these rubber stamps back and forth to create animal patterns! Use them to add textures to paint, clay and dough creations.Made of thick rubber, these art tools are durable for endless stamping and creating.\u003cbr\u003eSKU: ERSCE-6681"}
Paint & Clay Animal Rockers 4 Set

Paint & Clay Animal Rockers 4 Set

$21.91

MPN: 005646UPC: 734653031813Create wild patterns with paint, clay and DIY projects with Paint and Clay Animal Rockers! This 4-piece set includes 4 different stampers, each with a different pattern: leopard, zebra, fish scales and alligator skin. Children love to rock them back and forth! Create patterns on paintings, paper borders, posters, card...


More Info
{"id":4716369772633,"title":"Paint \u0026 Clay 4 Set Mushroom Stamper","handle":"paint-clay-4-set-mushroom-stamper","description":"MPN: 005646\u003cbr\u003e\u003cbr\u003eUPC: 734653031820\u003cbr\u003eCreate artistic patterns with paint, clay and DIY projects with Paint and Clay Mushroom Stampers! This 4-piece set includes 4 different stampers, each with a different pattern: circles (recessed and raised), swirls with dots and raised pyramids. Create patterns on paintings, paper borders, posters, cards and more! As children craft, they develop imagination, creative expression, hand-eye coordination and fine motor skills. These paint and dough tools feature spherical, easy to hold handles. Ideal for those with special needs, the ergonomic handle design provides greater comfort and control. Made of thick rubber, these stampers will last for years of arts and crafts. For ages 2+. Size: 2.25\"H x 2\" dia.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eThis set includes 4 mushroom-shaped, semispherical stampers each with a different pattern: recessed circles, raised circles, swirls with dots and raised pyramids.These paint and dough stampers feature ball-shaped rubber handles which nest comfortably in small hands. Perfect for those with special needs!Children love to add exciting patterns and textures to their paint, clay and dough creations.Made of thick rubber, these art tools are durable for endless stamping and creating. They can be easily cleaned with soap and warm water!\u003cbr\u003eSKU: ERSCE-6682","published_at":"2025-01-01T11:47:58-05:00","created_at":"2020-09-10T03:42:31-04:00","vendor":"Learning Advantage","type":"Teacher Aids","tags":["2+ years","Multi","Plastic","Rubber","Stamps \u0026 Stamp Pads"],"price":2191,"price_min":2191,"price_max":2191,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157548347481,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCE-6682","requires_shipping":true,"taxable":true,"featured_image":{"id":14726495404121,"product_id":4716369772633,"position":1,"created_at":"2020-09-10T03:42:31-04:00","updated_at":"2020-09-10T03:42:31-04:00","alt":null,"width":1600,"height":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6682.jpg?v=1599723751","variant_ids":[32157548347481]},"available":true,"name":"Paint \u0026 Clay 4 Set Mushroom Stamper","public_title":null,"options":["Default Title"],"price":2191,"weight":186,"compare_at_price":null,"inventory_quantity":14,"inventory_management":"shopify","inventory_policy":"deny","barcode":"734653031820","featured_media":{"alt":null,"id":6898083070041,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6682.jpg?v=1599723751"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6682.jpg?v=1599723751","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6682_1.jpg?v=1599723754"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6682.jpg?v=1599723751","options":["Title"],"media":[{"alt":null,"id":6898083070041,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6682.jpg?v=1599723751"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6682.jpg?v=1599723751","width":1600},{"alt":null,"id":6898083397721,"position":2,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6682_1.jpg?v=1599723754"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6682_1.jpg?v=1599723754","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005646\u003cbr\u003e\u003cbr\u003eUPC: 734653031820\u003cbr\u003eCreate artistic patterns with paint, clay and DIY projects with Paint and Clay Mushroom Stampers! This 4-piece set includes 4 different stampers, each with a different pattern: circles (recessed and raised), swirls with dots and raised pyramids. Create patterns on paintings, paper borders, posters, cards and more! As children craft, they develop imagination, creative expression, hand-eye coordination and fine motor skills. These paint and dough tools feature spherical, easy to hold handles. Ideal for those with special needs, the ergonomic handle design provides greater comfort and control. Made of thick rubber, these stampers will last for years of arts and crafts. For ages 2+. Size: 2.25\"H x 2\" dia.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eThis set includes 4 mushroom-shaped, semispherical stampers each with a different pattern: recessed circles, raised circles, swirls with dots and raised pyramids.These paint and dough stampers feature ball-shaped rubber handles which nest comfortably in small hands. Perfect for those with special needs!Children love to add exciting patterns and textures to their paint, clay and dough creations.Made of thick rubber, these art tools are durable for endless stamping and creating. They can be easily cleaned with soap and warm water!\u003cbr\u003eSKU: ERSCE-6682"}
Paint & Clay 4 Set Mushroom Stamper

Paint & Clay 4 Set Mushroom Stamper

$21.91

MPN: 005646UPC: 734653031820Create artistic patterns with paint, clay and DIY projects with Paint and Clay Mushroom Stampers! This 4-piece set includes 4 different stampers, each with a different pattern: circles (recessed and raised), swirls with dots and raised pyramids. Create patterns on paintings, paper borders, posters, cards and more! As ...


More Info
{"id":4716369707097,"title":"Easy Grip Geometric Stampers 4 Set","handle":"easy-grip-geometric-stampers-4-set","description":"MPN: 005646\u003cbr\u003e\u003cbr\u003eUPC: 734653031783\u003cbr\u003eCreate patterns in paint, clay and DIY projects with geometric Triangle Grip Stampers! This set includes 4 long stampers with triangular-shaped handles and 4 different geometric shapes: circle, square, triangle and hexagon. Ideal for those with special needs, Triangle Grip Stampers rest comfortably in small hands for greater artistic control. The triangle shape also promotes proper writing grip. Made of flexible rubber, these art tools are durable for endless painting, modeling and creating. Use them to decorate cards, notebooks and clay creations! As children create, they develop imagination, creative expression, hand-eye coordination and fine motor skills. For ages 2+. Size: 5.4\".\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eThis stamp set includes 4 long, triangular handles with different raised geometric shapes on one end: circle, square, triangle and hexagon.With triangular-shaped handles, these paint and clay stampers stimulate tripod writing grip for perfect practice!Kids love to stamp their workbooks and worksheets to make shape learning more visually appealing! Use these shape stamps to decorate signs, cards, notebooks and more.The triangular handles rest comfortably in small hands. Perfect for those with special needs, these art tools provide greater artistic control and encourage independence.\u003cbr\u003eSKU: ERSCE-6677","published_at":"2025-04-10T19:58:20-04:00","created_at":"2020-09-10T03:42:27-04:00","vendor":"Learning Advantage","type":"Teacher Aids","tags":["2+ years","Blue","Green","Orange","Plastic","Red","Rubber","Stamps \u0026 Stamp Pads"],"price":1369,"price_min":1369,"price_max":1369,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157548281945,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCE-6677","requires_shipping":true,"taxable":true,"featured_image":{"id":14726494912601,"product_id":4716369707097,"position":1,"created_at":"2020-09-10T03:42:27-04:00","updated_at":"2020-09-10T03:42:27-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6677.jpg?v=1599723747","variant_ids":[32157548281945]},"available":true,"name":"Easy Grip Geometric Stampers 4 Set","public_title":null,"options":["Default Title"],"price":1369,"weight":122,"compare_at_price":null,"inventory_quantity":17,"inventory_management":"shopify","inventory_policy":"deny","barcode":"734653031783","featured_media":{"alt":null,"id":6898082578521,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6677.jpg?v=1599723747"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6677.jpg?v=1599723747","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6677_1.jpg?v=1599723749"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6677.jpg?v=1599723747","options":["Title"],"media":[{"alt":null,"id":6898082578521,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6677.jpg?v=1599723747"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6677.jpg?v=1599723747","width":1500},{"alt":null,"id":6898082873433,"position":2,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6677_1.jpg?v=1599723749"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6677_1.jpg?v=1599723749","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005646\u003cbr\u003e\u003cbr\u003eUPC: 734653031783\u003cbr\u003eCreate patterns in paint, clay and DIY projects with geometric Triangle Grip Stampers! This set includes 4 long stampers with triangular-shaped handles and 4 different geometric shapes: circle, square, triangle and hexagon. Ideal for those with special needs, Triangle Grip Stampers rest comfortably in small hands for greater artistic control. The triangle shape also promotes proper writing grip. Made of flexible rubber, these art tools are durable for endless painting, modeling and creating. Use them to decorate cards, notebooks and clay creations! As children create, they develop imagination, creative expression, hand-eye coordination and fine motor skills. For ages 2+. Size: 5.4\".\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eThis stamp set includes 4 long, triangular handles with different raised geometric shapes on one end: circle, square, triangle and hexagon.With triangular-shaped handles, these paint and clay stampers stimulate tripod writing grip for perfect practice!Kids love to stamp their workbooks and worksheets to make shape learning more visually appealing! Use these shape stamps to decorate signs, cards, notebooks and more.The triangular handles rest comfortably in small hands. Perfect for those with special needs, these art tools provide greater artistic control and encourage independence.\u003cbr\u003eSKU: ERSCE-6677"}
Easy Grip Geometric Stampers 4 Set

Easy Grip Geometric Stampers 4 Set

$13.69

MPN: 005646UPC: 734653031783Create patterns in paint, clay and DIY projects with geometric Triangle Grip Stampers! This set includes 4 long stampers with triangular-shaped handles and 4 different geometric shapes: circle, square, triangle and hexagon. Ideal for those with special needs, Triangle Grip Stampers rest comfortably in small hands for ...


More Info
{"id":4716369641561,"title":"Easy Grip Pattern Stampers 4 Set","handle":"easy-grip-pattern-stampers-4-set","description":"MPN: 005646\u003cbr\u003e\u003cbr\u003eUPC: 734653031790\u003cbr\u003eCreate patterns in paint, clay and DIY projects with pattern Triangle Grip Stampers! This set includes 4 long stampers with triangular handles and 4 different creative shapes: flower, splash, spiral and star. Ideal for those with special needs, Triangle Grip Stampers rest comfortably in small hands for greater artistic control. The triangle shape also promotes proper writing grip. Made of flexible rubber, these art tools are durable for endless painting, modeling and creating. Use them to decorate cards, notebooks and clay creations! As children create, they develop imagination, creative expression, hand-eye coordination and fine motor skills. For ages 2+. Size: 5.4\".\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eThis stamp set includes 4 long, triangular handles with different raised patterns on one end: flower, splash, spiral and star.With triangular-shaped handles, these paint and clay stampers stimulate tripod writing grip for perfect practice!Doodle, swirl, and twirl! Children love to add exciting shapes to their paint and dough creations.The triangular handles rest comfortably in small hands. Perfect for those with special needs, these art tools provide greater artistic control and encourage independence.\u003cbr\u003eSKU: ERSCE-6678","published_at":"2025-04-10T19:58:21-04:00","created_at":"2020-09-10T03:42:23-04:00","vendor":"Learning Advantage","type":"Teacher Aids","tags":["2+ years","Blue","Green","Orange","Plastic","Red","Rubber","Stamps \u0026 Stamp Pads"],"price":1369,"price_min":1369,"price_max":1369,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157548216409,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCE-6678","requires_shipping":true,"taxable":true,"featured_image":{"id":14726494781529,"product_id":4716369641561,"position":1,"created_at":"2020-09-10T03:42:23-04:00","updated_at":"2020-09-10T03:42:23-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6678.jpg?v=1599723743","variant_ids":[32157548216409]},"available":true,"name":"Easy Grip Pattern Stampers 4 Set","public_title":null,"options":["Default Title"],"price":1369,"weight":122,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"734653031790","featured_media":{"alt":null,"id":6898082447449,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6678.jpg?v=1599723743"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6678.jpg?v=1599723743","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6678_1.jpg?v=1599723746"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6678.jpg?v=1599723743","options":["Title"],"media":[{"alt":null,"id":6898082447449,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6678.jpg?v=1599723743"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6678.jpg?v=1599723743","width":1500},{"alt":null,"id":6898082545753,"position":2,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6678_1.jpg?v=1599723746"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCE-6678_1.jpg?v=1599723746","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005646\u003cbr\u003e\u003cbr\u003eUPC: 734653031790\u003cbr\u003eCreate patterns in paint, clay and DIY projects with pattern Triangle Grip Stampers! This set includes 4 long stampers with triangular handles and 4 different creative shapes: flower, splash, spiral and star. Ideal for those with special needs, Triangle Grip Stampers rest comfortably in small hands for greater artistic control. The triangle shape also promotes proper writing grip. Made of flexible rubber, these art tools are durable for endless painting, modeling and creating. Use them to decorate cards, notebooks and clay creations! As children create, they develop imagination, creative expression, hand-eye coordination and fine motor skills. For ages 2+. Size: 5.4\".\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eThis stamp set includes 4 long, triangular handles with different raised patterns on one end: flower, splash, spiral and star.With triangular-shaped handles, these paint and clay stampers stimulate tripod writing grip for perfect practice!Doodle, swirl, and twirl! Children love to add exciting shapes to their paint and dough creations.The triangular handles rest comfortably in small hands. Perfect for those with special needs, these art tools provide greater artistic control and encourage independence.\u003cbr\u003eSKU: ERSCE-6678"}
Easy Grip Pattern Stampers 4 Set

Easy Grip Pattern Stampers 4 Set

$13.69

MPN: 005646UPC: 734653031790Create patterns in paint, clay and DIY projects with pattern Triangle Grip Stampers! This set includes 4 long stampers with triangular handles and 4 different creative shapes: flower, splash, spiral and star. Ideal for those with special needs, Triangle Grip Stampers rest comfortably in small hands for greater artisti...


More Info
{"id":4716367970393,"title":"Economy Desk Pad 12 Months Jan - Dec","handle":"economy-desk-pad-12-months-jan-dec","description":"MPN: 006282\u003cbr\u003e\u003cbr\u003eUPC: 040983202251\u003cbr\u003e12 Month Calendar: January - December. Full Calendar Year Along The Bottom. Refillable 4 corner holder. Four reinforced black leatherette corners. Includes Julian dates and days remaining. Printed on 100% post-consumer recycled paper with soy ink. Made in the USA\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003e12 Month Calendar: January - December.Full Calendar Year Along The Bottom.Refillable 4 corner holder. Four reinforced black leatherette corners.Includes Julian dates and days remaining.Printed on 100% post-consumer recycled paper with soy ink.Made in the USA\u003cbr\u003eSKU: ERSHOD12402","published_at":"2025-04-10T19:29:12-04:00","created_at":"2020-09-10T03:40:01-04:00","vendor":"House Of Doolittle","type":"Teacher Aids","tags":["100% post-consumer recycled paper","5+ years","Black","Calendars","soy ink","White"],"price":1548,"price_min":1548,"price_max":1548,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157546512473,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSHOD12402","requires_shipping":true,"taxable":true,"featured_image":{"id":14726488424537,"product_id":4716367970393,"position":1,"created_at":"2020-09-10T03:40:01-04:00","updated_at":"2020-09-10T03:40:01-04:00","alt":null,"width":1600,"height":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOD12402.jpg?v=1599723601","variant_ids":[32157546512473]},"available":true,"name":"Economy Desk Pad 12 Months Jan - Dec","public_title":null,"options":["Default Title"],"price":1548,"weight":399,"compare_at_price":null,"inventory_quantity":15,"inventory_management":"shopify","inventory_policy":"deny","barcode":"040983202251","featured_media":{"alt":null,"id":6898076090457,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOD12402.jpg?v=1599723601"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOD12402.jpg?v=1599723601"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOD12402.jpg?v=1599723601","options":["Title"],"media":[{"alt":null,"id":6898076090457,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOD12402.jpg?v=1599723601"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOD12402.jpg?v=1599723601","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006282\u003cbr\u003e\u003cbr\u003eUPC: 040983202251\u003cbr\u003e12 Month Calendar: January - December. Full Calendar Year Along The Bottom. Refillable 4 corner holder. Four reinforced black leatherette corners. Includes Julian dates and days remaining. Printed on 100% post-consumer recycled paper with soy ink. Made in the USA\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003e12 Month Calendar: January - December.Full Calendar Year Along The Bottom.Refillable 4 corner holder. Four reinforced black leatherette corners.Includes Julian dates and days remaining.Printed on 100% post-consumer recycled paper with soy ink.Made in the USA\u003cbr\u003eSKU: ERSHOD12402"}
Economy Desk Pad 12 Months Jan - Dec

Economy Desk Pad 12 Months Jan - Dec

$15.48

MPN: 006282UPC: 04098320225112 Month Calendar: January - December. Full Calendar Year Along The Bottom. Refillable 4 corner holder. Four reinforced black leatherette corners. Includes Julian dates and days remaining. Printed on 100% post-consumer recycled paper with soy ink. Made in the USAKey Features : 12 Month Calendar: January - Dece...


More Info
{"id":4716367315033,"title":"Magnetic Pocket Chart Squares","handle":"magnetic-pocket-chart-squares-1","description":"MPN: 005083\u003cbr\u003e\u003cbr\u003eUPC: 765023823844\u003cbr\u003eMagnetic Pocket Chart Squares \nBeyond versatile! Use the 4 charts alone, connect vertically or horizontally with hook-and-loop fasteners to make a larger chart! Great for small groups, centers, combined whole-group displays and more. Features 5 rows of clear pockets for your own cards, plus 2 large storage pockets on the reverse side. Four colors- red, orange, blue, green. Hang with included magnets or grommets. Each chart measures 14\"L x 17\"H.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eVersatile charts let you teach new vocabulary, introduce rhyming words, or provide visual assistance for math drills and equationsPerfect for use on your whiteboardGrommets provide more options for hanging!\u003cbr\u003eSKU: ERSLER2384","published_at":"2023-10-10T07:26:27-04:00","created_at":"2020-09-10T03:39:04-04:00","vendor":"Learning Resources","type":"Teacher Aids","tags":["3+ years","Blue","Green","Metal","Nylon","Pocket Charts","Red","Yellow"],"price":3698,"price_min":3698,"price_max":3698,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157545791577,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSLER2384","requires_shipping":true,"taxable":true,"featured_image":{"id":14726484394073,"product_id":4716367315033,"position":1,"created_at":"2020-09-10T03:39:04-04:00","updated_at":"2020-09-10T03:39:04-04:00","alt":null,"width":2000,"height":2000,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2384.jpg?v=1599723544","variant_ids":[32157545791577]},"available":true,"name":"Magnetic Pocket Chart Squares","public_title":null,"options":["Default Title"],"price":3698,"weight":340,"compare_at_price":null,"inventory_quantity":48,"inventory_management":"shopify","inventory_policy":"deny","barcode":"765023823844","featured_media":{"alt":null,"id":6898072059993,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2000,"width":2000,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2384.jpg?v=1599723544"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2384.jpg?v=1599723544","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2384_3.jpg?v=1599723547","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2384_2.jpg?v=1599723549","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2384_1.jpg?v=1599723550"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2384.jpg?v=1599723544","options":["Title"],"media":[{"alt":null,"id":6898072059993,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2000,"width":2000,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2384.jpg?v=1599723544"},"aspect_ratio":1.0,"height":2000,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2384.jpg?v=1599723544","width":2000},{"alt":null,"id":6898072092761,"position":2,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2384_3.jpg?v=1599723547"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2384_3.jpg?v=1599723547","width":2100},{"alt":null,"id":6898072125529,"position":3,"preview_image":{"aspect_ratio":1.0,"height":2000,"width":2000,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2384_2.jpg?v=1599723549"},"aspect_ratio":1.0,"height":2000,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2384_2.jpg?v=1599723549","width":2000},{"alt":null,"id":6898072158297,"position":4,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2384_1.jpg?v=1599723550"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2384_1.jpg?v=1599723550","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005083\u003cbr\u003e\u003cbr\u003eUPC: 765023823844\u003cbr\u003eMagnetic Pocket Chart Squares \nBeyond versatile! Use the 4 charts alone, connect vertically or horizontally with hook-and-loop fasteners to make a larger chart! Great for small groups, centers, combined whole-group displays and more. Features 5 rows of clear pockets for your own cards, plus 2 large storage pockets on the reverse side. Four colors- red, orange, blue, green. Hang with included magnets or grommets. Each chart measures 14\"L x 17\"H.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eVersatile charts let you teach new vocabulary, introduce rhyming words, or provide visual assistance for math drills and equationsPerfect for use on your whiteboardGrommets provide more options for hanging!\u003cbr\u003eSKU: ERSLER2384"}
Magnetic Pocket Chart Squares

Magnetic Pocket Chart Squares

$36.98

MPN: 005083UPC: 765023823844Magnetic Pocket Chart Squares Beyond versatile! Use the 4 charts alone, connect vertically or horizontally with hook-and-loop fasteners to make a larger chart! Great for small groups, centers, combined whole-group displays and more. Features 5 rows of clear pockets for your own cards, plus 2 large storage pockets on ...


More Info
{"id":4716367249497,"title":"Tock The Learning Clock","handle":"tock-the-learning-clock","description":"MPN: 005083\u003cbr\u003e\u003cbr\u003eUPC: 765023023855\u003cbr\u003eWake up! It's time to learn! Turn telling time into a music-filled dance party with Tock the Learning Clock from Learning Resources. This adorable robot clock comes with analog hour and minute hands, as well as a digital display that functions as a real clock. Tock supports two time-teaching modes: in Musical Fun Mode, Tock rewards kids for correctly setting the hour and minute hands by playing snippets of fun, dance-ready tunes. In Question Mode, Tock asks kids to match the analog hands to the time shown on the clock's digital display, turning every passing minute into a potential quiz opportunity. In addition to teaching time skills, Tock the Learning Clock also helps kids get a good night's rest. Tock comes with a night light function, as well as an \"Ok to Wake\" light that changes color when it's ok to get out of bed and have a morning dance party.\n\n• Friendly robot introduces kids to analog and digital clock skills\n• Two learning modes: Musical Fun Mode rewards right answers with a dance, while Question Mode challenges kids to match the hands to the digital display\n• Analog hands encourage hands-on learning, while digital time display functions as a working clock\n• \"OK to Wake\" light lets kids know when it's ok to get out of bed and boogie\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eWake up! It's time to learn!This adorable robot clock comes with analog hour and minute hands, as well as a digital display that functions as a real clockAnalog hands encourage hands-on learning, while digital time display functions as a working clock\u003cbr\u003eSKU: ERSLER2385","published_at":"2023-02-18T00:04:24-05:00","created_at":"2020-09-10T03:38:58-04:00","vendor":"Learning Resources","type":"Teacher Aids","tags":["3-9 years","Clocks","Electronic","Multi","Plastic"],"price":4109,"price_min":4109,"price_max":4109,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157545758809,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSLER2385","requires_shipping":true,"taxable":true,"featured_image":{"id":14726484230233,"product_id":4716367249497,"position":1,"created_at":"2020-09-10T03:38:58-04:00","updated_at":"2020-09-10T03:38:58-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2385.jpg?v=1599723538","variant_ids":[32157545758809]},"available":true,"name":"Tock The Learning Clock","public_title":null,"options":["Default Title"],"price":4109,"weight":567,"compare_at_price":null,"inventory_quantity":11,"inventory_management":"shopify","inventory_policy":"deny","barcode":"765023023855","featured_media":{"alt":null,"id":6898071896153,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2385.jpg?v=1599723538"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2385.jpg?v=1599723538","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2385_3.jpg?v=1599723540","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2385_2.jpg?v=1599723541","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2385_1.jpg?v=1599723543"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2385.jpg?v=1599723538","options":["Title"],"media":[{"alt":null,"id":6898071896153,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2385.jpg?v=1599723538"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2385.jpg?v=1599723538","width":2100},{"alt":null,"id":6898071928921,"position":2,"preview_image":{"aspect_ratio":1.0,"height":2000,"width":2000,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2385_3.jpg?v=1599723540"},"aspect_ratio":1.0,"height":2000,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2385_3.jpg?v=1599723540","width":2000},{"alt":null,"id":6898071961689,"position":3,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2385_2.jpg?v=1599723541"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2385_2.jpg?v=1599723541","width":2100},{"alt":null,"id":6898072027225,"position":4,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2385_1.jpg?v=1599723543"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2385_1.jpg?v=1599723543","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005083\u003cbr\u003e\u003cbr\u003eUPC: 765023023855\u003cbr\u003eWake up! It's time to learn! Turn telling time into a music-filled dance party with Tock the Learning Clock from Learning Resources. This adorable robot clock comes with analog hour and minute hands, as well as a digital display that functions as a real clock. Tock supports two time-teaching modes: in Musical Fun Mode, Tock rewards kids for correctly setting the hour and minute hands by playing snippets of fun, dance-ready tunes. In Question Mode, Tock asks kids to match the analog hands to the time shown on the clock's digital display, turning every passing minute into a potential quiz opportunity. In addition to teaching time skills, Tock the Learning Clock also helps kids get a good night's rest. Tock comes with a night light function, as well as an \"Ok to Wake\" light that changes color when it's ok to get out of bed and have a morning dance party.\n\n• Friendly robot introduces kids to analog and digital clock skills\n• Two learning modes: Musical Fun Mode rewards right answers with a dance, while Question Mode challenges kids to match the hands to the digital display\n• Analog hands encourage hands-on learning, while digital time display functions as a working clock\n• \"OK to Wake\" light lets kids know when it's ok to get out of bed and boogie\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eWake up! It's time to learn!This adorable robot clock comes with analog hour and minute hands, as well as a digital display that functions as a real clockAnalog hands encourage hands-on learning, while digital time display functions as a working clock\u003cbr\u003eSKU: ERSLER2385"}
Tock The Learning Clock

Tock The Learning Clock

$41.09

MPN: 005083UPC: 765023023855Wake up! It's time to learn! Turn telling time into a music-filled dance party with Tock the Learning Clock from Learning Resources. This adorable robot clock comes with analog hour and minute hands, as well as a digital display that functions as a real clock. Tock supports two time-teaching modes: in Musical Fun Mode...


More Info
{"id":4716366954585,"title":"2 And 4 Column Double-sided Pocket Chart","handle":"2-and-4-column-double-sided-pocket-chart","description":"MPN: 005083\u003cbr\u003e\u003cbr\u003eUPC: 765023823820\u003cbr\u003eJoined by grommets at the top, double-sided chart is an ideal higher-order thinking tool.\n\n# Provides effective graphic organizers for teaching any skill or subject\n\n# Features 2-column chart for comparing and contrasting, sorting or making a T-chart, and 4-column chart for sorting and classifying\n\n# Contains 9 display pockets per chart measuring 30\"L x 2\"H each\n\n# Offers plenty of storage space in 2 built-in pockets (1 on the back of each chart)\n\n# Includes Activity Guide; cards and manipulatives are available separately\n\n# Flame-retardant nylon chart measures 30\"L x 38\"H\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eTwo higher-order thinking tools in 1!Joined by grommets at the top to make 1 unitCards and manipulatives are available separately\u003cbr\u003eSKU: ERSLER2382","published_at":"2024-09-20T16:22:19-04:00","created_at":"2020-09-10T03:38:39-04:00","vendor":"Learning Resources","type":"Teacher Aids","tags":["3+ years","Metal","Multi","Nylon","Pocket Charts"],"price":5205,"price_min":5205,"price_max":5205,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157545529433,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSLER2382","requires_shipping":true,"taxable":true,"featured_image":{"id":14726483378265,"product_id":4716366954585,"position":1,"created_at":"2020-09-10T03:38:39-04:00","updated_at":"2020-09-10T03:38:39-04:00","alt":null,"width":1700,"height":1700,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2382.jpg?v=1599723519","variant_ids":[32157545529433]},"available":true,"name":"2 And 4 Column Double-sided Pocket Chart","public_title":null,"options":["Default Title"],"price":5205,"weight":499,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"765023823820","featured_media":{"alt":null,"id":6898071601241,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1700,"width":1700,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2382.jpg?v=1599723519"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2382.jpg?v=1599723519","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2382_3.jpg?v=1599723521","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2382_2.jpg?v=1599723522","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2382_1.jpg?v=1599723524"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2382.jpg?v=1599723519","options":["Title"],"media":[{"alt":null,"id":6898071601241,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1700,"width":1700,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2382.jpg?v=1599723519"},"aspect_ratio":1.0,"height":1700,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2382.jpg?v=1599723519","width":1700},{"alt":null,"id":6898071634009,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1800,"width":1800,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2382_3.jpg?v=1599723521"},"aspect_ratio":1.0,"height":1800,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2382_3.jpg?v=1599723521","width":1800},{"alt":null,"id":6898071666777,"position":3,"preview_image":{"aspect_ratio":1.0,"height":1800,"width":1800,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2382_2.jpg?v=1599723522"},"aspect_ratio":1.0,"height":1800,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2382_2.jpg?v=1599723522","width":1800},{"alt":null,"id":6898071699545,"position":4,"preview_image":{"aspect_ratio":1.0,"height":1800,"width":1800,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2382_1.jpg?v=1599723524"},"aspect_ratio":1.0,"height":1800,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2382_1.jpg?v=1599723524","width":1800}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005083\u003cbr\u003e\u003cbr\u003eUPC: 765023823820\u003cbr\u003eJoined by grommets at the top, double-sided chart is an ideal higher-order thinking tool.\n\n# Provides effective graphic organizers for teaching any skill or subject\n\n# Features 2-column chart for comparing and contrasting, sorting or making a T-chart, and 4-column chart for sorting and classifying\n\n# Contains 9 display pockets per chart measuring 30\"L x 2\"H each\n\n# Offers plenty of storage space in 2 built-in pockets (1 on the back of each chart)\n\n# Includes Activity Guide; cards and manipulatives are available separately\n\n# Flame-retardant nylon chart measures 30\"L x 38\"H\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eTwo higher-order thinking tools in 1!Joined by grommets at the top to make 1 unitCards and manipulatives are available separately\u003cbr\u003eSKU: ERSLER2382"}
2 And 4 Column Double-sided Pocket Chart

2 And 4 Column Double-sided Pocket Chart

$52.05

MPN: 005083UPC: 765023823820Joined by grommets at the top, double-sided chart is an ideal higher-order thinking tool. # Provides effective graphic organizers for teaching any skill or subject # Features 2-column chart for comparing and contrasting, sorting or making a T-chart, and 4-column chart for sorting and classifying # Contains 9 displa...


More Info
{"id":4716366266457,"title":"(3 Pk) Chalkboard Brights Labels","handle":"3-pk-chalkboard-brights-labels","description":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 194629065301\u003cbr\u003eUse these non-adhesive labels on pocket charts, boxes, bins, or student folders. Each piece measures 5-1\/4\" x 1-1\/2\". Each pack includes 120 labels: 4 perforated labels per sheet, 30 sheets per pack. Sold as 3 packs for a total of 360 labels.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eUse in pocket charts or word wallsGreat for labeling boxes, bins and student foldersNo adhesiveMeasure 5.25\" x 1.5\"Assorted colors\u003cbr\u003eSKU: ERSTCR20871-3","published_at":"2021-05-02T05:20:18-04:00","created_at":"2020-09-10T03:37:53-04:00","vendor":"Teacher Created Resources","type":"Teacher Aids","tags":["4+ years","Multi","Name Plates","Paper"],"price":2462,"price_min":2462,"price_max":2462,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157543956569,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSTCR20871-3","requires_shipping":true,"taxable":true,"featured_image":{"id":14726480134233,"product_id":4716366266457,"position":1,"created_at":"2020-09-10T03:37:53-04:00","updated_at":"2020-09-10T03:37:53-04:00","alt":null,"width":2100,"height":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR20871-3.jpg?v=1599723473","variant_ids":[32157543956569]},"available":true,"name":"(3 Pk) Chalkboard Brights Labels","public_title":null,"options":["Default Title"],"price":2462,"weight":513,"compare_at_price":null,"inventory_quantity":19,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629065301","featured_media":{"alt":null,"id":6898067800153,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR20871-3.jpg?v=1599723473"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR20871-3.jpg?v=1599723473"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR20871-3.jpg?v=1599723473","options":["Title"],"media":[{"alt":null,"id":6898067800153,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR20871-3.jpg?v=1599723473"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSTCR20871-3.jpg?v=1599723473","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005003\u003cbr\u003e\u003cbr\u003eUPC: 194629065301\u003cbr\u003eUse these non-adhesive labels on pocket charts, boxes, bins, or student folders. Each piece measures 5-1\/4\" x 1-1\/2\". Each pack includes 120 labels: 4 perforated labels per sheet, 30 sheets per pack. Sold as 3 packs for a total of 360 labels.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eUse in pocket charts or word wallsGreat for labeling boxes, bins and student foldersNo adhesiveMeasure 5.25\" x 1.5\"Assorted colors\u003cbr\u003eSKU: ERSTCR20871-3"}
(3 Pk) Chalkboard Brights Labels

(3 Pk) Chalkboard Brights Labels

$24.62

MPN: 005003UPC: 194629065301Use these non-adhesive labels on pocket charts, boxes, bins, or student folders. Each piece measures 5-1/4" x 1-1/2". Each pack includes 120 labels: 4 perforated labels per sheet, 30 sheets per pack. Sold as 3 packs for a total of 360 labels.Key Features : Use in pocket charts or word wallsGreat for labeling boxes, bi...


More Info
{"id":4716366233689,"title":"Standard Pocket Chart 33.5 X 42","handle":"standard-pocket-chart-33-5-x-42","description":"MPN: 005083\u003cbr\u003e\u003cbr\u003eUPC: 765023007961\u003cbr\u003ePocket chart features ten giant see-through pockets for use in a variety of activities across the curriculum. Designed with grommets for easy mounting on our Adjustable Chart Stand (LER 2196) or wall hanging. Includes 16-page Teaching Guide with blackline masters.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eIntrigue students with a variety of hands-on activities using this versatile pocket chartFeatures ten giant see-through pockets for use in a variety of activities across the curriculumDesigned with grommets for easy mounting\u003cbr\u003eSKU: ERSLER2206","published_at":"2024-09-23T04:56:17-04:00","created_at":"2020-09-10T03:37:49-04:00","vendor":"Learning Resources","type":"Teacher Aids","tags":["Pocket Charts"],"price":2739,"price_min":2739,"price_max":2739,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157543923801,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSLER2206","requires_shipping":true,"taxable":true,"featured_image":{"id":14726479872089,"product_id":4716366233689,"position":1,"created_at":"2020-09-10T03:37:49-04:00","updated_at":"2020-09-10T03:37:49-04:00","alt":null,"width":1572,"height":1572,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2206.jpg?v=1599723469","variant_ids":[32157543923801]},"available":true,"name":"Standard Pocket Chart 33.5 X 42","public_title":null,"options":["Default Title"],"price":2739,"weight":340,"compare_at_price":null,"inventory_quantity":4,"inventory_management":"shopify","inventory_policy":"deny","barcode":"765023007961","featured_media":{"alt":null,"id":6898067538009,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1572,"width":1572,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2206.jpg?v=1599723469"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2206.jpg?v=1599723469","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2206_1.jpg?v=1599723471"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2206.jpg?v=1599723469","options":["Title"],"media":[{"alt":null,"id":6898067538009,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1572,"width":1572,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2206.jpg?v=1599723469"},"aspect_ratio":1.0,"height":1572,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2206.jpg?v=1599723469","width":1572},{"alt":null,"id":6898067767385,"position":2,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2206_1.jpg?v=1599723471"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2206_1.jpg?v=1599723471","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005083\u003cbr\u003e\u003cbr\u003eUPC: 765023007961\u003cbr\u003ePocket chart features ten giant see-through pockets for use in a variety of activities across the curriculum. Designed with grommets for easy mounting on our Adjustable Chart Stand (LER 2196) or wall hanging. Includes 16-page Teaching Guide with blackline masters.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eIntrigue students with a variety of hands-on activities using this versatile pocket chartFeatures ten giant see-through pockets for use in a variety of activities across the curriculumDesigned with grommets for easy mounting\u003cbr\u003eSKU: ERSLER2206"}
Standard Pocket Chart 33.5 X 42

Standard Pocket Chart 33.5 X 42

$27.39

MPN: 005083UPC: 765023007961Pocket chart features ten giant see-through pockets for use in a variety of activities across the curriculum. Designed with grommets for easy mounting on our Adjustable Chart Stand (LER 2196) or wall hanging. Includes 16-page Teaching Guide with blackline masters.Key Features : Intrigue students with a variety of hand...


More Info
{"id":4716366168153,"title":"Pocket Chart Hundreds 26h X 27-1-2","handle":"pocket-chart-hundreds-26h-x-27-1-2","description":"MPN: 005083\u003cbr\u003e\u003cbr\u003eUPC: 765023007985\u003cbr\u003eOne hundred clear pockets make this washable chart perfect for teaching numbers, odds, evens and operations. Includes Teaching Guide and 100 numbered cards (colored differently on reverse to highlight number patterns). Measures 26\" x 27.5\".\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eInvite students to the front of the class to gain hands-on experience with numbers!Excellent for use with ages 3 and up\u003cbr\u003eSKU: ERSLER2208","published_at":"2023-04-27T19:52:47-04:00","created_at":"2020-09-10T03:37:44-04:00","vendor":"Learning Resources","type":"Teacher Aids","tags":["5+ years","Pocket Charts"],"price":2739,"price_min":2739,"price_max":2739,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157543891033,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSLER2208","requires_shipping":true,"taxable":true,"featured_image":{"id":14726479380569,"product_id":4716366168153,"position":1,"created_at":"2020-09-10T03:37:44-04:00","updated_at":"2020-09-10T03:37:44-04:00","alt":null,"width":1600,"height":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2208.jpg?v=1599723464","variant_ids":[32157543891033]},"available":true,"name":"Pocket Chart Hundreds 26h X 27-1-2","public_title":null,"options":["Default Title"],"price":2739,"weight":272,"compare_at_price":null,"inventory_quantity":9,"inventory_management":"shopify","inventory_policy":"deny","barcode":"765023007985","featured_media":{"alt":null,"id":6898067046489,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2208.jpg?v=1599723464"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2208.jpg?v=1599723464","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2208_1.jpg?v=1599723467"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2208.jpg?v=1599723464","options":["Title"],"media":[{"alt":null,"id":6898067046489,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2208.jpg?v=1599723464"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2208.jpg?v=1599723464","width":1600},{"alt":null,"id":6898067079257,"position":2,"preview_image":{"aspect_ratio":1.0,"height":2000,"width":2000,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2208_1.jpg?v=1599723467"},"aspect_ratio":1.0,"height":2000,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2208_1.jpg?v=1599723467","width":2000}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005083\u003cbr\u003e\u003cbr\u003eUPC: 765023007985\u003cbr\u003eOne hundred clear pockets make this washable chart perfect for teaching numbers, odds, evens and operations. Includes Teaching Guide and 100 numbered cards (colored differently on reverse to highlight number patterns). Measures 26\" x 27.5\".\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eInvite students to the front of the class to gain hands-on experience with numbers!Excellent for use with ages 3 and up\u003cbr\u003eSKU: ERSLER2208"}
Pocket Chart Hundreds 26h X 27-1-2

Pocket Chart Hundreds 26h X 27-1-2

$27.39

MPN: 005083UPC: 765023007985One hundred clear pockets make this washable chart perfect for teaching numbers, odds, evens and operations. Includes Teaching Guide and 100 numbered cards (colored differently on reverse to highlight number patterns). Measures 26" x 27.5".Key Features : Invite students to the front of the class to gain hands-on exp...


More Info
{"id":4716363513945,"title":"Cool Kids Read Book Buddy Bag","handle":"cool-kids-read-book-buddy-bag","description":"MPN: 005005\u003cbr\u003e\u003cbr\u003eUPC: 030554085390\u003cbr\u003eProtect and organize your classroom books and supplies with this versatile clear storage bag! Cool kids read! The punny message on this So Much Pun Book Buddy Bag will put a smile on students' faces! These durable storage bags can be used to store, protect, and organize classroom readers, students' homework or projects, and other materials in the classroom or when students take them home. Each clear plastic bag comes with a sturdy, snap-shut handle for hanging on a classroom storage rack. They can be used in a classroom library or school bookroom to protect school books from damage.\n\nThe full-color design on the front includes a place to write a student's name or to label the bag's contents. These classroom storage bags are also great for organizing supplies in a school supply closet or shared resource area. Each bag measures 10.5\" x 12.5\". Each pack includes 6 bags.\n\nSo Much Pun! is a décor collection that highlights the humorous use of words and phrases that are alike or nearly alike in sound but different in meaning. The SMP collection uses wordplay to bring a fun and lighthearted vibe to the classroom that students and teachers will love.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eProtect and organize your classroom books and supplies with this versatile clear storage bag!Bag measures 10 1\/2\" x 12 1\/2\"Pack of 6 bags\u003cbr\u003eSKU: ERSCTP8539","published_at":"2023-06-28T16:39:09-04:00","created_at":"2020-09-10T03:34:25-04:00","vendor":"Creative Teaching Press","type":"Teacher Aids","tags":["4-13 years","Multi","Plastic","Storage"],"price":2602,"price_min":2602,"price_max":2602,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157540974681,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCTP8539","requires_shipping":true,"taxable":true,"featured_image":{"id":14726464274521,"product_id":4716363513945,"position":1,"created_at":"2020-09-10T03:34:25-04:00","updated_at":"2020-09-10T03:34:25-04:00","alt":null,"width":1600,"height":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCTP8539.jpg?v=1599723265","variant_ids":[32157540974681]},"available":true,"name":"Cool Kids Read Book Buddy Bag","public_title":null,"options":["Default Title"],"price":2602,"weight":145,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"030554085390","featured_media":{"alt":null,"id":6898051940441,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCTP8539.jpg?v=1599723265"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCTP8539.jpg?v=1599723265"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCTP8539.jpg?v=1599723265","options":["Title"],"media":[{"alt":null,"id":6898051940441,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCTP8539.jpg?v=1599723265"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCTP8539.jpg?v=1599723265","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005005\u003cbr\u003e\u003cbr\u003eUPC: 030554085390\u003cbr\u003eProtect and organize your classroom books and supplies with this versatile clear storage bag! Cool kids read! The punny message on this So Much Pun Book Buddy Bag will put a smile on students' faces! These durable storage bags can be used to store, protect, and organize classroom readers, students' homework or projects, and other materials in the classroom or when students take them home. Each clear plastic bag comes with a sturdy, snap-shut handle for hanging on a classroom storage rack. They can be used in a classroom library or school bookroom to protect school books from damage.\n\nThe full-color design on the front includes a place to write a student's name or to label the bag's contents. These classroom storage bags are also great for organizing supplies in a school supply closet or shared resource area. Each bag measures 10.5\" x 12.5\". Each pack includes 6 bags.\n\nSo Much Pun! is a décor collection that highlights the humorous use of words and phrases that are alike or nearly alike in sound but different in meaning. The SMP collection uses wordplay to bring a fun and lighthearted vibe to the classroom that students and teachers will love.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eProtect and organize your classroom books and supplies with this versatile clear storage bag!Bag measures 10 1\/2\" x 12 1\/2\"Pack of 6 bags\u003cbr\u003eSKU: ERSCTP8539"}
Cool Kids Read Book Buddy Bag

Cool Kids Read Book Buddy Bag

$26.02

MPN: 005005UPC: 030554085390Protect and organize your classroom books and supplies with this versatile clear storage bag! Cool kids read! The punny message on this So Much Pun Book Buddy Bag will put a smile on students' faces! These durable storage bags can be used to store, protect, and organize classroom readers, students' homework or project...


More Info
{"id":4716362858585,"title":"Completed With Teacher's Help","handle":"completed-with-teachers-help","description":"MPN: 006588\u003cbr\u003e\u003cbr\u003eUPC: 085700045483\u003cbr\u003eEasy way to communicate with your students or children. Great for teachers or homeschoolers.\n\nHero Arts woodblock stamps offer long-lasting quality and precision in stamping. Each stamp features original designs. Our blocks originate from sustainably managed forests, and each is crafted from 100% natural rubber and is hand cut and assembled by us in the USA.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eWood block stamp with red rubberCrisp impressionHigh qualityWorks great with any ink\u003cbr\u003eSKU: ERSHOAD548","published_at":"2025-04-10T19:29:08-04:00","created_at":"2020-09-10T03:33:34-04:00","vendor":"Hero Arts","type":"Teacher Aids","tags":["3+ years","Multi","Rubber","Stamps \u0026 Stamp Pads","Wood"],"price":889,"price_min":889,"price_max":889,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157540417625,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSHOAD548","requires_shipping":true,"taxable":true,"featured_image":{"id":14726463193177,"product_id":4716362858585,"position":1,"created_at":"2020-09-10T03:33:34-04:00","updated_at":"2020-09-10T03:33:34-04:00","alt":null,"width":1600,"height":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOAD548.jpg?v=1599723214","variant_ids":[32157540417625]},"available":true,"name":"Completed With Teacher's Help","public_title":null,"options":["Default Title"],"price":889,"weight":454,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"085700045483","featured_media":{"alt":null,"id":6898050891865,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOAD548.jpg?v=1599723214"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOAD548.jpg?v=1599723214"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOAD548.jpg?v=1599723214","options":["Title"],"media":[{"alt":null,"id":6898050891865,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOAD548.jpg?v=1599723214"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOAD548.jpg?v=1599723214","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006588\u003cbr\u003e\u003cbr\u003eUPC: 085700045483\u003cbr\u003eEasy way to communicate with your students or children. Great for teachers or homeschoolers.\n\nHero Arts woodblock stamps offer long-lasting quality and precision in stamping. Each stamp features original designs. Our blocks originate from sustainably managed forests, and each is crafted from 100% natural rubber and is hand cut and assembled by us in the USA.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eWood block stamp with red rubberCrisp impressionHigh qualityWorks great with any ink\u003cbr\u003eSKU: ERSHOAD548"}
Completed With Teacher's Help

Completed With Teacher's Help

$8.89

MPN: 006588UPC: 085700045483Easy way to communicate with your students or children. Great for teachers or homeschoolers. Hero Arts woodblock stamps offer long-lasting quality and precision in stamping. Each stamp features original designs. Our blocks originate from sustainably managed forests, and each is crafted from 100% natural rubber and is...


More Info
{"id":4716360630361,"title":"(2 Pk) Weather Icons Mini Tub","handle":"2-pk-weather-icons-mini-tub","description":"MPN: 006588\u003cbr\u003e\u003cbr\u003eUPC: 194629105786\u003cbr\u003eThe Hero Arts Weather Icons Mini Tub contains stamps, a blue ink cube, and a cloud sticky note pad, all packaged in an adorable tub. Mix and match stamps to create fun cards and crafts. A set of 12 woodblock stamps made with deeply etched 100% red rubber. Sold as 2 sets of stamps.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003e12 mini wood stampsIncludes one 1\" ink cubeOne sticky note pad\u003cbr\u003eSKU: ERSHOALP425-2","published_at":"2022-11-03T01:59:19-04:00","created_at":"2020-09-10T03:30:47-04:00","vendor":"Hero Arts","type":"Teacher Aids","tags":["4+ years","Multi","Rubber","Stamps \u0026 Stamp Pads","Wood"],"price":3833,"price_min":3833,"price_max":3833,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157537927257,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSHOALP425-2","requires_shipping":true,"taxable":true,"featured_image":{"id":14726452314201,"product_id":4716360630361,"position":1,"created_at":"2020-09-10T03:30:47-04:00","updated_at":"2020-09-10T03:30:47-04:00","alt":null,"width":1600,"height":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOALP425-2.jpg?v=1599723047","variant_ids":[32157537927257]},"available":true,"name":"(2 Pk) Weather Icons Mini Tub","public_title":null,"options":["Default Title"],"price":3833,"weight":2812,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629105786","featured_media":{"alt":null,"id":6898039980121,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOALP425-2.jpg?v=1599723047"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOALP425-2.jpg?v=1599723047"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOALP425-2.jpg?v=1599723047","options":["Title"],"media":[{"alt":null,"id":6898039980121,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOALP425-2.jpg?v=1599723047"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOALP425-2.jpg?v=1599723047","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006588\u003cbr\u003e\u003cbr\u003eUPC: 194629105786\u003cbr\u003eThe Hero Arts Weather Icons Mini Tub contains stamps, a blue ink cube, and a cloud sticky note pad, all packaged in an adorable tub. Mix and match stamps to create fun cards and crafts. A set of 12 woodblock stamps made with deeply etched 100% red rubber. Sold as 2 sets of stamps.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003e12 mini wood stampsIncludes one 1\" ink cubeOne sticky note pad\u003cbr\u003eSKU: ERSHOALP425-2"}
(2 Pk) Weather Icons Mini Tub

(2 Pk) Weather Icons Mini Tub

$38.33

MPN: 006588UPC: 194629105786The Hero Arts Weather Icons Mini Tub contains stamps, a blue ink cube, and a cloud sticky note pad, all packaged in an adorable tub. Mix and match stamps to create fun cards and crafts. A set of 12 woodblock stamps made with deeply etched 100% red rubber. Sold as 2 sets of stamps.Key Features : 12 mini wood stampsIncl...


More Info
{"id":4716356862041,"title":"Stop Watch 6pk Neon Colors","handle":"stop-watch-6pk-neon-colors","description":"MPN: 006358\u003cbr\u003e\u003cbr\u003eUPC: 710858028858\u003cbr\u003eThe Champion Sports Stopwatch Neon Set is easy-to-use and packed with multiple features. The large digital display includes 1\/100 of a second precision, a lap counter, and 12 or 24 hour formats. Other useful features include calendar and time display, a daily alarm, and an hourly chime. It is also water and shock resistant, so you can train hard without worry. This set of six neon stopwatches comes with one each of neon blue, neon green, neon orange, neon pink, neon purple, and neon yellow.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eEasy to use and packed with featuresThe large digital display includes 1\/100 of a second precision, a lap counter, and 12 or 24 hour formatsOther features include calendar and time display, a daily alarm, and an hourly chimeAvailable in seven vibrant colors\u003cbr\u003eSKU: ERSCHS910NSET","published_at":"2025-02-21T21:40:13-05:00","created_at":"2020-09-10T03:27:17-04:00","vendor":"Champion Sports","type":"Teacher Aids","tags":["6+ years","Electronics","Plastic","Set of 6 Neon colors","Timers"],"price":8539,"price_min":8539,"price_max":8539,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157533306969,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSCHS910NSET","requires_shipping":true,"taxable":true,"featured_image":{"id":14726443073625,"product_id":4716356862041,"position":1,"created_at":"2020-09-10T03:27:17-04:00","updated_at":"2020-09-10T03:27:17-04:00","alt":null,"width":1800,"height":1800,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHS910NSET.jpg?v=1599722837","variant_ids":[32157533306969]},"available":true,"name":"Stop Watch 6pk Neon Colors","public_title":null,"options":["Default Title"],"price":8539,"weight":449,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"710858028858","featured_media":{"alt":null,"id":6898030739545,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1800,"width":1800,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHS910NSET.jpg?v=1599722837"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHS910NSET.jpg?v=1599722837"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHS910NSET.jpg?v=1599722837","options":["Title"],"media":[{"alt":null,"id":6898030739545,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1800,"width":1800,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHS910NSET.jpg?v=1599722837"},"aspect_ratio":1.0,"height":1800,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSCHS910NSET.jpg?v=1599722837","width":1800}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006358\u003cbr\u003e\u003cbr\u003eUPC: 710858028858\u003cbr\u003eThe Champion Sports Stopwatch Neon Set is easy-to-use and packed with multiple features. The large digital display includes 1\/100 of a second precision, a lap counter, and 12 or 24 hour formats. Other useful features include calendar and time display, a daily alarm, and an hourly chime. It is also water and shock resistant, so you can train hard without worry. This set of six neon stopwatches comes with one each of neon blue, neon green, neon orange, neon pink, neon purple, and neon yellow.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eEasy to use and packed with featuresThe large digital display includes 1\/100 of a second precision, a lap counter, and 12 or 24 hour formatsOther features include calendar and time display, a daily alarm, and an hourly chimeAvailable in seven vibrant colors\u003cbr\u003eSKU: ERSCHS910NSET"}
Stop Watch 6pk Neon Colors

Stop Watch 6pk Neon Colors

$85.39

MPN: 006358UPC: 710858028858The Champion Sports Stopwatch Neon Set is easy-to-use and packed with multiple features. The large digital display includes 1/100 of a second precision, a lap counter, and 12 or 24 hour formats. Other useful features include calendar and time display, a daily alarm, and an hourly chime. It is also water and shock resi...


More Info
{"id":4716350996569,"title":"(3 Ea) E-z Grader Purple Score Up To 95 Questions","handle":"3-ea-e-z-grader-purple-score-up-to-95-questions","description":"MPN: 005028\u003cbr\u003e\u003cbr\u003eUPC: 194629054084\u003cbr\u003eE-Z Grader Purple works the same as our best selling Original E-Z Grader. It's durable enough to withstand the battles of classroom instruction, and powerful enough to calculate grade percentages for up to 95 problems! This is a must have for all teachers! Purchase one for home and one for your classroom. Sold as a pack of 3.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eAccurately computes percentage scores on tests, quizzes, homework even papersCalculate grade percentages for up to 95 problemsMust-have for all teachers\u003cbr\u003eSKU: ERSEZ-5703PURPLE-3","published_at":"2024-09-30T07:01:50-04:00","created_at":"2020-09-10T03:22:29-04:00","vendor":"Original E-z Grader","type":"Teacher Aids","tags":["Graders","Paperboard","Purple","Teacher Resource"],"price":3267,"price_min":3267,"price_max":3267,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157526687833,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSEZ-5703PURPLE-3","requires_shipping":true,"taxable":true,"featured_image":{"id":14726422364249,"product_id":4716350996569,"position":1,"created_at":"2020-09-10T03:22:30-04:00","updated_at":"2020-09-10T03:22:30-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEZ-5703PURPLE-3.jpg?v=1599722550","variant_ids":[32157526687833]},"available":true,"name":"(3 Ea) E-z Grader Purple Score Up To 95 Questions","public_title":null,"options":["Default Title"],"price":3267,"weight":1769,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629054084","featured_media":{"alt":null,"id":6898010030169,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEZ-5703PURPLE-3.jpg?v=1599722550"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEZ-5703PURPLE-3.jpg?v=1599722550"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEZ-5703PURPLE-3.jpg?v=1599722550","options":["Title"],"media":[{"alt":null,"id":6898010030169,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEZ-5703PURPLE-3.jpg?v=1599722550"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEZ-5703PURPLE-3.jpg?v=1599722550","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005028\u003cbr\u003e\u003cbr\u003eUPC: 194629054084\u003cbr\u003eE-Z Grader Purple works the same as our best selling Original E-Z Grader. It's durable enough to withstand the battles of classroom instruction, and powerful enough to calculate grade percentages for up to 95 problems! This is a must have for all teachers! Purchase one for home and one for your classroom. Sold as a pack of 3.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eAccurately computes percentage scores on tests, quizzes, homework even papersCalculate grade percentages for up to 95 problemsMust-have for all teachers\u003cbr\u003eSKU: ERSEZ-5703PURPLE-3"}
(3 Ea) E-z Grader Purple Score Up To 95 Questions

(3 Ea) E-z Grader Purple Score Up To 95 Questions

$32.67

MPN: 005028UPC: 194629054084E-Z Grader Purple works the same as our best selling Original E-Z Grader. It's durable enough to withstand the battles of classroom instruction, and powerful enough to calculate grade percentages for up to 95 problems! This is a must have for all teachers! Purchase one for home and one for your classroom. Sold as a pa...


More Info
{"id":4716350931033,"title":"(2 Ea) 16in Blue Basic Collection Backpk","handle":"2-ea-16in-blue-basic-collection-backpk","description":"MPN: 006569\u003cbr\u003e\u003cbr\u003eUPC: 194629073993\u003cbr\u003eThis school bag features 2 compartments: the large compartment is great for larger items such as text book, binders, laptops, etc., while smaller compartment located in front is perfect for cell phones, keys, hand sanitizer and more. There are 2 zipper pulls for the large compartment, and 1 zipper pull for the smaller compartment. The 2 adjustable shoulder straps are nicely padded for comfort while carrying the backpack. There is a nylon handle on top of the backpack, convenient for hanging the backpack on hook outside of classrooms, or any hanger. Sold as a pack of 2 bags.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eOne large main compartment and small front compartment with zipper closureLightly padded, adjustable shoulder straps and carrying handleIdeal for schools, stadiums and travel\u003cbr\u003eSKU: ERSBAZ1031-2","published_at":"2024-12-09T05:34:34-05:00","created_at":"2020-09-10T03:22:27-04:00","vendor":"Bazic Products","type":"Teacher Aids","tags":["4+ years","600 D POLYESTER","Accessories","Blue"],"price":3285,"price_min":3285,"price_max":3285,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157526622297,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSBAZ1031-2","requires_shipping":true,"taxable":true,"featured_image":{"id":14726421905497,"product_id":4716350931033,"position":1,"created_at":"2020-09-10T03:22:27-04:00","updated_at":"2020-09-10T03:22:27-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1031-2.jpg?v=1599722547","variant_ids":[32157526622297]},"available":true,"name":"(2 Ea) 16in Blue Basic Collection Backpk","public_title":null,"options":["Default Title"],"price":3285,"weight":590,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629073993","featured_media":{"alt":null,"id":6898009636953,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1031-2.jpg?v=1599722547"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1031-2.jpg?v=1599722547"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1031-2.jpg?v=1599722547","options":["Title"],"media":[{"alt":null,"id":6898009636953,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1031-2.jpg?v=1599722547"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1031-2.jpg?v=1599722547","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006569\u003cbr\u003e\u003cbr\u003eUPC: 194629073993\u003cbr\u003eThis school bag features 2 compartments: the large compartment is great for larger items such as text book, binders, laptops, etc., while smaller compartment located in front is perfect for cell phones, keys, hand sanitizer and more. There are 2 zipper pulls for the large compartment, and 1 zipper pull for the smaller compartment. The 2 adjustable shoulder straps are nicely padded for comfort while carrying the backpack. There is a nylon handle on top of the backpack, convenient for hanging the backpack on hook outside of classrooms, or any hanger. Sold as a pack of 2 bags.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eOne large main compartment and small front compartment with zipper closureLightly padded, adjustable shoulder straps and carrying handleIdeal for schools, stadiums and travel\u003cbr\u003eSKU: ERSBAZ1031-2"}
(2 Ea) 16in Blue Basic Collection Backpk

(2 Ea) 16in Blue Basic Collection Backpk

$32.85

MPN: 006569UPC: 194629073993This school bag features 2 compartments: the large compartment is great for larger items such as text book, binders, laptops, etc., while smaller compartment located in front is perfect for cell phones, keys, hand sanitizer and more. There are 2 zipper pulls for the large compartment, and 1 zipper pull for the smaller...


More Info
{"id":4716344213593,"title":"(2 Ea) 7-color Dual Stamp Pad","handle":"2-ea-7-color-dual-stamp-pad","description":"MPN: 005083\u003cbr\u003e\u003cbr\u003eUPC: 194629086184\u003cbr\u003eYou won't be at a loss for color with this seven-color stamp pad. Including a black stamp pad on one side and green, blue, orange, red, yellow, and purple on the other side. Non-toxic, washable ink prints sharp and dark, and conforms to safety standards. Sold as a pack of 2 stamp pads.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eWashable ink for easy cleanupClear plastic divider between 6-color palette and jumbo black stamp pad keeps colors fresh and trueColors include black, green, blue, orange, red, yellow and purple\u003cbr\u003eSKU: ERSLER4275-2","published_at":"2022-12-10T15:23:40-05:00","created_at":"2020-09-10T03:16:35-04:00","vendor":"Learning Resources","type":"Teacher Aids","tags":["3+ years","felt","ink","Multi","Plastic","Stamps \u0026 Stamp Pads"],"price":3833,"price_min":3833,"price_max":3833,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157514399833,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSLER4275-2","requires_shipping":true,"taxable":true,"featured_image":{"id":14726396837977,"product_id":4716344213593,"position":1,"created_at":"2020-09-10T03:16:35-04:00","updated_at":"2020-09-10T03:16:35-04:00","alt":null,"width":1900,"height":1900,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER4275-2.jpg?v=1599722195","variant_ids":[32157514399833]},"available":true,"name":"(2 Ea) 7-color Dual Stamp Pad","public_title":null,"options":["Default Title"],"price":3833,"weight":408,"compare_at_price":null,"inventory_quantity":18,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629086184","featured_media":{"alt":null,"id":6897984503897,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1900,"width":1900,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER4275-2.jpg?v=1599722195"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER4275-2.jpg?v=1599722195"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER4275-2.jpg?v=1599722195","options":["Title"],"media":[{"alt":null,"id":6897984503897,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1900,"width":1900,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER4275-2.jpg?v=1599722195"},"aspect_ratio":1.0,"height":1900,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER4275-2.jpg?v=1599722195","width":1900}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005083\u003cbr\u003e\u003cbr\u003eUPC: 194629086184\u003cbr\u003eYou won't be at a loss for color with this seven-color stamp pad. Including a black stamp pad on one side and green, blue, orange, red, yellow, and purple on the other side. Non-toxic, washable ink prints sharp and dark, and conforms to safety standards. Sold as a pack of 2 stamp pads.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eWashable ink for easy cleanupClear plastic divider between 6-color palette and jumbo black stamp pad keeps colors fresh and trueColors include black, green, blue, orange, red, yellow and purple\u003cbr\u003eSKU: ERSLER4275-2"}
(2 Ea) 7-color Dual Stamp Pad

(2 Ea) 7-color Dual Stamp Pad

$38.33

MPN: 005083UPC: 194629086184You won't be at a loss for color with this seven-color stamp pad. Including a black stamp pad on one side and green, blue, orange, red, yellow, and purple on the other side. Non-toxic, washable ink prints sharp and dark, and conforms to safety standards. Sold as a pack of 2 stamp pads.Key Features : Washable ink for e...


More Info
{"id":4716342444121,"title":"Organization Station Pocket Chart","handle":"organization-station-pocket-chart","description":"MPN: 005083\u003cbr\u003e\u003cbr\u003eUPC: 765023022551\u003cbr\u003eOrganize your classroom and your students. Make collecting homework and sending notes home a breeze with this bright red and blue storage pocket organizer. Hangs easily from a bulletin board or our pocket chart stand. Made of sturdy, washable vinyl, the Organization Station® is 28.25\"W x 45\"H with 27 pockets that each measure 9\"W x 8.5\"H and come complete with name tags. Books and worksheets displayed, not included.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eHelps your students practice organizational skills, responsibility, and independenceHaving a pocket for each student makes it easy to keep track of homework assignmentsMade of washable vinyl\u003cbr\u003eSKU: ERSLER2255","published_at":"2023-11-17T07:18:01-05:00","created_at":"2020-09-10T03:15:00-04:00","vendor":"Learning Resources","type":"Teacher Aids","tags":["3+ years","Multi","Nylon","Pocket Charts","Vinyl"],"price":4794,"price_min":4794,"price_max":4794,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157511811161,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSLER2255","requires_shipping":true,"taxable":true,"featured_image":{"id":14726393299033,"product_id":4716342444121,"position":1,"created_at":"2020-09-10T03:15:00-04:00","updated_at":"2020-09-10T03:15:00-04:00","alt":null,"width":1600,"height":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2255.jpg?v=1599722100","variant_ids":[32157511811161]},"available":true,"name":"Organization Station Pocket Chart","public_title":null,"options":["Default Title"],"price":4794,"weight":794,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"765023022551","featured_media":{"alt":null,"id":6897980997721,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2255.jpg?v=1599722100"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2255.jpg?v=1599722100","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2255_3.jpg?v=1599722103","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2255_2.jpg?v=1599722104","\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2255_1.jpg?v=1599722106"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2255.jpg?v=1599722100","options":["Title"],"media":[{"alt":null,"id":6897980997721,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2255.jpg?v=1599722100"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2255.jpg?v=1599722100","width":1600},{"alt":null,"id":6897981423705,"position":2,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2255_3.jpg?v=1599722103"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2255_3.jpg?v=1599722103","width":2100},{"alt":null,"id":6897981489241,"position":3,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2255_2.jpg?v=1599722104"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2255_2.jpg?v=1599722104","width":2100},{"alt":null,"id":6897981522009,"position":4,"preview_image":{"aspect_ratio":1.0,"height":2100,"width":2100,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2255_1.jpg?v=1599722106"},"aspect_ratio":1.0,"height":2100,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSLER2255_1.jpg?v=1599722106","width":2100}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005083\u003cbr\u003e\u003cbr\u003eUPC: 765023022551\u003cbr\u003eOrganize your classroom and your students. Make collecting homework and sending notes home a breeze with this bright red and blue storage pocket organizer. Hangs easily from a bulletin board or our pocket chart stand. Made of sturdy, washable vinyl, the Organization Station® is 28.25\"W x 45\"H with 27 pockets that each measure 9\"W x 8.5\"H and come complete with name tags. Books and worksheets displayed, not included.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eHelps your students practice organizational skills, responsibility, and independenceHaving a pocket for each student makes it easy to keep track of homework assignmentsMade of washable vinyl\u003cbr\u003eSKU: ERSLER2255"}
Organization Station Pocket Chart

Organization Station Pocket Chart

$47.94

MPN: 005083UPC: 765023022551Organize your classroom and your students. Make collecting homework and sending notes home a breeze with this bright red and blue storage pocket organizer. Hangs easily from a bulletin board or our pocket chart stand. Made of sturdy, washable vinyl, the Organization Station® is 28.25"W x 45"H with 27 pockets that eac...


More Info
{"id":4716337954905,"title":"Marvel Super Hero Adventure Name Plates Self Adhesive","handle":"marvel-super-hero-adventure-name-plates-self-adhesive","description":"MPN: 005098\u003cbr\u003e\u003cbr\u003eUPC: 073168427934\u003cbr\u003eShowcase more than your students name! Eureka Self-Adhesive Name Plates provide a helpful visual reference with plenty of space for first and last names. Name plates are designed to stick to almost any surface and can be removed easily. Individual name plate measures 9 5\/8\" X 3 1\/4\". Each pack includes 36 name plates.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003e36 name plates per packageIndividual name plate measures 9 5\/8\" X 3 1\/4\".Full color illustrationSelf-adhesive design sticks to almost any surface and can be easily removed\u003cbr\u003eSKU: ERSEU-833071","published_at":"2025-04-10T19:31:25-04:00","created_at":"2020-09-10T03:10:31-04:00","vendor":"Eureka","type":"Teacher Aids","tags":["3+ years","Assorted","Name Plates","Paper"],"price":1232,"price_min":1232,"price_max":1232,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157502963801,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSEU-833071","requires_shipping":true,"taxable":true,"featured_image":{"id":14726380585049,"product_id":4716337954905,"position":1,"created_at":"2020-09-10T03:10:31-04:00","updated_at":"2020-09-10T03:10:31-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEU-833071.jpg?v=1599721831","variant_ids":[32157502963801]},"available":true,"name":"Marvel Super Hero Adventure Name Plates Self Adhesive","public_title":null,"options":["Default Title"],"price":1232,"weight":227,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"073168427934","featured_media":{"alt":null,"id":6897968250969,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEU-833071.jpg?v=1599721831"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEU-833071.jpg?v=1599721831"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEU-833071.jpg?v=1599721831","options":["Title"],"media":[{"alt":null,"id":6897968250969,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEU-833071.jpg?v=1599721831"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEU-833071.jpg?v=1599721831","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005098\u003cbr\u003e\u003cbr\u003eUPC: 073168427934\u003cbr\u003eShowcase more than your students name! Eureka Self-Adhesive Name Plates provide a helpful visual reference with plenty of space for first and last names. Name plates are designed to stick to almost any surface and can be removed easily. Individual name plate measures 9 5\/8\" X 3 1\/4\". Each pack includes 36 name plates.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003e36 name plates per packageIndividual name plate measures 9 5\/8\" X 3 1\/4\".Full color illustrationSelf-adhesive design sticks to almost any surface and can be easily removed\u003cbr\u003eSKU: ERSEU-833071"}
Marvel Super Hero Adventure Name Plates Self Adhesive

Marvel Super Hero Adventure Name Plates Self Adhesive

$12.32

MPN: 005098UPC: 073168427934Showcase more than your students name! Eureka Self-Adhesive Name Plates provide a helpful visual reference with plenty of space for first and last names. Name plates are designed to stick to almost any surface and can be removed easily. Individual name plate measures 9 5/8" X 3 1/4". Each pack includes 36 name plates....


More Info
{"id":4716333269081,"title":"Month-week Planner Wild Flowers Academic Jul-aug","handle":"month-week-planner-wild-flowers-academic-jul-aug","description":"MPN: 006282\u003cbr\u003e\u003cbr\u003eUPC: 040983295420\u003cbr\u003eThis planner will bring a smile to your face each time you use it with the wild flower prints inside and out. Features a wildflower design cover printed on 110-pound stock to stand up to ongoing use throughout the year. One month per two-page spread also features different lightly printed wildflower designs. Find the month quickly with the printed monthly indicators. Convenient vertical weekly format shows a full week appointments; one day per column including a full Saturday and Sunday, also with the lightly printed wildflower designs\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eAugust - July featuring 12 months for easy planningEach one month per two page spread and one week per two page spread has lightly printed wild flower field imagesFeatures printed monthly indicators to quickly find the date you needDurable two piece printed wild flower cover on 110 pound stock stands up to ongoing use throughout the yearIncludes a double-sided storage pocketFull Color Printing\u003cbr\u003eSKU: ERSHOD295474","published_at":"2024-04-15T06:25:50-04:00","created_at":"2020-09-10T03:05:22-04:00","vendor":"House Of Doolittle","type":"Teacher Aids","tags":["5+ years","Calendars","Paper","White"],"price":2626,"price_min":2626,"price_max":2626,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157493264473,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSHOD295474","requires_shipping":true,"taxable":true,"featured_image":{"id":14726367739993,"product_id":4716333269081,"position":1,"created_at":"2020-09-10T03:05:22-04:00","updated_at":"2020-09-10T03:05:22-04:00","alt":null,"width":1600,"height":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOD295474.jpg?v=1599721522","variant_ids":[32157493264473]},"available":true,"name":"Month-week Planner Wild Flowers Academic Jul-aug","public_title":null,"options":["Default Title"],"price":2626,"weight":272,"compare_at_price":null,"inventory_quantity":11,"inventory_management":"shopify","inventory_policy":"deny","barcode":"040983295420","featured_media":{"alt":null,"id":6897955405913,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOD295474.jpg?v=1599721522"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOD295474.jpg?v=1599721522"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOD295474.jpg?v=1599721522","options":["Title"],"media":[{"alt":null,"id":6897955405913,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOD295474.jpg?v=1599721522"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSHOD295474.jpg?v=1599721522","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006282\u003cbr\u003e\u003cbr\u003eUPC: 040983295420\u003cbr\u003eThis planner will bring a smile to your face each time you use it with the wild flower prints inside and out. Features a wildflower design cover printed on 110-pound stock to stand up to ongoing use throughout the year. One month per two-page spread also features different lightly printed wildflower designs. Find the month quickly with the printed monthly indicators. Convenient vertical weekly format shows a full week appointments; one day per column including a full Saturday and Sunday, also with the lightly printed wildflower designs\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eAugust - July featuring 12 months for easy planningEach one month per two page spread and one week per two page spread has lightly printed wild flower field imagesFeatures printed monthly indicators to quickly find the date you needDurable two piece printed wild flower cover on 110 pound stock stands up to ongoing use throughout the yearIncludes a double-sided storage pocketFull Color Printing\u003cbr\u003eSKU: ERSHOD295474"}
Month-week Planner Wild Flowers Academic Jul-aug

Month-week Planner Wild Flowers Academic Jul-aug

$26.26

MPN: 006282UPC: 040983295420This planner will bring a smile to your face each time you use it with the wild flower prints inside and out. Features a wildflower design cover printed on 110-pound stock to stand up to ongoing use throughout the year. One month per two-page spread also features different lightly printed wildflower designs. Find the ...


More Info
{"id":4716329959513,"title":"(3 Ea) Mickey Hello Duplicate Notes","handle":"3-ea-mickey-hello-duplicate-notes","description":"MPN: 005098\u003cbr\u003e\u003cbr\u003eUPC: 194629057795\u003cbr\u003eEureka Duplicate Notes are two part carbonless forms that allow you to keep and retain records. These notes are sure to come in handy for any meeting requests and notes sent home. Forms measure 5.5\" x 7.5\". Each pack includes 50 two-part carbonless forms. Sold as 3 packs for a total of 150 forms.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eGreat for record keepingEncourages parent participationEach form measuring 5.5\" x 7.5\"\u003cbr\u003eSKU: ERSEU-863202-3","published_at":"2024-08-26T03:11:07-04:00","created_at":"2020-09-10T03:01:46-04:00","vendor":"Eureka","type":"Teacher Aids","tags":["3+ years","Multi","Note Pads"],"price":3284,"price_min":3284,"price_max":3284,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157485662297,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSEU-863202-3","requires_shipping":true,"taxable":true,"featured_image":{"id":14726351388761,"product_id":4716329959513,"position":1,"created_at":"2020-09-10T03:01:46-04:00","updated_at":"2020-09-10T03:01:46-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEU-863202-3.jpg?v=1599721306","variant_ids":[32157485662297]},"available":true,"name":"(3 Ea) Mickey Hello Duplicate Notes","public_title":null,"options":["Default Title"],"price":3284,"weight":204,"compare_at_price":null,"inventory_quantity":33,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629057795","featured_media":{"alt":null,"id":6897939054681,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEU-863202-3.jpg?v=1599721306"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEU-863202-3.jpg?v=1599721306"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEU-863202-3.jpg?v=1599721306","options":["Title"],"media":[{"alt":null,"id":6897939054681,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEU-863202-3.jpg?v=1599721306"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSEU-863202-3.jpg?v=1599721306","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 005098\u003cbr\u003e\u003cbr\u003eUPC: 194629057795\u003cbr\u003eEureka Duplicate Notes are two part carbonless forms that allow you to keep and retain records. These notes are sure to come in handy for any meeting requests and notes sent home. Forms measure 5.5\" x 7.5\". Each pack includes 50 two-part carbonless forms. Sold as 3 packs for a total of 150 forms.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eGreat for record keepingEncourages parent participationEach form measuring 5.5\" x 7.5\"\u003cbr\u003eSKU: ERSEU-863202-3"}
(3 Ea) Mickey Hello Duplicate Notes

(3 Ea) Mickey Hello Duplicate Notes

$32.84

MPN: 005098UPC: 194629057795Eureka Duplicate Notes are two part carbonless forms that allow you to keep and retain records. These notes are sure to come in handy for any meeting requests and notes sent home. Forms measure 5.5" x 7.5". Each pack includes 50 two-part carbonless forms. Sold as 3 packs for a total of 150 forms.Key Features : Great f...


More Info
{"id":4716322062425,"title":"(2 Ea) 16in Black Basic Collection Backpk","handle":"2-ea-16in-black-basic-collection-backpk","description":"MPN: 006569\u003cbr\u003e\u003cbr\u003eUPC: 194629073986\u003cbr\u003eThis school bag features 2 compartments: the large compartment is great for larger items such as text book, binders, laptops, etc., while smaller compartment located in front is perfect for cell phones, keys, hand sanitizer and more. There are 2 zipper pulls for the large compartment, and 1 zipper pull for the smaller compartment. The 2 adjustable shoulder straps are nicely padded for comfort while carrying the backpack. There is a nylon handle on top of the backpack, convenient for hanging the backpack on hook outside of classrooms, or any hanger. Sold as a pack of 2 bags.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eOne large main compartment and small front compartment with zipper closureLightly padded, adjustable shoulder straps and carrying handleIdeal for schools, stadiums and travel\u003cbr\u003eSKU: ERSBAZ1030-2","published_at":"2024-12-09T05:34:35-05:00","created_at":"2020-09-10T02:52:45-04:00","vendor":"Bazic Products","type":"Teacher Aids","tags":["4+ years","600 D POLYESTER","Accessories","Black"],"price":3285,"price_min":3285,"price_max":3285,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":32157467443289,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ERSBAZ1030-2","requires_shipping":true,"taxable":true,"featured_image":{"id":14726327697497,"product_id":4716322062425,"position":1,"created_at":"2020-09-10T02:52:45-04:00","updated_at":"2020-09-10T02:52:45-04:00","alt":null,"width":1500,"height":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1030-2.jpg?v=1599720765","variant_ids":[32157467443289]},"available":true,"name":"(2 Ea) 16in Black Basic Collection Backpk","public_title":null,"options":["Default Title"],"price":3285,"weight":590,"compare_at_price":null,"inventory_quantity":50,"inventory_management":"shopify","inventory_policy":"deny","barcode":"194629073986","featured_media":{"alt":null,"id":6897915363417,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1030-2.jpg?v=1599720765"}},"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1030-2.jpg?v=1599720765"],"featured_image":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1030-2.jpg?v=1599720765","options":["Title"],"media":[{"alt":null,"id":6897915363417,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1030-2.jpg?v=1599720765"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/yourturnkeystore-829.myshopify.com\/cdn\/shop\/products\/ERSBAZ1030-2.jpg?v=1599720765","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"MPN: 006569\u003cbr\u003e\u003cbr\u003eUPC: 194629073986\u003cbr\u003eThis school bag features 2 compartments: the large compartment is great for larger items such as text book, binders, laptops, etc., while smaller compartment located in front is perfect for cell phones, keys, hand sanitizer and more. There are 2 zipper pulls for the large compartment, and 1 zipper pull for the smaller compartment. The 2 adjustable shoulder straps are nicely padded for comfort while carrying the backpack. There is a nylon handle on top of the backpack, convenient for hanging the backpack on hook outside of classrooms, or any hanger. Sold as a pack of 2 bags.\u003cbr\u003e\u003cbr\u003eKey Features : \u003cbr\u003e\u003cbr\u003eOne large main compartment and small front compartment with zipper closureLightly padded, adjustable shoulder straps and carrying handleIdeal for schools, stadiums and travel\u003cbr\u003eSKU: ERSBAZ1030-2"}
(2 Ea) 16in Black Basic Collection Backpk

(2 Ea) 16in Black Basic Collection Backpk

$32.85

MPN: 006569UPC: 194629073986This school bag features 2 compartments: the large compartment is great for larger items such as text book, binders, laptops, etc., while smaller compartment located in front is perfect for cell phones, keys, hand sanitizer and more. There are 2 zipper pulls for the large compartment, and 1 zipper pull for the smaller...


More Info